6 floors · 54 apartments · 48,970 sq ft · built 1926 · class C1 · owner of record: 2244 Morris Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 48,970 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 20, 2026 | Construction CLASS - 1 OBSERVED MULTIPLE STEP CRACKS AND VERTICAL CRACKS THROUGHOUT FACADE AT EXPOSURES #2 AND #3 CRACKED WINDOW SILL AND MULTIPLE FLOWER POTS PARTIALLY BLOCKING FIRE ESCAPE., REPAIR AND/REPLACE #39208567R | Jan 15, 2027 PENDING | $2,500 |
| Oct 18, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED AT EXP#2 CRACKS AT MULTIPLE LOCATIONS., REPAIR AND/REPLACE #39208289X | Jan 15, 2027 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Oct 20, 2026 | CONSTRUCTION REQUESTING ENGINEERS REPORT DUE TO MULTIPLE STEP CRACKS AND VERTICAL CRACKS THROUGHOUT FACADE AT EXPOSURES #2 AND #3 CRACKED WINDOWSILLS #26-02429 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06514 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #45289 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01457 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 6, 2026 | Energy Grade - LL33 FTP-EN-EGRDEA FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER AD CODE SEC. 28-309.12.3 | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 27, 2026 | B | Apt 4J · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Dec 1, 2026 |
| Oct 27, 2026 | A | Apt 4J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Jan 30, 2027 |
| Oct 27, 2026 | B | Apt 4J · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT WINDOW IN THE KITCHEN LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Dec 1, 2026 |
| Oct 27, 2026 | A | Apt 4J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL, EAST WALL, SOUTH WALL, AND AT CEILING IN THE BATHROOM LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Jan 30, 2027 |
| Oct 27, 2026 | C | Apt 4J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQFT AT NORTH WALL, EAST WALL, SOUTH WALL, AND AT CEILING IN THE BATHROOM LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Nov 22, 2026 |
| Oct 27, 2026 | B | Apt 4J · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Dec 1, 2026 |
| Oct 27, 2026 | A | Apt 4J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Jan 30, 2027 |
| Feb 23, 2026 | B | Apt 4J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 30, 2026 |
| Mar 24, 2025 | B | Apt 4J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10SQFT AT CEILING AND EAST WALL. IN THE BATHROOM LOCATED AT APT 4J, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 28, 2025 |
| Oct 23, 2024 | B | Apt 4J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2.SQ. FT. AT CEILING IN THE BATHROOM LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' ORIGINAL VIOLATION 17068584 ISSUED 24-JUN-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRA | Nov 27, 2024 |
| Jun 27, 2024 | B | Apt 4J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND EAST WALL GREATER THAN 10SQ FT IN THE BATHROOM LOCATED AT APT 4J, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'' | Aug 1, 2024 |
| Nov 13, 2023 | B | Apt 1J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 12 SG.FT. AT CEILING IN THE BATHROOM LOCATED AT APT 1J, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 18, 2023 |
| Nov 13, 2023 | C | Apt 1J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1J, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 9, 2023 |
| Oct 6, 2023 | B | Apt 4J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE WINDOW CASING AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Nov 10, 2023 |
| Oct 6, 2023 | B | Apt 4J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Nov 10, 2023 |
| Oct 6, 2023 | B | Apt 4J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WINDOW CASING EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Nov 10, 2023 |
| Sep 5, 2023 | B | Apt 1J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1J, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTIO | Oct 10, 2023 |
| Sep 5, 2023 | B | Apt 3C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTIO | Oct 10, 2023 |
| Sep 5, 2023 | A | Apt 1I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE FOYER LOCATED AT APT 1I, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH | Dec 9, 2023 |
| Sep 5, 2023 | B | Apt 3A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3A, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTIO | Oct 10, 2023 |
| Sep 5, 2023 | B | Apt 2F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2F, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTIO | Oct 10, 2023 |
| Sep 5, 2023 | B | Apt 1A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1A, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTIO | Oct 10, 2023 |
| Sep 5, 2023 | B | Apt 3F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTIO | Oct 10, 2023 |
| Sep 5, 2023 | B | Apt 4D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4D, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTIO | Oct 10, 2023 |
| Sep 5, 2023 | B | Apt A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION | Oct 10, 2023 |
| Sep 5, 2023 | B | Apt 4J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTIO | Oct 10, 2023 |
| Sep 5, 2023 | B | Apt 1I · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1I, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTIO | Oct 10, 2023 |
| Aug 22, 2023 | C | Apt 4I · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Aug 26, 2023 |
| Aug 22, 2023 | C | Apt 4I · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Aug 26, 2023 |
| Dec 19, 2022 | C | Apt 1J · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RISER FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1J, 2nd STO | Jan 12, 2023 |
| Feb 10, 2021 | A | Apt 1I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST, THE BATHROOM LOCATED AT APT 1I, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH | May 16, 2021 |
| Dec 16, 2013 | B | Apt 2A · § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 2A, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Jan 20, 2014 |
| Jul 16, 2010 | A | Apt I · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ..SHEETROCK PARTITION ERECTED CREATING TWO ROOMS FROM ONE IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT I, 1st STORY, 1st APARTMENT FRO | Oct 19, 2010 |
| Jul 2, 2003 | B | Apt 1J · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 2ND STY SOUTH APT 1J NORTH SECTION. , SECTION '' '' | Aug 11, 2003 |
| Jul 2, 2003 | B | Apt 1J · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 2ND STY SOUTH APT 1J SOUTH SECTION. , SECTION '' '' | Aug 11, 2003 |
| Jul 2, 2003 | B | Apt 1J · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 2ND STY SOUTHEAST APT 1J. , SECTION '' '' | Aug 11, 2003 |
| Jul 2, 2003 | B | Apt 4D · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 5TH STY SOUTHEAST APT 4D. , SECTION '' '' | Aug 11, 2003 |
| Jul 2, 2003 | B | Apt 1F · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 3RD STY SOUTHWEST APT 1F NORTH SECTION. , SECTION '' '' | Aug 11, 2003 |
| Jul 2, 2003 | B | Apt 4D · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 6TH STY SOUTH APT 4D. , SECTION '' '' | Aug 11, 2003 |
| Jul 2, 2003 | B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 1ST STY SOUTHEAST APT D. | Aug 11, 2003 |
| Jul 2, 2003 | B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 1ST STY SOUTHEAST APT D SOUTH SECTION MS MARINEZ. | Aug 11, 2003 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 27, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Open |
| Oct 27, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Open |
| Oct 27, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT WINDOW IN THE KITCHEN LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Open |
| Oct 27, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL, EAST WALL, SOUTH WALL, AND AT CEILING IN THE BATHROOM LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Open |
| Oct 27, 2026 | HPD C | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQFT AT NORTH WALL, EAST WALL, SOUTH WALL, AND AT CEILING IN THE BATHROOM LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Open |
| Oct 27, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Open |
| Oct 27, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 4J, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Open |
| Oct 20, 2026 | DOB | CONSTRUCTION: REQUESTING ENGINEERS REPORT DUE TO MULTIPLE STEP CRACKS AND VERTICAL CRACKS THROUGHOUT FACADE AT EXPOSURES #2 AND #3 CRACKED WINDOWSILLS | Open |
| Oct 20, 2026 | ECB | Construction: OBSERVED MULTIPLE STEP CRACKS AND VERTICAL CRACKS THROUGHOUT FACADE AT EXPOSURES #2 AND #3 CRACKED WINDOW SILL AND MULTIPLE FLOWER POTS PARTIALLY BLOCKING FIRE ESCAPE., REPAIR AND/REPLACE | Open |
| Oct 18, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED AT EXP#2 CRACKS AT MULTIPLE LOCATIONS., REPAIR AND/REPLACE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 11:58 AM ET. BBL 2031710005.