Bronx · Block 3050 · Lot 84 · 10457

2243 Bathgate Avenue

3 floors · 3 apartments · 3,168 sq ft · built 1901 · class C0 · owner of record: 2243 Bathgate Ave Llc

39open violations
$122,500ECB/OATH penalties owed
1HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 67 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual

Open violations

ECB / OATH (10) · $122,500 owed
IssuedViolationHearingBalance
Dec 28, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALL(S) AND APPURTENANCES. OBSERVED EXP #1 IN DISREPAIR WITH CRACKS, PARAPET WITH HOLES OF MISSING STUCCO. REM: MAINTAIN EXTERIOR BUILDING WALL(S).
#35373053N
Feb 15, 2019
DEFAULT
$25,000
Oct 12, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES AT EXPOSURE #1 MULTIPLE CRACKS AND MISSING MORTAR THROUGHOUT FRONT FACADE REMEDY: MAINTAIN EXTERIOR BUILDING WALLS.
#35346642H
Nov 30, 2018
DEFAULT
$12,500
Sep 4, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES. NOTED: AT EXP #1, FRONT FACADE ABOVE 3RD FL WINDOWS, MULTIPLE CRACKS IN VERTICAL AND HORIZONTAL AT PARAPET. REM: MAINTAIN EXTERIOR WALLS.
#35360436H
Oct 19, 2018
DEFAULT
$25,000
Jul 13, 2018Construction CLASS - 1
REISSUE# 35330763H DATE OF ISSUE 5/14/2018. FAILURE TO MAINTAIN BLDG WALL(S) APPURTENANCE. @ TIME OF INSP ABOVE 3RD FLR WINDOWS TO FACADES A MULTIPLE CRACKS IN VERTICAL & HORIZONTAL @ PARAPET EXP#1(FRONT). REM:
#35344690N
Aug 31, 2018
DEFAULT
$25,000
May 14, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES. @ TIME OF INSP ABOVE 3RD FLR WINDOWS TO FACADES A MULTIPLE CRACKS IN VERTICAL & HORIZONTAL @ PARAPET EXP#1 (FRONT) PARAPET LEANING TOWARD TO FRONT. REM: MAINTA
#35330763H
Jun 29, 2018
DEFAULT
$25,000
Mar 22, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.AT THE TIME OF INSPECTION I OBSERVED MULTIPLE CRACKS,VERTICAL AND HORIZONTAL AT BUILDINGPARAPET WALL EXPOSURE #1.ALSO OBSERVED PARAPET LEANING INWARDS AT THE
#35323190Y
May 18, 2018
WRITTEN OFF
$0
Jan 30, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES.OBSERVED -EXP#1 WITH SERVERAL VERTICAL CRACKS PARAPET WITH MISSING STUCCO. REMEDY: MAINTAIN BUILDING IN CODE COMPLIANT MANNER.
#35372875H
Jan 18, 2019
DEFAULT
$10,000
Apr 11, 2012Construction CLASS - 1
SEC. 28-302.2. FAILURE TO MAINTAIN. NOTED: UPON INSPECTION DEBRIS PILED IN BASEMENT ENTRANCE NOT REMOVED/PLYWOOD LOOSE AT 2ND FLR OVER SIDEWALK, HAZARDOUS. REMEDY: REMOVE DEBRIS/SECURE PLYWOOD @ 2ND FLR WINDOW.
#34935273K
Jun 1, 2012
WRITTEN OFF
$0
Mar 30, 2011Construction CLASS - 1
FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. DEFECT NOTED: AT FRONT OF BLDG, STAIRS LEADING TO CELLAR OFF PUBLIC SIDEWALK, A PORTION/SECTION IS MISSING AFTER THE 3RD STEP; METAL STAIRS SECTION MISSING TO
#34890025P
May 20, 2011
WRITTEN OFF
$0
Aug 2, 2010Construction CLASS - 1
UNLAWFUL ACTS. FAIL TO COMPLY W/COMM ORDER. NOTED: UPON INSPECTION BLDG FIRST FLOOR ENTRANCE OPEN & ACCESSIBLE TO PUBLIC/WINDOW BROKEN AT BASEMENT NOT SEALED/GARBAGE & DEBRIS STILL ON BASEMENT STAIR ENTRANCE. R
#34845184J
Oct 1, 2010
WRITTEN OFF
$0
DOB (11)
IssuedViolationStatus
Mar 6, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00190
DOB VIOLATION - ACTIVE
Jan 9, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00237
DOB VIOLATION - ACTIVE
Dec 12, 2018FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00095
DOB VIOLATION - ACTIVE
Nov 28, 2018FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00189
DOB VIOLATION - ACTIVE
Oct 3, 2018FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00151
DOB VIOLATION - ACTIVE
Aug 9, 2018FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00170
DOB VIOLATION - ACTIVE
Jun 13, 2018FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00174
DOB VIOLATION - ACTIVE
Jul 11, 2012FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00104
DOB VIOLATION - ACTIVE
Jun 29, 2011FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00118
DOB VIOLATION - ACTIVE
Feb 9, 2011FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00156
DOB VIOLATION - ACTIVE
Dec 2, 2010FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00647
DOB VIOLATION - ACTIVE
DOB NOW Safety (12)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 6)
Active
Mar 6, 2019AEUHAZ FTC-AEU-HAZ
Active
Jan 9, 2019AEUHAZ FTC-AEU-HAZ
Active
Dec 12, 2018AEUHAZ FTC-AEU-HAZ
Active
Nov 28, 2018AEUHAZ FTC-AEU-HAZ
Active
Oct 3, 2018AEUHAZ FTC-AEU-HAZ
Active
Aug 9, 2018AEUHAZ FTC-AEU-HAZ
Active
Jun 13, 2018AEUHAZ FTC-AEU-HAZ
Active
Jul 11, 2012AEUHAZ FTC-AEU-HAZ
Active
Jun 29, 2011AEUHAZ FTC-AEU-HAZ
Active
Feb 9, 2011AEUHAZ FTC-AEU-HAZ
Active
Dec 2, 2010AEUHAZ FTC-AEU-HAZ
Active
HPD (6) · C 1 · B 1 · A 4
IssuedClassViolationCorrect by
Apr 29, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 2, 2026
Feb 25, 2026AApt 1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMay 31, 2026
Feb 25, 2026AApt 1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMay 31, 2026
Jul 23, 2025B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF OVERGROWTH OF FOLIAGE UNDER FIRE ESCAPE AT REAR YARDAug 27, 2025
Jul 23, 2025C§ 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS DROP LADDER IIN EXTENDED POSITION AT 1st FIRE ESCAPE FROM NORTH AT WESTJul 29, 2025
Jun 4, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 7, 2025

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 1:22 PM ET. BBL 2030500084.

Look up another building