5 floors · 74,444 sq ft · built 1940 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 74,444 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 166 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 166 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 776 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2029). Agency page | Dec 31, 2029 in 1141 days | Next due 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-19 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 4, 2026 | Construction CLASS - 2 REISSUE: 35721489M DATE OF ISSUE: 08/11/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ALL EXTERIOR DOOR FRAMES ARE BROKEN ANDRESTED-AT 1ST FL AUDITORIUM ONE EXIT DOOR NOT SELF-CLOSING PROPERLY. 3 #35725468L | Aug 17, 2026 POP/IN-VIO | $0 |
| Aug 4, 2026 | Construction CLASS - 2 REISSUE #35721489M DATE OF ISSUE: 08/11/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FOUNDATION WALL EXIT-3 AT CELLAR LEVEL HAS DETERIORATION DUE TO WATER LEAK ALSO HAS MOLD SMELL. REMEDY: REPAI #35725469N | Aug 17, 2026 POP/IN-VIO | $0 |
| Aug 4, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMIATION FOREXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FL AUDITORIUM 5 PLACE #35725470K | Aug 17, 2026 POP/IN-VIO | $0 |
| Aug 11, 2025 | Construction CLASS - 2 REISSUE: 35683042L-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ALL EXTERIOR DOOR FRAMES ARE BROKEN AND RUSTED ON 1ST FLOOR. MAIN DOOR NOT SELF-CLOSING. AUDITORIUM DOORS NOT SELF-CLOSING. GYM DOORS SW #35721491L | Sep 10, 2025 POP/IN-VIO | $0 |
| Aug 11, 2025 | Construction CLASS - 2 REISSUE: 35683044PP-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: FOUNDATION WALL UNDER EXIT 3 @ CELLAR LEVEL HAS DETERIORATION DUETO WATER LEAK, ALSO HAS MOLD SMELL. REMEDY: COMPLY WITH CODE. #35721489M | Sep 4, 2025 POP/IN-VIO | $0 |
| Sep 17, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FOUNDATION WALLUNDER EXIT 3 IN CELLAR LEVEL IN AN ADVANCE STAGE OF DETERIORATION WATER COMING IN FROM STEP OF EXIT 3 THAT IS STINKING/IN THICK SECTION OF F #35683044P | Oct 22, 2024 POP/IN-VIO | $0 |
| Sep 17, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ALL EXTERIOR DOOR FRAMES BROKEN, RUSTED AND SOME WITH HOLES IN FRAMES AND SOME HAVE NO PART OF FRAME LEFT AT BASE METAL L BRACKET INSTALLED TO HOLD DOORS C #35683042L | Oct 22, 2024 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Aug 4, 2026 | ECB | Construction: REISSUE: 35721489M DATE OF ISSUE: 08/11/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ALL EXTERIOR DOOR FRAMES ARE BROKEN ANDRESTED-AT 1ST FL AUDITORIUM ONE EXIT DOOR NOT SELF-CLOSING PROPERLY. 3 | Open |
| Aug 4, 2026 | ECB | Construction: REISSUE #35721489M DATE OF ISSUE: 08/11/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FOUNDATION WALL EXIT-3 AT CELLAR LEVEL HAS DETERIORATION DUE TO WATER LEAK ALSO HAS MOLD SMELL. REMEDY: REPAI | Open |
| Aug 4, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMIATION FOREXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FL AUDITORIUM 5 PLACE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 3:45 AM ET. BBL 1020290011.