5 floors · 19 apartments · 20,610 sq ft · built 1909 · class C7 · owner of record: Bh26 Mgmt. Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-19 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 13, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT CELLAR APT B2 - A RM WAS OBSERVED CREATED & OCCUPIED FOR SLEEPING W/O NATURAL LIGHT & VENTILATION., REPAIR AND/OR REPLACE #39138337K | Feb 13, 2026 IN VIOLATION | $1,250 |
| Feb 13, 2025 | Construction CLASS - 1 CONTRARY TO DOB/OFFICIAL RECORDS WHICH INDICATES PREMISES HAVING 19 CLASS 'A' APTS WITH 1 CELLAR APT INCLUDED. AT TIME OF INSPECTION - AN ADDL'T CLASS 'A' APT B1 WAS OBSERVED CREATED & OCCUPIED AT CELLAR WITH 3 #39138336Z | Feb 13, 2026 IN VIOLATION | $2,500 |
| Feb 13, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT BULKHEAD - OBSERVED AT TIME OF INSPECTION - LOOSE, CRACKED, BROKEN, LOOSE & HANGING PLASTER ON INTERIOR WALL WITH POTENTIAL TO COLLAPSE ONTO 5TH #39138339Y | Feb 13, 2026 IN VIOLATION | $2,500 |
| Feb 18, 2009 | Unknown CLASS - 2 28-105.1 H.B SMITH OIL FILLED BOILER INSTALLED W/O OBTAINING AN APPROVAL & FILLING A ALT-TYPE.2 PERMIT AS REQUIRED,EMERGENCY LAA210097125 FILED ON 11-01-08 REQUIRED AN ALT-2 PERMIT TO BE FILED WITHIN 60 DAYS OF #32065692X | Dec 17, 2009 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01042 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00243 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00259 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #01112 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #01953 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #04288 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #03157 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #00799 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #02069 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00860 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #03269 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #04411 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00381 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #01524 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #00416 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION #00389 | DOB VIOLATION - ACTIVE |
| Jun 22, 2018 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION #00110 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #05025 | DOB VIOLATION - ACTIVE |
| Jun 23, 2017 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION #00140 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #04461 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #08325 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #06820 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Jun 22, 2018 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Jun 23, 2017 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 27, 2025 | A | Apt 1C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 30, 2025 |
| Aug 26, 2025 | B | Apt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN WINDOW CASING AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 30, 2025 |
| Aug 26, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST AND WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 30, 2025 |
| Aug 26, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 30, 2025 |
| Aug 26, 2025 | C | Apt 2D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 21, 2025 |
| Jul 18, 2025 | C | Apt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 13, 2025 |
| Jul 18, 2025 | C | Apt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 13, 2025 |
| Jul 17, 2025 | B | Apt 4E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4E, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 21, 2025 |
| Jul 11, 2025 | B | Apt 1D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 15, 2025 |
| Jul 11, 2025 | B | Apt 1B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 15, 2025 |
| Jul 3, 2025 | C | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jul 7, 2025 |
| Jul 3, 2025 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jul 7, 2025 |
| Jun 2, 2025 | A | Apt 4C · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISERS IN THE KITCHEN LOCATED AT APT 4C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 5, 2025 |
| Nov 20, 2024 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 4C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 25, 2024 |
| Nov 20, 2024 | B | Apt 4C · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATH TUB IN THE BATHROOM LOCATED AT APT 4C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 25, 2024 |
| Nov 20, 2024 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 4C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 25, 2024 |
| Nov 20, 2024 | C | Apt 4C · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCKING DOOR KNOB AT FIRE ESCAPE ROOM ENTRANCE DOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 4C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 26, 2024 |
| Nov 8, 2024 | A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE METAL CORNICE AT BUILDING FRONT AT ROOF | Feb 11, 2025 |
| Nov 8, 2024 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT METAL CORNICE AT BUILDING FRONT AT ROOF | Feb 11, 2025 |
| Aug 23, 2024 | B | Apt 2D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT CEILING, NORTH, EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 2D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 27, 2024 |
| Aug 21, 2024 | C | Apt 2D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 16, 2024 |
| Oct 22, 1996 | C | Apt 3B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WALLS & CLG KITCHEN AT 2ND STY NORTH APT 3B ER1. , SECTION '' '' | Nov 11, 1996 |
| May 21, 1996 | C | Apt 3B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT 2ND STY NORTHWEST APT 3B CENTER ROOM EAST WALL 96012326. , SECTION '' '' | Jun 10, 1996 |
| May 21, 1996 | C | Apt 3B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT 2ND STY NORTHWEST APT 3B PRIVATE HALL NEAR BATHROOM NORTH WALL 96012326. , SECTION '' '' | Jun 10, 1996 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 12:21 PM ET. BBL 2032080015.