| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 35,388 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-18 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 3, 2020 | Boilers CLASS - 2 FOUND BURNHAM MODEL# V11 SERIAL# 65637200 GAS FIRED STEAM BOILER NOT REGISTERED, REGISTER THE BOILER AND SUBMIT A CERTIFICATE OF CORRECTION #39028145Z | Jan 6, 2021 DEFAULT | $3,125 |
| Aug 17, 2016 | Construction CLASS - 3 WORK WITHOUT A PERMIT.OBSERVED:APPROX.850SF OF CONCRETE PAVEMENT INSTALLED AT EXPOSURE #2(INNER COURT).NO DOB PERMITS ON FILE.REMEDY:OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION. #35176384P | Oct 3, 2016 DEFAULT | $0 |
| Jan 18, 2005 | Elevators Non-Hazardous 83** STAIR LIFT DEVICE #3V20084 RUNNING WITHOUT A FINAL SIGN OFF APPLICATION #EA655-97 REMEDY:MUST HAVE TESTED BEFORE RETURNING TO SERVICE CALL 212-566-5519 FOR APARTMENT. #38147412J | Mar 7, 2005 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #14968 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #29610 | DOB VIOLATION - ACTIVE |
| Jul 25, 1994 | LOCAL LAW 62/91 - BOILERS #03199 | DOB VIOLATION - ACTIVE |
| Oct 24, 1989 | ELECTRIC SIGNS #08X2 | DOB VIOLATION - ACTIVE |
| Oct 19, 1989 | CONSTRUCTION #08X2 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-NJ Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jul 25, 1994 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)