Manhattan · Block 1661 · Lot 10 · 10029

221 East 111 Street

7 floors · 42 apartments · 32,000 sq ft · built 1920 · class D3 · owner of record: Wcg Associates 111 Street Llc

37open violations
$0ECB/OATH penalties owed
5HPD class C (immediately hazardous)
42dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 42 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 58 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 32,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 163 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 163 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 286 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 407 days
Next cycle year 2027
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $357,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 825 days
Filing window not open yet
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-19 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Feb 26, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENACES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 SOUTH (1)CRACKED WINDOW PANE 3RD FL. BY FE. (2)CRACKED BRICK 2MD FL AT FIRE ESCAPE .-EXP #3 NORTH (1)CRA
#35689989L
Nov 6, 2025
IN VIOLATION
$0
DOB (8)
IssuedViolationStatus
Dec 31, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
#00175
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#02770
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#03226
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#05849
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#05654
DOB VIOLATION - ACTIVE
Nov 30, 2007LOCAL LAW 11/98 - FACADE

#NRF43791
DOB VIOLATION - ACTIVE
Aug 8, 2002LOCAL LAW 11/98 - FACADE

#NRF51511
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01461
DOB VIOLATION - ACTIVE
DOB NOW Safety (19)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Dec 31, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
Active
Dec 31, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 31, 2009Boiler LBLVIO
Active
Jan 1, 2009Boiler LL6291
Active
Jan 3, 2008Boiler LL6291
Active
Nov 30, 2007Facades LL1198
CYCLE 6 NO REPORT FILED
Active
Nov 30, 2007Facades LL1198
CYCLE 6 NO REPORT FILED
Active
Jan 19, 2007Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Feb 13, 2004Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Feb 27, 2001Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
HPD (9) · C 5 · B 2 · A 2
IssuedClassViolationCorrect by
Apr 28, 2026AApt 7E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR HINGES IN THE 4th ROOM FROM NORTH LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM NORTH AT EASTAug 1, 2026
Aug 11, 2025CApt 2236D · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 2236D, 6th STORY, 1st APARTMENT FROM WEST AT NORTHAug 25, 2025
Jul 29, 2025BApt 1C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT OF MOLD AT CEILING , SOUTH WALL , WEST WALL , EAST WALL, CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 17789841 ISSUED 28-MAR-25 HAS BEESep 2, 2025
Jul 29, 2025BApt 1C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT OF MOLD AT SOUTH WALL SOUTH WALL IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 17789842 ISSUED 28-MAR-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISSep 2, 2025
Mar 31, 2025AApt 1C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE KITCHEN , THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHJul 4, 2025
Oct 10, 2023CApt 7C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7C, 7th STORY, 1st APARTMENT FROM WEST AT NORTHNov 5, 2023
Oct 10, 2023CApt 7C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 7C, 7th STORY, 1st APARTMENT FROM WEST AT NORTHNov 5, 2023
Apr 18, 2023CApt 7C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 7C, 7th STORY, 1st APARTMENT FROM WEST AT NORTHMay 14, 2023
Apr 18, 2023CApt 7C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 7C, 7th STORY, 1st APARTMENT FROM WEST AT NORTHMay 14, 2023

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 9:39 AM ET. BBL 1016610010.

Look up another building