Manhattan · Block 1785 · Lot 7503 · 10035

2211 3 Avenue

11 floors · 108 apartments · 127,946 sq ft · built 2015 · class RM · owner of record: 2211 Third Avenue Mazal Llc

48open violations
$37,875ECB/OATH penalties owed
1HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-07-30 (Accepted). Agency page

Dec 31, 2026
in 65 days
2 of 2 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $658,980 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 117 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 127,946 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 186 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 186 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 430 days
Next cycle year 2027
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1785). Agency page

Dec 31, 2035
in 3352 days
Next due 2035

Open violations

ECB / OATH (8) · $37,875 owed
IssuedViolationHearingBalance
Jul 28, 2026Elevators CLASS - 1
CEASE USE: DOOR ZONE RESTRICTOR FOUND INOPERATIVE, PREVENTING PROPER RESTRICTED OPENING OF HOISTWAY DOORS WHEN THE CAR IS OUTSIDE THE UNLOCKING ZONE, IN VIOLATION OF ASME A17.1/CSA B44 2.12.5 AND 8.6.4.19. REM
#39198032Y
Apr 8, 2027
$1,250
May 20, 2026Construction CLASS - 2
AT TIME OF INSPECTION OF MIXED USE BUILDING WITH SIDEWALK SHED IN PLACE WITH REQUIRED EXTENSION BLOCKING EGRESS/DRIVEWAY/ ENTRANCE OF ADJOINING PROPERTY CAUSING HAZARDOUS CONDITIONS PER 3307.6.4.9.REMOVE OBSTRU
#39554324Y
Jul 30, 2026
DEFAULT
$10,000
Apr 20, 2026Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #917235. AGG1: PRIOR NOV 37026503H UNDER 28-302
#37036557M
Sep 24, 2026
IN VIOLATION
$3,125
Oct 16, 2024Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR FACADE AND APPURTENANCES. NOTE: CRACKED/DISPLACED MASONRY BRICK AT ROOF LEVEL OF EXPOSURE #1 NORTH ELEVATION. SIDEWALK SHED IN PLACE. REMEDY: MAINTAIN EXTERIOR FACADE, TAKE SAFETY M
#35686641R
Dec 26, 2024
DEFAULT
$6,250
Oct 16, 2024Construction CLASS - 2
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTE: DEFECTIVE/DAMAGED AND DISPLACED VERTICAL SUPPORT POST AND UNSECURE/LOOSE HORIZONTAL SUPPORT BEAM AT SIDEWALK SHED AT EXPOSURE #4(WEST ELEVATION). R
#35686640P
Dec 26, 2024
DEFAULT
$10,000
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#917325.REM:FILE ACCEPTABLE REPORT.
#37026503H
May 23, 2024
ADMIT/IN-VIO
$0
Sep 13, 2023Construction CLASS - 2
AT TIME OF INSPECTION OF 11 STORY MIXED USE BUILDING OBSERVED SIDEWALK SHED IN PLACE NOT MAINTAINED AS PER CODE 1. MISSING REQUIRED EXTENSIONS 2. NOT TIGHT TO FACADE CAUSING HAZARDOUS CONDITIONS.MAINTAIN PER CO
#39521671H
Mar 7, 2025
IN VIOLATION
$6,000
Sep 16, 2020Elevators CLASS - 1
CLASS 1 RESTORE TO SERVICE FOR PROPER INSPECTION BY DOB .
#39028777R
Jul 10, 2025
IN VIOLATION
$1,250
DOB (7)
IssuedViolationStatus
May 29, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECTED BLDG CONDITIONS. EXP3:UNFINISH BALCONY SLAB EXPOSED REBAR & MISSING EXTERIOR INSULATION FINISH SYSTEM. EXPOSURE 4: DEFECTED BALCONY SLAB AND SPALLING BRICKS. REMEDY: REPAIR AND/OR REPLACE
#SR1101NS
DOB VIOLATION - ACTIVE
Oct 16, 2024CONSTRUCTION
EMERGENCY WORK ORDER 10/16/24 DUE TO DEFECTIVE SIDEWALK SHED. 1) DEFECTIVE/DAMAGED & DISPLACED VERTICLE SUPPORT POST/COLUMN AND UNSECURED/LOOSE HORIZONTAL SUPPORT BEAM AT EXP#4 WEST ELEVATION REMEDY: IMMEDIATELY REPAIR/REPLACE VERTICLE POST & SECURE HORIZONTAL BEAM AT EXPOSURE #4 WEST ELEVATION (3RD
#LL11101RM
DOB VIOLATION - ACTIVE
Feb 22, 2024FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00086
DOB VIOLATION - ACTIVE
Dec 1, 2023FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2300452
DOB VIOLATION - ACTIVE
Nov 2, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00103
DOB VIOLATION - ACTIVE
Aug 2, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00144
DOB VIOLATION - ACTIVE
May 2, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00301
DOB VIOLATION - ACTIVE
DOB NOW Safety (21)
IssuedViolationStatus
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Feb 22, 2024Benchmarking - LL84 FTF-EN-BENCH
Active
Dec 1, 2023Energy Grade - LL33 FTP-EN-EGRDEA
Active
Nov 2, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Aug 2, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
May 2, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
Nov 28, 2022Facades FISPHAZ
CYCLE 9A UNSAFE REPORT FILED
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
HPD (14) · C 1 · B 9 · A 4
IssuedClassViolationCorrect by
Jun 8, 2026BApt 6M · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW SASH LOCK IN THE 1st ROOM FROM NORTH LOCATED AT APT 6M, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 13, 2026
Jun 1, 2026BApt 4G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 6, 2026
Jun 1, 2026CApt 4G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHJun 27, 2026
Aug 1, 2025BApt 6D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE FOYER LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM WEST AT NORTHSep 5, 2025
Aug 1, 2025BApt 6D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE FOYER LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM WEST AT NORTHSep 5, 2025
Apr 14, 2025BApt 2G · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CASEMENT WINDOW HANDLE AT SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHMay 19, 2025
Apr 14, 2025AApt 2K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTHJul 18, 2025
Aug 31, 2023AApt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHDec 4, 2023
Aug 31, 2023BApt 5G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 5, 2023
Aug 31, 2023BApt 5G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT SWITCH IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 5, 2023
Aug 31, 2023BApt 5G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 5, 2023
Aug 31, 2023BApt 5G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 5, 2023
Aug 31, 2023AApt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHDec 4, 2023
Feb 14, 2023AApt 7K · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET SEAL AT REFRIGERATOR AND FREEZER DOORS IN THE KITCHEN LOCATED AT APT 7K, 7th STORY, 1st APARTMENT FROM SOUTH AT WESTMay 20, 2023

Issued in the last 120 days

DateSourceWhatNow
Jul 28, 2026ECBElevators: CEASE USE: DOOR ZONE RESTRICTOR FOUND INOPERATIVE, PREVENTING PROPER RESTRICTED OPENING OF HOISTWAY DOORS WHEN THE CAR IS OUTSIDE THE UNLOCKING ZONE, IN VIOLATION OF ASME A17.1/CSA B44 2.12.5 AND 8.6.4.19. REMClosed