2 floors · 10,000 sq ft · built 1978 · class W8 · owner of record: Northeast Bronx Family Foundation Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 46 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-10-31 (Accepted). Agency page | Dec 31, 2026 in 46 days | 1 of 1 without an accepted 2026 report yet |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 16, 2023 | CONSTRUCTION REQUEST ADDITIONAL INFORMATION-RESPONDENT IS REQUESTED TO PROVIDE A S/S LETTER ALONG W/DETAILED CALCS,DWGS,FOUNDATION DETAILS,SOIL TYPES, ETC IN ACCORDANCE W/1RCNY 103-09 IDENTIFYING THE FACTURAL BASIS(INCL DATES PE PERSONALLY VISTED THE SITE)IF ENG'R ASSESMENT REPORT REGARD THE STRUCT STABILITY OF #RW20805BH | DOB VIOLATION - ACTIVE |
| Nov 4, 1991 | CONSTRUCTION #08JP01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Closed |
| Aug 5, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. NOTED: OBSERVED AT EXP 4(N. ELEV) CRACKED MORTARS AT JOINTS. ALSO OBSERVED AT SAME LOCATION PUSH OUT BRICKS FACING SCHOOL PLAY GROUND. REMEDY: REPAIR AND | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 1:17 AM ET. BBL 2058422002.