| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 505,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 166 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 166 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 776 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5153). Agency page | Dec 31, 2033 in 2602 days | Next due 2033 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-06 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 27, 2026 | Construction CLASS - 2 REISSUE#35691907L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT T.O.I THE PARAPET WALLS RAILINGS ABOVE THE CAFETERIA AND AUDITORIUM ARE LESS THAN 36 IN HEIGHT.CREATES DANGEROUS CONDITION OF FAL #35727176Z | Jun 4, 2026 POP/IN-VIO | $0 |
| Mar 27, 2026 | Construction CLASS - 2 REISSUE#35691909P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THE CONCRETE STAIR FROM PARKING LOT DOWN TO BASEMENT ARE IN SERIOUS DISREPAIR.THEY ARE CRACKED,CHIPPED,HAVE LOOSE NOSING CAUSING A T #35727174P | Jun 4, 2026 POP/IN-VIO | $0 |
| Mar 27, 2026 | Construction CLASS - 2 REISSUE#35691912X FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:THERE WERE SEVERAL EMERGENCY LIGHTS THAT WERE NOT O #35727177K | Jun 4, 2026 POP/IN-VIO | $0 |
| Mar 27, 2026 | Construction CLASS - 2 REISSUE#35691908N FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THERE IS WATER PENETRATION AT FOUNDATION WALLS THAT ALLOWS WATER INTO ELECTRIC METER ROOM WITH HIGH VOLTAGE EQUIPMENT.REM:REPAIR WAT #35727175R | Jun 4, 2026 POP/IN-VIO | $0 |
| Mar 21, 2025 | Construction CLASS - 2 RE-ISSUE #35672470Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THE PARAPET WALLS AT ROOF ABIVE CAFETERIA AND AUDITORIUM ARE AT LEASTS 36 INCHES CREATING AN UNSAFE CONDITION. REMEDY: REPAIR/R #35691907L | Apr 30, 2025 POP/IN-VIO | $0 |
| Mar 21, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: THERE WERE SEVERAL EMERGENCY LLIGHTS SCATTERED THROUGH OUT THE S #35691912X | Apr 30, 2025 POP/IN-VIO | $0 |
| Mar 21, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THE CONCRETE STAIR THAT LEAD FROM PARKING LOT TO THE BASEMENT ARE IN DISREPAIR. CRACKED AND SHIPPED WITH LOOSE NOSING. REMEDY: REPAIR/REPLACE CONCRE #35691909P | Apr 30, 2025 POP/IN-VIO | $0 |
| Mar 11, 2024 | Construction CLASS - 2 REISSUE#35665332K FAILURE TO MAINTAIN BUILDING WALLS.PARAPET WALLS AT ROOF OVER CAFETERIA AND AUDITORIUM ARE LESS THAN 36"IN HEIGHT CREATINGAN UNSAFE CONDITION.REM:MAINTAIN BUILDING WALK TO CODE. #35672470Y | May 3, 2024 POP/IN-VIO | $0 |
| Jan 30, 2023 | Construction CLASS - 2 REISSUE #35631723M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:PARAPET WALLS AT ROOF ABOVE CAFETERIA & AUDITORIUM UNSAFE WITH HEIGHT LESS THAN 36 INCHES.REMEDY:REPAIR/REPLACE/INCREASE HEIGHT OF #35665332K | May 17, 2023 POP/IN-VIO | $0 |
| Feb 2, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG TO CODE.OBSERVED AT T.O.I. THE PARAPET AT ROOF ABOVE THE CAFETERIA & AUDITORIUM IS NOT THE HEIGHT REQUIRED TO BE SAFE.IT IS LESS THAN 36 IN.(RE-ISSUE #35452228L)REMEDY:REPAIR/REPLACE/MA #35631723M | Apr 6, 2022 POP/IN-VIO | $0 |
| Mar 2, 2020 | Boilers CLASS - 2 FOUND 1 LAARS MODEL# LQ 625 GAS FIRED HOT WATER BOILER NOT REGISTERED, MAINTAIN BOILER; CORRECT VIOLATING CONDITION SUBMIT CERTIFICATE OF CORRECTION #39018701L | Mar 16, 2020 POP/IN-VIO | $0 |
| Aug 30, 2019 | Construction CLASS - 2 REISSUE 35271109X FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES NOET AT ROOF LEVEL AT CAFETERIA AND GYM ROOFS ALSO AUDITORIUM ROOF PARAPET WALL HEIGHT LESS TAHN 36 INCHES MAINTAIN BUILDING EXTERRIOR WALL #35452228L | Nov 20, 2019 POP/IN-VIO | $0 |
| Jun 29, 2018 | Construction CLASS - 2 REISSUE #35271109X FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES.NOTED:PARAPET HEIGHT (D) CAFETERIA AND AUDITORIUM ROOF IS LESS THAN 36INCHES IN HEIGHT. RMDY: MAINTAIN PARAPET HEIGHT TO CODE. #35329389Z | Oct 3, 2018 POP/IN-VIO | $0 |
| Feb 9, 2011 | Boilers CLASS - 2 50A/50B/PACIFC NATIONAL FTFB BLR,LP STEAM,OIL BOIL 1966/50A-TWO ORIGINAL SAFETY VALVES ON ONE REFERENCED BOILER ARE DECLARED OBSOLETE AND MUST BE REPLACED WITH ASME-APPROVED SAFETY VALVES.50B-NO FIXED ACCESS LA #32070019M | May 4, 2011 PENDING | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #28488 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #28489 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #28490 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)