Bronx · Block 3158 · Lot 22 · 10458

2274 Grand Concourse

6 floors · 40 apartments · 29,817 sq ft · built 1919 · class C7 · owner of record: Concourse Enterprise Inc.

78open violations
$0ECB/OATH penalties owed
43HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 29,817 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1165 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-07 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
May 2, 2001CONSTRUCTION

#STF01AC
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
HPD (76) · C 43 · B 33 · A 0
IssuedClassViolationCorrect by
Nov 17, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT INTERMEDIATE LANDING, APPROX 8 SQ FT AT PUBLIC HALL STAIRS, 4th STORYDec 22, 2025
Oct 27, 2025BApt 3G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18051530 ISSUED 18-JUN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.Dec 1, 2025
Oct 27, 2025BApt 3G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WINDOW CASING IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18051529 ISSUED 18-JUN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27Dec 1, 2025
Jun 27, 2025BApt 3H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTAug 1, 2025
Mar 4, 2024CApt 4D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EASTApr 11, 2024
Mar 4, 2024CApt 4D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EASTApr 11, 2024
Feb 22, 2024BApt 5F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5F, 6th STORY, 1st APARTMENT FROM NORTH AT EASTMar 28, 2024
Feb 22, 2024BApt F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMar 28, 2024
Feb 22, 2024BApt 1G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1G, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHMar 28, 2024
Feb 22, 2024BApt 4F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4F, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 28, 2024
Feb 22, 2024BApt 4G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHMar 28, 2024
Feb 13, 2024BApt 5E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5E, 6th STORY, 1st APARTMENT FROM NORTH AT EASTMar 19, 2024
Feb 12, 2024BApt 1B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 18, 2024
Feb 7, 2024CApt 1H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS RATS IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMar 4, 2024
Jan 24, 2024C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Jan 28, 2024
Jan 24, 2024C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Jan 28, 2024
Nov 6, 2023CApt 4D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EASTNov 30, 2023
Nov 6, 2023CApt 4D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EASTNov 30, 2023
Dec 13, 2022BApt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 2SQFT ) IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 15317678 ISSUED 11-AUG-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3aJan 17, 2023
Dec 8, 2022CApt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTHJan 3, 2023
Dec 8, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTJan 1, 2023
Dec 8, 2022CApt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTHJan 3, 2023
Aug 15, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT SOUTH WALL, BASEBOARD AT EAST WALL, BASEBOARD ATSep 8, 2022
Aug 15, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT WEST WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 5th ROOM FROM EAST LOCSep 8, 2022
Aug 15, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APTSep 8, 2022
Aug 15, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT SOUTH WALL, BASEBOARD AT EAST WALL, BASEBOARD ATSep 8, 2022
Aug 15, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) CEISep 8, 2022
Aug 15, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RADIATOR FROM NORTH AT EAST WALL, NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL, 1sSep 8, 2022
Aug 15, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RISER FROM NORTH AT EAST WALL, SOUTH WALL IN THE BATHROOM LOCATED AT APT 4B, 4th SSep 8, 2022
Aug 15, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) EASSep 8, 2022
Aug 15, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DUMB WAITER FROM SOUTH AT WEST WALL, 1st RISER FROM WEST AT NORTH WALL, EAST WALL Sep 8, 2022
Jun 6, 2022BApt 3A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE UNEVEN WOOD SUB-FLOORING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 11, 2022
Jun 6, 2022BApt 3A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE PRIVATE HALLWAY LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 11, 2022
Dec 3, 2021BApt 4B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''Jan 7, 2022
Nov 12, 2021BApt 3E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 17, 2021
Nov 12, 2021BApt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 17, 2021
Nov 12, 2021BApt 3E · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 17, 2021
Nov 10, 2021BApt 4B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''Dec 15, 2021
Nov 5, 2021CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, NORTH WALL, WEST WALL, 1st WINDOW FRAME FROM WDec 13, 2021
Nov 5, 2021CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, NORTH WALL, SOUTH WALL, 1st WINDOW FRAME FROM Dec 13, 2021
Nov 3, 2021BApt 3F · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST Dec 8, 2021
Nov 3, 2021BApt 3G · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST Dec 8, 2021
Nov 3, 2021CApt 4B · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH ANov 27, 2021
Nov 3, 2021CApt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTHNov 29, 2021
Nov 3, 2021CApt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM WEST AT NORTHNov 29, 2021
Sep 17, 2021BApt 4A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 15 SQ,FT IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 22, 2021
Sep 16, 2021CApt 3A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st WINDOW FRAME FROM EAST AT SOUTH WALOct 24, 2021
Sep 16, 2021CApt 3A · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AOct 24, 2021
Sep 16, 2021CApt 5C · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AOct 24, 2021
Sep 15, 2021BApt 5A · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTOct 20, 2021
Sep 15, 2021CApt 3A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, NORTH WALL, SOUTH WALL IN THE BATHROOM LOCATEDOct 23, 2021
Sep 15, 2021CApt 3A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 3A, 3rd STORY, 1st Oct 23, 2021
Sep 15, 2021CApt 3A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 11, 2021
Sep 15, 2021CApt 3A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 11, 2021
Sep 15, 2021C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Sep 19, 2021
Sep 15, 2021BApt 1D · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOct 20, 2021
Sep 15, 2021BApt 4D · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 20, 2021
Sep 15, 2021CApt 3A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THOct 23, 2021
Sep 15, 2021CApt 3A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 3A, 3rd STORY, 1st Oct 23, 2021
Sep 15, 2021CApt 3A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THOct 23, 2021

Showing 60 of 76. Full list on the agency site.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 5:49 AM ET. BBL 2031580022.

Look up another building