Manhattan · Block 914 · Lot 36 · 10016

222 East 34 Street

21 floors · 480 apartments · 541,505 sq ft · built 2002 · class D8 · owner of record: Rosebud Owner Llc

2open violations
$13,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
43dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 43 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 43 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 59 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $28,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 95 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 541,505 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 287 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 914). Agency page

Dec 31, 2034
in 2965 days
Next due 2034
Annual boiler inspection (6 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-27 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3) · $13,750 owed
IssuedViolationHearingBalance
Sep 8, 2026Cranes and Derricks CLASS - 1
DURING INSPECTION OF THE 21-STORY FACADE ALTERATION, OBSERVED SUSPENDED SCAFFOLD PLATFORM IN USE AT EXP?3. UPON REVIEW OF THEIR CD5 AND RELATED DOCUMENTS NO PRE AND POST INSTALLATION INSPECTION LETTER WAS PROVI
#39558948K
Nov 19, 2026
$10,000
Sep 8, 2026Construction CLASS - 1
DURING THE INSPECTION OF ALTERATION 21 STORY BUILDING, OBSERVED SUSPENDED SCAFFOLDS @EXP#3. SUSPENDED SCAFFOLD SETUP CONTRARY TO APPROVED CD-5. PLAN SHOWING OUTRIGGER BEAMS, IN USED OUTRIGGER BEAM AND C-HOOK I
#39558950J
Nov 19, 2026
$2,500
Sep 8, 2026Construction CLASS - 2
DURING INSPECTION OF THE 21-STORY BUILDING ALTERATION, OBSERVED C-HOOK IN USED AT EXPOSURE 3 UPON REQUEST OF MANUFACTURERS SPECIFICATION NON WAS PROVIDED. CONTRARY TO BC CODE 3301.7 (2014 CODE)
#39558945P
Nov 19, 2026
$1,250
DOB (1)
IssuedViolationStatus
Apr 25, 1997CONSTRUCTION

#06S3
VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Sep 8, 2026ECBCranes and Derricks: DURING INSPECTION OF THE 21-STORY FACADE ALTERATION, OBSERVED SUSPENDED SCAFFOLD PLATFORM IN USE AT EXP?3. UPON REVIEW OF THEIR CD5 AND RELATED DOCUMENTS NO PRE AND POST INSTALLATION INSPECTION LETTER WAS PROVIClosed
Sep 8, 2026ECBConstruction: DURING THE INSPECTION OF ALTERATION 21 STORY BUILDING, OBSERVED SUSPENDED SCAFFOLDS @EXP#3. SUSPENDED SCAFFOLD SETUP CONTRARY TO APPROVED CD-5. PLAN SHOWING OUTRIGGER BEAMS, IN USED OUTRIGGER BEAM AND C-HOOK IClosed
Sep 8, 2026ECBConstruction: DURING INSPECTION OF THE 21-STORY BUILDING ALTERATION, OBSERVED C-HOOK IN USED AT EXPOSURE 3 UPON REQUEST OF MANUFACTURERS SPECIFICATION NON WAS PROVIDED. CONTRARY TO BC CODE 3301.7 (2014 CODE)Closed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 4:18 AM ET. BBL 1009140036.

Look up another building