1 floors · 8,340 sq ft · built 1920 · class K1 · owner of record: Jerome Properties Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-03-24 (Accepted). Agency page | Dec 31, 2026 in 64 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 18, 2009 | Boilers CLASS - 3 18B.48A #32065693H | Apr 17, 2009 IN VIOLATION | $0 |
| Aug 6, 2007 | Boilers Non-Hazardous B4A, 18A,18B, 11C. #32054486L | Sep 21, 2007 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 12, 2026 | CONSTRUCTION EMRGENCY WORK ORDER.THE BLDG SUFFRD FIRE DMG ON/AROUND 8/11/26.ROOF WAS PRTLLY OPEN W/MODERATELY TO SEVERELY DMGD ROOF JOISTS WALL STUDS WERE FIRE DMGD.WATER DMG THROUGHOUT THE BLDG.BLDG STRCT CMP.OWNR TO RTAIN NYSPE,GC REG W/DOB&ASBESTOS CNTRCTR TO IMMED:1.INSLL SDWLK SHED, 2.INSTLL TEMP SHORNG/BRA #FEU20504BP | DOB VIOLATION - ACTIVE |
| Aug 12, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUFFRD FIRE DMG ON/ARND 8/11/26.ROOF WAS PRTLLY OPEN/MODERATELY TO SEVERELY DMGD ROOF JOISTS.WALL STUDS WERE FIRE DMGD.WATER DMG THROUGHOUT BLDG.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PRMT ST #FEU20505BP | DOB VIOLATION - ACTIVE |
| Aug 12, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT, OBSERVED SEVERE FIRE, WATER AND SMOK E DAMAGE THROUGHOUT ALONG W/OPEN ROOF. SEVERELY CHARRED CEILING, WALL FRAMING. LARGE PORTIONS OF FIREPROOFING MISSING/REMOVED LEAVING PREMIS ES UNPROTECTED. VACATE ENTIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN CODE-CO #CER04DE | DOB VIOLATION - ACTIVE |
| Aug 12, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT, OBSERVED SEVERE FIRE, WATER, AND SMO KE DAMAGE THROUGHOUT, SEVERELY CHARRED CEILING AND WALL FRAMING, LARGE SECTIONS OF FIREPROOFING MISSING/REMOVED LEAVING PREMISES UNPROTECTED VACATE ENTIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN A CODE-COMPLIANT MANNER #CER06DE | DOB VIOLATION - ACTIVE |
| Aug 12, 2026 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT, OBSERVED FIRE, WATER, AND SMOKE DAMA GE THROUGHOUT, SEVERELY CHARRED CEILING/WALL FRAMING, LARGE PORTIONS O F FIREPROOFING MISSING/REMOVED LEAVING PREMISES UNPORTECTED. VACATE EN TIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN A CODE-COMPLIANT MANNER #CER03DE | DOB VIOLATION - ACTIVE |
| Aug 2, 2026 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT.OBSERVED SEVERE FIRE, WATER & SMOKE DAMAGE THROUGHOUT SEVERLY CHARRED CEILING/WALL FRAMING, LARGE SECTION OF FIRE PROOFING MISSING /REMOVED RENDERING PREMISES UNPROTECTED VACATE ENTIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER #CER05DE | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #01111 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #00461 | DOB VIOLATION - ACTIVE |
| Jun 22, 2018 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION #00129 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2020 Internal Inspection Affirmation of Correction for HP Device | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Jun 22, 2018 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 12, 2026 | DOB | CONSTRUCTION: EMRGENCY WORK ORDER.THE BLDG SUFFRD FIRE DMG ON/AROUND 8/11/26.ROOF WAS PRTLLY OPEN W/MODERATELY TO SEVERELY DMGD ROOF JOISTS WALL STUDS WERE FIRE DMGD.WATER DMG THROUGHOUT THE BLDG.BLDG STRCT CMP.OWNR TO RTAIN NYSPE,GC REG W/DOB&ASBESTOS CNTRCTR TO IMMED:1.INSLL SDWLK SHED, 2.INSTLL TEMP SHORNG/BRA | Open |
| Aug 12, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY: SEAL ALL ACCESSIBLE OPENINGS AND PENETRATIONS | Closed |
| Aug 12, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY: SEAL ALL ACCESSIBLE OPENINGS AND PENETRATIONS | Closed |
| Aug 12, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY: SEAL ALL ACCESSIBLE OPENINGS AND PENETRATIONS | Closed |
| Aug 12, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUFFRD FIRE DMG ON/ARND 8/11/26.ROOF WAS PRTLLY OPEN/MODERATELY TO SEVERELY DMGD ROOF JOISTS.WALL STUDS WERE FIRE DMGD.WATER DMG THROUGHOUT BLDG.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PRMT ST | Open |
| Aug 12, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NON-COMPLIANT, OBSERVED SEVERE FIRE, WATER AND SMOK E DAMAGE THROUGHOUT ALONG W/OPEN ROOF. SEVERELY CHARRED CEILING, WALL FRAMING. LARGE PORTIONS OF FIREPROOFING MISSING/REMOVED LEAVING PREMIS ES UNPROTECTED. VACATE ENTIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN CODE-CO | Open |
| Aug 12, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NON-COMPLIANT, OBSERVED SEVERE FIRE, WATER, AND SMO KE DAMAGE THROUGHOUT, SEVERELY CHARRED CEILING AND WALL FRAMING, LARGE SECTIONS OF FIREPROOFING MISSING/REMOVED LEAVING PREMISES UNPROTECTED VACATE ENTIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN A CODE-COMPLIANT MANNER | Open |
| Aug 12, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NON COMPLIANT, OBSERVED FIRE, WATER, AND SMOKE DAMA GE THROUGHOUT, SEVERELY CHARRED CEILING/WALL FRAMING, LARGE PORTIONS O F FIREPROOFING MISSING/REMOVED LEAVING PREMISES UNPORTECTED. VACATE EN TIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN A CODE-COMPLIANT MANNER | Open |
| Aug 12, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY: SEAL ALL ACCESSIBLE OPENINGS AND PENETRATIONS | Closed |
| Aug 2, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NON COMPLIANT.OBSERVED SEVERE FIRE, WATER & SMOKE DAMAGE THROUGHOUT SEVERLY CHARRED CEILING/WALL FRAMING, LARGE SECTION OF FIRE PROOFING MISSING /REMOVED RENDERING PREMISES UNPROTECTED VACATE ENTIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)