Bronx · Block 3157 · Lot 26 · 10457

2200 Grand Concourse

1 floors · 6,180 sq ft · built 1930 · class K1 · owner of record: Ayelet Management Ll

38open violations
$13,125ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-05-29 (Accepted). Agency page

Dec 31, 2026
in 44 days
2 of 2 without an accepted 2026 report yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029

Open violations

ECB / OATH (6) · $13,125 owed
IssuedViolationHearingBalance
Jan 28, 2021Construction CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BUILDING DEPT RECORDS. AT TIME OF INSPECTION,I OBSERVED A COMMERCIAL STRIP MALL W/ 5 VEHICLES PARKED ON LOT. OWNER PAINTED LINES INDICATING PARKING SPOTS FOR
#35441693N
Apr 16, 2021
DEFAULT
$6,250
Jan 28, 2021Construction CLASS - 2
WORK W/O PERMIT. AT TIME OF INSPECTION,I OBSERVED AT EXPOSURE#1,2 CURBCUTS,BOTH ARE APPROX 30'. C OF O#49559 DATED 11/18/74 DOES NOT LIST CURB-CUT,ALSO NO PERMITS ON FILE W/ DOB. CURB CUTS ARE LEADING TO STRIP
#35441694P
Apr 16, 2021
DEFAULT
$6,250
Jan 11, 2019Boilers CLASS - 2
B254,19B,36. 36-FOUND SECOND LARRS HOT WATER BOILER NOT REGISTERED WITH THIS DEPT.
#32098478X
Mar 1, 2019
IN VIOLATION
$0
Jan 11, 2019Boilers CLASS - 2
B254,36,19B. 36-FOUND LAAR HOT WATER BOILER AT SITE NOT REGISTERED WITH THIS DEPT.
#32098477Y
Mar 1, 2019
IN VIOLATION
$625
Feb 18, 2009Boilers CLASS - 2
50A.51 50A SPILLAGE OF COMBUSTABLE PRODUCTS IN BOLIER RM FROM DRAFT HOOD OF NATCO HOT WATER BOILER POSSIBLE DEFECTIVE EXHAUST VENT ON RM CORRECT CONDITION IMMEDIATELY
#32065696N
Apr 17, 2009
IN VIOLATION
$0
Sep 13, 2006Elevators Non-Hazardous
11X10/14M7/12Q3/66O2/66Z9/66P16/39P16/23X10/38O2/38Y2/34Q3/28Q3.11X10-ELEV. NOT RESPONDING TO 4TH & 5TH FLR CAR BUTTONS.66-REMOVE WATER & CLEAN PIT. 23-ELEV. NOT RESPONDING TO 4TH & 5TH FLR HALL BUTTON.
#38161168H
Mar 23, 2007
WRITTEN OFF
$0
DOB (15)
IssuedViolationStatus
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
#03396
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
#01029
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#21023
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
#04559
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
#02228
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
#04415
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#20698
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
#01562
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00416
DOB VIOLATION - ACTIVE
Jan 17, 2020LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#01052
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#07041
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#05310
DOB VIOLATION - ACTIVE
Mar 3, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
#05285
DOB VIOLATION - ACTIVE
Mar 3, 2015HIGH PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
#00486
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#07352
DOB VIOLATION - ACTIVE
DOB NOW Safety (17)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Nov 14, 2023Boiler FTC-BE-EXT-HP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for HP Device
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Jan 17, 2020Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Mar 3, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Active
Mar 3, 2015Boiler HBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
Active
Dec 31, 2009Boiler LBLVIO
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 10:17 PM ET. BBL 2031570026.

Look up another building