Bronx · Block 4341 · Lot 25 · 10467

2260 Barker Avenue

7 floors · 66 apartments · 47,282 sq ft · built 1997 · class D9 · owner of record: Mvp Housing Development Fund Company

46open violations
$6,875ECB/OATH penalties owed
0HPD class C (immediately hazardous)
63dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 47,282 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 428 days
Next cycle year 2027
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $66,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 846 days
Filing window not open yet
Annual boiler inspection (10 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-08 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5) · $6,875 owed
IssuedViolationHearingBalance
Aug 18, 2026Elevators CLASS - 1
CLASS1 ITEM: RTS FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER, SERVICE ELEVATOR EQUIPMENT AS PER CODE BC3001.2 & 27-987. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE, CREATING A HAZARDOUS
#39200860J
Nov 20, 2026
PENDING
$1,250
Dec 30, 2025Elevators CLASS - 1
RESPONDING TO A 311 ELEVATOR COMPLAINT, CLASS 1 VIOLATION ISSUED, A, DEVICE WAS FOUND TO BE OUT OF SERVICE CREATING A HAZARDOUS CONDITION AS PER 1RCNY 11-02 THIS DEVICE PROVIDE SERVICE IN A 7 STORY BUILDING,REM
#39172014P
Sep 25, 2026
IN VIOLATION
$3,125
Apr 8, 2025Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #919403. REMEDY: SUBMIT ACCEPTABLE REQU
#37035115K
Nov 7, 2025
IN VIOLATION
$2,500
Jan 14, 2025Elevators CLASS - 1
CLASS 1 ITEM: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE, CREATING A HAZARDOUS CONDITIO
#39135474N
Oct 3, 2025
IN VIOLATION
$0
Oct 1, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 WEST VERTICAL CRACK ABOVE BLDG ENTRYWAY.-EXP #2 NORTH SPALLING/MISSING MORTAR JOINTS BULKHEAD LEVEL
#35686651K
Dec 6, 2024
STIPULATION/IN-VIO
$0
DOB (15)
IssuedViolationStatus
Nov 13, 2021ELEVATOR

#9027/710927
DOB VIOLATION - ACTIVE
Nov 13, 2021ELEVATOR

#9027/710926
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#03320
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#03319
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#07868
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#07869
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#08819
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#08820
DOB VIOLATION - ACTIVE
May 30, 2014(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
#07825
DOB VIOLATION - ACTIVE
May 30, 2014(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
#07826
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#11361
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#11360
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#12415
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#12414
DOB VIOLATION - ACTIVE
Mar 10, 2000LOCAL LAW 10/81 - ELEVATOR

#02120
DOB VIOLATION - ACTIVE
DOB NOW Safety (26)
IssuedViolationStatus
Oct 14, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Sep 15, 2017Elevators EVCAT1
Active
Sep 15, 2017Elevators EVCAT1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
May 30, 2014Elevators ACC1
Active
May 30, 2014Elevators ACC1
Active
Mar 19, 2003Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Mar 10, 2000Elevators LL1081
Active
Mar 10, 2000Elevators LL1081
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 14, 2026DOB SafetyAEUHAZ: Open
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Aug 18, 2026ECBElevators: CLASS1 ITEM: RTS FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER, SERVICE ELEVATOR EQUIPMENT AS PER CODE BC3001.2 & 27-987. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE, CREATING A HAZARDOUSOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 10:03 AM ET. BBL 2043410025.

Look up another building