2.5 floors · 4 apartments · 5,208 sq ft · built 1905 · class C3 · owner of record: 2258 Hughes Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 5, 2026 | Construction CLASS - 2 8 STORY NB AT EXCAVATION PHASE ACTIVE SITE. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS/SSP. APPROVED PLANS SHOW 1 ST WINDOW WITH AIR CONDITIONER AT GROUND LEVEL OF ADJOINING PROPERTY TO BE PROTECTED AT EXP#2. #39560155N | Dec 18, 2026 PENDING | $1,250 |
| Oct 5, 2026 | Construction CLASS - 2 PROPOSED 8 STORY NB ACTIVE SITE AT EXCAVATION PHASE. OBSERVED YELLOW FDNY FLAMMABLE STORAGE CABINET, WITH 8 GASOLINE TANKS IN PLACE. UPON REQUEST TO CONTRACTOR FOR ACTIVE FDNY PERMITS. NONE WERE PROVIDED/MAINTA #39560156P | Dec 18, 2026 PENDING | $1,250 |
| Oct 5, 2026 | Construction CLASS - 2 8 STORY NB AT EXCAVATION PHASE ACTIVE SITE. OBSERVED WORK CONTRARY TO APPROVED PLANS. EXP#1 MISSING SPLICE PLATE CONNECTION ON WHALERS. ALSO BERM AT EXP#2 NOT 1 FT AWAY FROM RAKERS FOOTING, OBSERVED 5 FT AWAY. #39560140K | Dec 18, 2026 PENDING | $1,250 |
| May 5, 2026 | Construction CLASS - 2 WHILE FOLLOWING UP ON A COMPLAINT AT AN ACTIVE DEMOLITION JOBSITE. I OBSERVED A PLUME OF DUST RISING ABOVE THE JOBSITE FENCE CAUSED BY AN EXCAVATOR LOADING OPERATION, WITH NO DUST MITIGATION IN PLACE. NO WATER. #39553835L | Jul 15, 2027 DEFAULT | $5,000 |
| May 5, 2026 | Construction CLASS - 1 BC 3306.3. THE PERMIT HOLDER FAILED TO OBTAIN THE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF THE DEMOLITION OPERATION. STOP ALL DEMOLITION OPERATIONS. THE PERMIT HOLDER SHALL NOTIFY THE DEPARTMENT VIA P #39553857M | Jun 17, 2027 DEFAULT | $6,250 |
| May 5, 2026 | Construction CLASS - 2 DURING THE INSPECTION OF AN ACTIVE FULL DEMOLITION SITE. I OBSERVED NO POSTED MITIGATION PLAN ON THE FENCE, NO NOISE OR DUST CONTROL, AN EXCAVATOR, AND A TRUCK ON SITE. I REQUESTED THE DOT PERMIT, BUT NONE WAS #39553836N | Jul 15, 2027 DEFAULT | $3,125 |
| Jan 29, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED CONSTRUCTION INSTALLED AT EXP1. UPON RESEARCHING DOB RECORDS NO FN PERMIT WAS LOCATED. FAILED TO OBTAINED PROPER PERMIT PRIOR TO INSTALLATION OF CONSTRUCTION FENCE. #39549639M | Sep 11, 2026 IN VIOLATION | $625 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 6) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 5, 2026 | ECB | Construction: 8 STORY NB AT EXCAVATION PHASE ACTIVE SITE. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS/SSP. APPROVED PLANS SHOW 1 ST WINDOW WITH AIR CONDITIONER AT GROUND LEVEL OF ADJOINING PROPERTY TO BE PROTECTED AT EXP#2. | Open |
| Oct 5, 2026 | ECB | Construction: PROPOSED 8 STORY NB ACTIVE SITE AT EXCAVATION PHASE. OBSERVED YELLOW FDNY FLAMMABLE STORAGE CABINET, WITH 8 GASOLINE TANKS IN PLACE. UPON REQUEST TO CONTRACTOR FOR ACTIVE FDNY PERMITS. NONE WERE PROVIDED/MAINTA | Open |
| Oct 5, 2026 | ECB | Construction: 8 STORY NB AT EXCAVATION PHASE ACTIVE SITE. OBSERVED WORK CONTRARY TO APPROVED PLANS. EXP#1 MISSING SPLICE PLATE CONNECTION ON WHALERS. ALSO BERM AT EXP#2 NOT 1 FT AWAY FROM RAKERS FOOTING, OBSERVED 5 FT AWAY. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 1:44 PM ET. BBL 2030860021.