8 floors · 30 apartments · 62,800 sq ft · built 1908 · class D4 · owner of record: Gainsborough Studios C/O Bhs
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 48 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 64 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 62,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 169 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 169 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 292 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $162,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 465 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1144 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1030). Agency page | Dec 31, 2030 in 1509 days | Next due 2030 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-22 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 27, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED @ EXP2 EAST ELEVATION SPALLING AND MISSING BRICKS AT PARAPET ROOF SPALLING @ PARAPET. DEFECTS AT BULKHEAD, SPALL/FLAKE PAINT. REMEDY: REPAIR AND/OR REPLACE #SR0501NS | DOB VIOLATION - ACTIVE |
| Aug 27, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP1 NORTH ELEV,MISSING SECTION OF PA RAPET/CORNICE.EXP2 EAST ELEV,DAMAGED BRICKS,MISSING BRICK AT PARAPET.R EMEDY:REPAIR AND/OR REPLACE MISSING SECTIONS OF PARAPET FACADE #SR0501RF | DOB VIOLATION - ACTIVE |
| Sep 19, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING. OBSERVED ON EXP 1 N.ELEV:-CRACKED, DAMAGE MASONRY @ THE 3RD FL LINTEL & AT THE 6TH FL DECORATIVE MASONRY MULLON, CRACKS ON PARAPET. EXP2,3 & 4:-SPALLING ERODING BRICKS AT MULTIPLE FLS. ROOF: CRACKS IN TERRA-COTTA ON CHIMNIES. REMEDY: REPAIR AND OR REPLACE ALL DAMAGE FAC #SR0501RF | DOB VIOLATION - ACTIVE |
| Sep 19, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AS NOTE: I OBSERVED ON EXPOSURE #1 NORTH ELEVATION-CRACKED,DAMAGE MASONRY AT 3RD FL LINTEL @ AT 6FL DECORATIVE MASONRY MULLION #SR0501RF | DOB VIOLATION - ACTIVE |
| Dec 8, 2023 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED EXPO#1 DEFECTED TERRA COTTA STONE AT PARAPET AREA EXPOSURE #2 FACTURED TERRA COTTA AND DEGRADED MORTA JOINTS AT PARAPET ROOF CRACK TERRA COTTA ON REMEDY:REPAIR AND OR REPLACE #SR0501NS | DOB VIOLATION - ACTIVE |
| Aug 24, 2023 | CONSTRUCTION FAILURE TO MAINTAIN EXTERIOR OF BUILDING FACADE AND APPURTENANCES.AT TIME OF INSPECTION;OBSERVED CRACKED TERRA-COTTA STONES,CRACKED MORTAR JOINTS, AND SPALLED TERRA-COTTA AT EXPOSURE#1 NORTH ELEVATIONOBSERVED SPALLED BRICK AND DE-LAMINATED TERRA-COTTA @ EXPOSURE#2 EAST ELEVATION REMEDY:REPAIR DAMAGE #SR10501CC | DOB VIOLATION - ACTIVE |
| Feb 16, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #910746 | DOB VIOLATION - ACTIVE |
| Feb 6, 2023 | CONSTRUCTION FTM EXTERIOR BLDG FACADE AND APPURTENANCES. OBSERVED SPALLED TERRA- COTTA AND DAMAGED MORTAR JOINTS AT MULTIPLE LOCATIONS ON EXP1 NORTH ELEV. REMEDY: MAINTAIN EXTERIOR BLDG FACADE AND REPAIR DAMAMGED FACADE #SR10501CC | DOB VIOLATION - ACTIVE |
| Oct 24, 2022 | CONSTRUCTION FTM EXTERIOR BLDG FACADE AND APPURTENANCES. OBSERVED BROKEN WINDOW, CRACK IN STONE AND DAMAGED MORTAR JOINTS AT MULTIPLE LOCATIONS AT EXP1 REMEDY: MAINTAIN EXTERIOR BLDG FACADE AND REPAIR DAMAGED FACADE AS PER 1RCNY 106-04 #LLFA01AP | DOB VIOLATION - ACTIVE |
| May 20, 2022 | CONSTRUCTION FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. AT TIME OF INSPECTION OBSERVED EXP1 CRACK AND DAMAGED MORTAR JOINTS AT MULTIPLE LOCATIONS, BROKEN WINDOW GLASS. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND REPAIR DSMAGED FACADE AS PER 1RCNY 103-04 #LLFA01MR | DOB VIOLATION - ACTIVE |
| Feb 21, 2018 | FACADE SAFETY PROGRAM #HAZ87291 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 16, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Feb 21, 2018 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 8:15 PM ET. BBL 1010300046.