Brooklyn · Block 2522 · Lot 6 · 11222

220 Franklin Street

4 floors · 8 apartments · 5,700 sq ft · built 1928 · class C1 · owner of record: 220 Franklin Llc

100open violations
$61,024ECB/OATH penalties owed
7HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-07-17 (Accepted). Agency page

Dec 31, 2026
in 65 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 796 days
Next cycle year 2028

Open violations

ECB / OATH (34) · $61,024 owed
IssuedViolationHearingBalance
Jan 31, 2023Construction CLASS - 1
OBSERVED IN THE BASEMENT IN THE BOILER ROOM HOT WATER HEATERS VENTS ARE BACK PITCHED. GAS UNION ON GAS PIPE WHICH CONTRARY TO FGC REFER TO SECTION 411.16 AND SECTION 503.3, REPAIR AND/REPLACE
#39078751Y
Oct 16, 2023
IN VIOLATION
$1,250
Jan 31, 2023Construction CLASS - 1
OBSERVED IN BASEMENT IN BOILER ROOM INSTALLED TWO NEW HOT WATER HEATERS. ALL WORK DONE 100 PERCENT COMPLETED NO PERMITS ON FILE .ORDINARY PLUMBING WORK CANNOT BE DONE ON THIS LOCATION BASED ON OCCUPANCY GROUP C
#39078752X
Oct 16, 2023
IN VIOLATION
$1,250
Sep 9, 2022Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTED ATOI OBSERVED FIRE ESCAPE BASKETS PLATFORMS&RAILING ON 2,3,4FL LEVEL NOTICEABLY SLOPED DOWNWARD@EXP3 REAR FACADE.ALSO FIRE ESCAPE LADDERS ARENT STRAIGHT.RE
#35581967X
Mar 15, 2023
IN VIOLATION
$625
Sep 27, 2021Construction CLASS - 1
NO COMPLIANCE RECORDED FOR SUMMONS # 39012690H SUMMONS WAS ISSUED 11/12/2019, COMPLY WITH COMMISSIONER'S ORDER
#39048175H
Oct 3, 2022
IN VIOLATION
$2,500
Jun 24, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYAND FILE A COFC FOR VIOLATION#35465683X ISSUED ON 1/15/2020 PURSUANT T
#35554397J
Sep 21, 2022
IN VIOLATION
$1,250
Jun 24, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYAND FILE A COFC FOR VIOLATION#35321087R ISSUED ON 3/24/2018 PURSUANT T
#35580628R
Sep 21, 2022
IN VIOLATION
$1,250
Jun 24, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYAND FILE A COFC FOR VIOLATION#35465681M ISSUED ON 1/15/2020 PURSUANT T
#35554399N
Sep 21, 2022
IN VIOLATION
$1,250
Jun 24, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYAND FILE A COFC FOR VIOLATION#35405693P ISSUED ON 3/22/2019 PURSUANT T
#35580626N
Sep 21, 2022
IN VIOLATION
$1,250
Jun 24, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYAND FILE A COFC FOR VIOLATION#35405692N ISSUED ON 3/22/2019 PURSUANT T
#35580625L
Sep 21, 2022
IN VIOLATION
$1,250
Jun 24, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYAND FILE A COFC FOR VIOLATION#35330116L ISSUED ON 6/12/2018 PURSUANT T
#35580627P
Sep 21, 2022
IN VIOLATION
$3,125
Jun 24, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYAND FILE A COFC FOR VIOLATION#35465684H ISSUED ON 1/15/2020 PURSUANT T
#35554396H
Sep 21, 2022
IN VIOLATION
$3,125
Jun 24, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYAND FILE A COFC FOR VIOLATION#35465682Y ISSUED ON 1/15/2020 PURSUANT T
#35554398L
Sep 21, 2022
IN VIOLATION
$3,125
May 18, 2021Construction CLASS - 1
FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY NOTED AT 4TH FLOOR HALLWAY USED FOR STORAGE OF DISHWASHER UNIT AND RACK OBSTRUCTING PASSAGE TO ROOF EXIT.PREVIOUS NOV#35438470Z.REM:REMOVE OBSTRUCTION.
#35511045X
Nov 17, 2021
IN VIOLATION
$312
Feb 27, 2021Construction CLASS - 2
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION W/THE DEPT OF BLDGS.NOTED:AT TIME OF INSPECTION,OBSERVATIONOF A METAL ERECTED DECK ATTACHED TO BULK HEAD AT ROOF LEVEL REMAINS UN
#35536923L
Jul 7, 2021
DEFAULT
$6,250
Jan 15, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERTIFICAT EOF OCCRECTION WITH THE DEPT OF BUIDLING FOR THE ECB VIOLATION #35405692N ISSUED ON 03-22-2019 FILE A CERTIFICATE OF CORRECTION
#35465681M
Sep 21, 2022
IN VIOLATION
$1,250
Jan 15, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDING FOR THE ECB VIOLATION #35330166L ISSUED ON 06-12-2018 PREVIOUS ECB VIOLATION #35405693P FILE A CERTI
#35465684H
Sep 21, 2022
IN VIOLATION
$3,125
Jan 15, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDING FOR THE ECB VIOLATION#35321087R ISSUED ON 03-24-2018 PREVIOUS ECB VIOLATION #35405692N FILE A CERTIFI
#35465683X
Jan 7, 2021
DEFAULT
$10,000
Jan 15, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT FO BUILDING FOR THE ECB VIOLATION #35405693P ISSUED ON 03-22-2019.FILE A CERTIFICATE OF CORRECTION
#35465682Y
Sep 21, 2022
IN VIOLATION
$1,250
Nov 12, 2019Plumbing CLASS - 1
GAS BEING SUPPLIED TO BUILDING WITHOUT INSPECTION AND CERTIFICATION BY DOB. AT TIME OF INSPECTION IN APARTMENT 2L I OBSERVED NEW GAS PIPING FOR GAS STOVE. OLD 1/2 INCH GAS LINE WAS CAPPED. WORK WAS DONE UNDER J
#39012690H
Oct 3, 2022
IN VIOLATION
$5,000
Mar 22, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITION CITED IN NOV# 35330116L. REMEDY: FILE A CERTIFICATE OF CORRECTION
#35405693P
Jul 3, 2019
IN VIOLATION
$1,250
Mar 22, 2019Construction CLASS - 2
FAILURE TO COMPLY W/ COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION W/ THE DOB FOR VIOLATING CONDITION CITED IN NOV# 35321087R. PREVIOUS VIOLATION# 35330116L REMEDY: FILE A CERTIFICATE OF CORRECTION
#35405692N
Jul 1, 2019
IN VIOLATION
$3,125
Dec 17, 2018Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35312896M ISSUED ON 02-26-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01(D)(2). AN ACCEPTABLE CERTIFICATE HAS NOT BEEN FILED DESPITE THE
#37013920X
Sep 23, 2019
IN VIOLATION
$1,250
Nov 20, 2018Construction CLASS - 2
FAILURE TO COMPLY W/ COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35274571J ISSUED ON 1/17/18, AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2). AN ACCEPTABLE CERTIFICA
#37012459M
Mar 25, 2019
IN VIOLATION
$1,250
Jun 12, 2018Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A C OF C W/THE DOB'S FOR ECB VIO#35321088Z ISSUED ON 3-24-18. REMEDY: FILE A C OF C.
#35330115J
Nov 7, 2018
IN VIOLATION
$1,250
Jun 12, 2018Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A C OF C W/THE DOB'S FOR ECB VIO#35321087R ISSUED ON 3-24-18. REMEDY: FILE A C OF C.
#35330116L
Aug 13, 2018
IN VIOLATION
$1,250
Mar 24, 2018Construction CLASS - 2
WORK WITHOUT A PERMIT.WORK NOTED:AT ROOF LEVEL INSTALLED METAL FRAMED DECK APPROX 24'X30'NEXT TO ROOF BUCKHEAD INSTALLED METAK FRAME DUNNAGEFOR AIR CONDITIONAL MACHINE SUPPORT;INSTALLED ELECTRICAL WIRE FOR AIR
#35321087R
May 21, 2018
WRITTEN OFF
$0
Mar 24, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.LACK OF REQUIREDNUMBER OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE)27-366;BC102.1.1(2014 CODE)FOR TRANSIENT USE.REM:DISCONTINUE ILLEGAL OCCUPANCY
#35320991K
Nov 7, 2018
IN VIOLATION
$312
Mar 24, 2018Quality of Life CLASS - 2
PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT RESIDENTAL PURPOSES.DEPT OF BUILDINGS RECORDS INDICATE BUILDING TO BE LEGALLY APPROVED AS A CLASS "A" MULTIPLE DWELLING NOW APT 3R USED/CONVERTED TO TR
#35320989L
Nov 7, 2018
IN VIOLATION
$1,250
Mar 24, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.FAILURE TO PROVIDE GUARDRAILS AT ROOF LEVEL AS PER 1509.8(BC 2014)REM:COMPLY WITH CODE.
#35321088Z
Nov 7, 2018
IN VIOLATION
$1,250
Feb 26, 2018Unknown CLASS - 2
UNAPPROVED,UNSAFE,UNSUITABLE ELECTRICAL EQUIPMENT DEVICES,APPARATUS APPLIANCES MATERIALS OR WIRING IN USE.OPEN FIXTURE WIRING IN APARTMENT 1R CEILING AND DEFECTIV ELECTRICAL OUTLETS THROUGHOUT APARTMENT.REM:COM
#35312896M
Apr 23, 2018
STIPULATION/IN-VIO
$400
Jan 17, 2018Unknown CLASS - 2
UNAPPROVED UNSAFE UNSUITABLE ELECTRICAL EQUIPMENT DEVICES APPARATUS APPLIANCES MATERIALS OR WIRING IN USE. DEFECTIVE ELECTRICAL OUTLETS THROUGHOUT APT#1R. REMEDY: COMPLY W/EC CODE. OBTAIN PERMIT.
#35274571J
Mar 12, 2018
WRITTEN OFF
$0
Jan 17, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. I OBSERVED IN SEVERAL APARTMENTS IN BUILDING GAS FLEX CONNECTOR FOR STOVE INSTALLED FROM BACK OF STOVE THROUGH CABINET OR BEHIND CABINET WHICH IS PROHIBITE
#35268528N
Apr 30, 2018
WRITTEN OFF
$0
Mar 23, 2016Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVATION HASBEEN MADE IN APT 2R GAS FLEX UNDER KITCHEN SINK RUNS THROUGH THE CABINET TO GAS COOKING STOVE. PHOTOS TAKEN. REM: REPAIR AND OR REPLACE.
#35141744J
Aug 18, 2016
IN VIOLATION
$0
Mar 23, 2016Unknown CLASS - 2
ELECTRICAL WORK W/O PERMIT. OBSERVED AT 2PM 1 NEW BOILER INSTALLED IN BASEMENT ALSO NEW 813 FEEDERS IN PANELS 3R & 4L. NO APPLICATION ON FILE FOR NEW BOILER & FEEDERS. REMEDY: OBTAIN PERMIT.
#35159017Z
Aug 22, 2016
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Jul 9, 2025CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED ON ALL FLOORS IN EACH APARTMENT SECTIONS OF FINISHED WALL REMOVED BY FDNY OPERATIONS WITH SMOKE FROM ADJACENT PROPERTY 222 FRANKLIN ST. SEEPING IN.
#25-01557
DOB VIOLATION - ACTIVE
Oct 4, 2023FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#01650
DOB VIOLATION - ACTIVE
Feb 5, 2020FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00623
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#07906
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 4, 2023AEUHAZ FTC-AEU-HAZ
Active
Feb 5, 2020AEUHAZ FTC-AEU-HAZ
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
HPD (79) · C 7 · B 45 · A 27
IssuedClassViolationCorrect by
Oct 23, 2026BApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM THE BUILDING ENTRANCE DOOR THE SOUTH WALL. IN THE FOYER LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 27, 2026
Oct 21, 2026AApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT SOUTH WALL IN THE FOYER LOCATED AT APT 2L, 2nd STORYJan 24, 2027
Oct 14, 2026B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT MAIL BOX AT APT.2L AT PUBLIC HALL, 1st STORYNov 18, 2026
Oct 14, 2026BApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTNov 18, 2026
Oct 2, 2026BApt 2R · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2026
Oct 2, 2026BApt 2R · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2026
Sep 1, 2026BApt 2L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 6, 2026
Sep 1, 2026BApt 2L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 6, 2026
Sep 1, 2026BApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING FRONT TO SOUTH WALL IN THE FOYER LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 6, 2026
Aug 19, 2026B§ 27-2005 ADM CODE PROVIDE APPROVED METAL SCREEN BELOW SKYLIGHT AT BULKHEAD AT PUBLIC HALLSep 23, 2026
Aug 19, 2026BApt 2R · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHSep 23, 2026
Aug 19, 2026BApt 2R · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHSep 23, 2026
Aug 19, 2026CApt 2R · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APASep 14, 2026
Jul 31, 2026A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 1st STORYNov 3, 2026
Jul 31, 2026BApt 2L · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOUSEHOLD ITEMS BLOCKING EGRESS DOOR IN THE 5th ROOM FROM EAST LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHSep 4, 2026
Jul 31, 2026A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 4th STORYNov 3, 2026
Jul 31, 2026B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF LADDER AT PUBLIC HALL, 4th STORYSep 4, 2026
Jul 31, 2026BApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO PANEL AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHSep 4, 2026
Jul 31, 2026AApt 2L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 3, 2026
Jul 31, 2026B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL AT PUBLIC HALL, 1st STORYSep 4, 2026
Jul 31, 2026AApt 2L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 3, 2026
Jul 31, 2026A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 2nd STORYNov 3, 2026
Jul 31, 2026A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 3rd STORYNov 3, 2026
Jul 31, 2026A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE STAIRS AT PUBLIC HALL STAIRSNov 3, 2026
Jul 31, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT BUILDING ENTRANCE , 1st STORYSep 4, 2026
Jul 22, 2026A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF METAL AND WOOD DECK CREATED FOR RECREATIONAL PURPOSE AT ROOFOct 25, 2026
Jul 22, 2026B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL AND HOUSEHOLD ITEM AT PUBLIC HALL, 1st STORYAug 26, 2026
Jul 22, 2026B§ 27-2005 ADM CODE PROVIDE METAL SCREEN MESH UNDER SKYLIGHTAug 26, 2026
Jul 21, 2026CApt 2L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHAug 16, 2026
Jul 21, 2026AApt 2L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 24, 2026
Jul 21, 2026AApt 2L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 24, 2026
Jul 21, 2026CApt 2L · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOUSEHOLD ITEMS BLOCKING EGREES DOOR IN THE 5th ROOM FROM EAST LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJul 27, 2026
Jul 21, 2026BApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO SOUTH WALL BOX IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHAug 25, 2026
Jul 20, 2026AApt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AT NORTH AND WEST WALLS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOct 23, 2026
Jul 20, 2026AApt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2R, 2nd STORYOct 23, 2026
Jul 20, 2026AApt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST AND SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2R, 2nd STORYOct 23, 2026
Jul 20, 2026AApt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOct 23, 2026
Jul 20, 2026BApt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 4th ROOM FROM EAST LOCATED AT APT 2R, 2nd STORYAug 24, 2026
Jul 20, 2026BApt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2R, 2nd STORYAug 24, 2026
Jul 20, 2026BApt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM FROM BUILDING ENTRANCE TO NORTH WALL IN THE KITCHEN LOCATED AT APT 2R, 2nd STORYAug 24, 2026
Jul 20, 2026BApt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 2R, 2nd STORYAug 24, 2026
Jul 20, 2026CApt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT 2ND FROM SOUTH AT WEST IN THE 4th ROOM FROM EAST LOCATED AT APT 2R, 2nd STORYJul 26, 2026
Jul 8, 2026AApt 2L · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 11, 2026
Jul 8, 2026BApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL/BUZZER/INTERCOM AT SOUTH WALL IN THE ENTRANCE LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHAug 12, 2026
May 28, 2026BApt 2R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ.FT AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJul 2, 2026
Jan 30, 2026BApt 2L · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 18269147 ISSUED 30-SEP-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-20Mar 6, 2026
Jan 29, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR. AT BOILER ROOMFeb 4, 2026
Jan 23, 2026AApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERTCOM / BUZZER SYSTEM AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, APARTMENT AT NORTHApr 28, 2026
Nov 10, 2025AApt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 13, 2026
Nov 10, 2025AApt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 13, 2026
Nov 10, 2025AApt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 13, 2026
Nov 10, 2025AApt 2R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS THOUGHTOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 13, 2026
Oct 2, 2025BApt 2L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM BUILDING ENTRANCE DOOR TO THE APARTMENT WALL PANEL AT SOUTH IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 6, 2025
Sep 29, 2025AApt 2L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJan 2, 2026
Sep 15, 2025CApt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOct 11, 2025
Aug 29, 2025AApt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS THOUGHTOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 2, 2025
Jul 17, 2025AApt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT BUILDING FRONT TO PANEL AT EAST WALL IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 20, 2025
Jun 10, 2025BApt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASHES AT EAST WALL PAINTED SHUT IN THE 2nd ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJul 15, 2025
Jun 10, 2025AApt 2R · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE GROUT AND MORTOR JOINTS AT WEST AND NORTH WALLS IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHSep 13, 2025
Jun 10, 2025BApt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPPER AND LOWER WINDOW SASHES AT WEST PAINTED SHUT IN THE 2nd ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJul 15, 2025

Showing 60 of 79. Full list on the agency site.

Issued in the last 120 days

DateSourceWhatNow
Oct 23, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM THE BUILDING ENTRANCE DOOR THE SOUTH WALL. IN THE FOYER LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Oct 21, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT SOUTH WALL IN THE FOYER LOCATED AT APT 2L, 2nd STORYOpen
Oct 14, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT MAIL BOX AT APT.2L AT PUBLIC HALL, 1st STORYOpen
Oct 14, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 2, 2026HPD B§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOpen
Oct 2, 2026HPD B§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOpen
Sep 1, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Sep 1, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Sep 1, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING FRONT TO SOUTH WALL IN THE FOYER LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Aug 19, 2026HPD B§ 27-2005 ADM CODE PROVIDE APPROVED METAL SCREEN BELOW SKYLIGHT AT BULKHEAD AT PUBLIC HALLOpen
Aug 19, 2026HPD B§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOpen
Aug 19, 2026HPD B§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOpen
Aug 19, 2026HPD C§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APAOpen
Jul 31, 2026HPD A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 1st STORYOpen
Jul 31, 2026HPD B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOUSEHOLD ITEMS BLOCKING EGRESS DOOR IN THE 5th ROOM FROM EAST LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Jul 31, 2026HPD A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 4th STORYOpen
Jul 31, 2026HPD B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF LADDER AT PUBLIC HALL, 4th STORYOpen
Jul 31, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO PANEL AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Jul 31, 2026HPD A§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Jul 31, 2026HPD B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL AT PUBLIC HALL, 1st STORYOpen
Jul 31, 2026HPD A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Jul 31, 2026HPD A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 2nd STORYOpen
Jul 31, 2026HPD A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 3rd STORYOpen
Jul 31, 2026HPD A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE STAIRS AT PUBLIC HALL STAIRSOpen
Jul 31, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT BUILDING ENTRANCE , 1st STORYOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 5:31 PM ET. BBL 3025220006.

Look up another building