Manhattan · Block 1528 · Lot 11 · 10028

221 East 82 Street

6 floors · 24 apartments · 12,195 sq ft · built 1981 · class D9 · owner of record: Horizon Property Ii (East 82nd Street) L Lc

36open violations
$8,125ECB/OATH penalties owed
0HPD class C (immediately hazardous)
42dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 42 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 42 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 58 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 286 days
Registered through 2027-09-01
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-08 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (9) · $8,125 owed
IssuedViolationHearingBalance
Mar 16, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 SOUTH (1)SPALLING BALCONY SLAB AT2ND FL. (2)CRACKED, DEFECTIVE MORTAR JOINTS ALONG 7TH FLOOR LINTEL LIN
#35727005Y
Jun 25, 2026
IN VIOLATION
$0
Feb 4, 2025Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: OBSERVED AT EXPOSURE 1 SOUTH ELEVATION, SPALLING MASONRY, SPALLING CONCRETE BALCONY SLABS, DETERIORATED/BOWING LINTELS, AND DETERIORATED MOR
#35689902J
Apr 10, 2025
IN VIOLATION
$2,500
Dec 2, 2024Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTE:OBSERVED AT EXPOSURE 1(SOUTH ELEVATION)BULGING MASONRY,DETERIORATED MORTAR JOINTS AND SEVERLY DETERIORATED/BOWING LINTELS AT MULTIPLE LOCATION
#35686997H
Aug 21, 2025
IN VIOLATION
$2,500
Oct 4, 2024Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR FACADE AND APPURTENANCES. NOTES: (1)BULGING/DISPLACED BRICK MASONRY, PUSHING OFF SHELF ANGLES AT EXP #1(SOUTH ELEVATION) AT MULTIPLE LOCATAIONS. (2)DETERIORATED/RUSTED LINTEL AT 5TH
#35686631N
Jan 9, 2025
IN VIOLATION
$1,250
Apr 11, 2024Local Law CLASS - 2
FAILURE TO FILE AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #905726. REMEDY: SUBMIT ACCEPTABLE REQUIR
#37027746R
Apr 10, 2025
IN VIOLATION
$1,250
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #805726. AGG1: PRIOR NOV 37022282P UNDER 28-302
#37026071N
Jun 20, 2024
IN VIOLATION
$0
Oct 11, 2022Boilers CLASS - 2
BOILER SECTIONS LEAKING AT BACK OF BOILER-HEATING PUMP RELAY BOX W/O A COVER-EXPOSED ELECTRICAL WIRES AT HOT WATER HEATING MODULATING VALVE-OPEN ELECTRICAL BOX IN CEILING.
#39071719M
Jan 20, 2023
IN VIOLATION
$625
Oct 8, 2021Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#805726.REM:FILE ACCEPTABLE REPORT.
#37022282P
Jul 7, 2022
IN VIOLATION
$0
Nov 18, 2017Construction CLASS - 2
FAILURE TOMAINTAIN EXTERIOR BLDG FACADE & APPTS. AS NOTED: EXP. 1 DAMAGED MORTAR JOINTS, CRACKED WINDOW SILLS, DAMAGED JOINTS & LINTELS. REMEDY: MAINTAIN EXTERIOR BLDG FACADE, PROVIDE SAFETY MEASURES, REPAIR DA
#35264664J
Jan 4, 2018
IN VIOLATION
$0
DOB (9)
IssuedViolationStatus
May 1, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: OBSERVED AT EXPOSURE 1 SOUTH ELEVATION DEFECTIVE CONDITIONS. DEFLATED WINDOW LINTILS, HAIRLINE CRACKS, DAMAGED/OPEN JOINTS, PORTION OF SHELF ANGLES AND CORRISION OF BALCONY RAILINGS. REMEDY: REPAIR AND/OR REPLACE
#SR0802NS
DOB VIOLATION - ACTIVE
Mar 5, 2025FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00051
DOB VIOLATION - ACTIVE
Dec 11, 2024FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00168
DOB VIOLATION - ACTIVE
Sep 24, 2024CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE OBSERVED MASONRY PUSHING OFF SHELF ANGLES ON FLOORS 4,5,6 AT EXP1 SOUTH ELEV.AL SO OBSERVED DETERIORATING PUSHED LINTELS AT MULTIPLE LOCATIONS OF THE FACADE AT EXP1.REMEDY:REPAIR OR REPLACE
#SR10803DO
DOB VIOLATION - ACTIVE
May 7, 2024CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED MASONRY PUSHING OFF SHELF ANGLES AT 4,5,6 FLR ON EXP#1 (SOUTH ELEV) ALSO OBSERVED @ EXP 1 DETERIORATING/RUSTED LINTELS @ MULTIPLE LOCATIONS. REMEDY: FIX AND/OR REPLACE
#SR10805YK
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#02010
DOB VIOLATION - ACTIVE
Feb 21, 2018FACADE SAFETY PROGRAM

#HAZ87325
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#03883
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#03784
DOB VIOLATION - ACTIVE
DOB NOW Safety (16)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Mar 5, 2025AEUHAZ FTC-AEU-HAZ
Active
Dec 11, 2024AEUHAZ FTC-AEU-HAZ
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Feb 21, 2018Facades FISP
CYCLE 8B UNSAFE REPORT FILED
Active
Jan 26, 2018Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
HPD (3) · C 0 · B 3 · A 0
IssuedClassViolationCorrect by
Oct 2, 2019BApt 5A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2019
Oct 2, 2019BApt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2019
Oct 2, 2019BApt 5A · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN PIPE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2019

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 8:01 AM ET. BBL 1015280011.

Look up another building