4 floors · 22,460 sq ft · built 1926 · class G1 · owner of record: Astor Nine Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 11, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01141,DATED 4/19/2023.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'SREPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 10/11/2023,A #37025670K | Mar 7, 2024 ADMIT/IN-VIO | $0 |
| Apr 19, 2023 | Construction CLASS - 1 THE OCCUPIED PARKING STRUCTURE WITH CONC FRAMING OBSERVED TO BE IN THE STATE OF DISREPAIR. CRACKS, CONC SPALLING & EXPOSED STEEL REINF. OBSERVED ON COLUMNS/BEAMS/SLABS @ VARIOUS LVLS/LOCATIONS. CRUSHED COLUMN B #39084507N | Sep 23, 2024 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | CONSTRUCTION FTM.PRKNG GARAGE IN STATE OF DISREPAIR W/CORRODED STEELFRAMING,MISSNG& DTACHED CONCRETE ENCASEMENT OF STEEL FRMING,SPALLNGSLABSACTIVE PLUMBNG LEAKS,&CRCKS ON BRCK MASNRY WALLS,ALL IN MULT LOCTNS.1.VACATE ENTIRE PRKNG GARAGE&REMVE ALL VEHCLES IMMED,2.NYSPE STRCTRL ENGNEER TO IMMED EVAL ENT BLDG&DSGN #FEU10302BS | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | CONSTRUCTION FTM.PRKNG GARAGE STRCTRE IN STATE OF DISREPAIR W/CORRODEDSTEEL FRAMING MISSING&DTACHED CONCRETE ENCSEMENT IF STEEL FRAMNG,SPALLNG SLABS,ACTVE PLUMBNG LINES,&CORRODED BRCK MASONRY IN MULT LOCTNS.1.FULLY VACATE PRKNG GARAGE&RMVE ALL VEHICLES IMMED,2.NYSPE STRUCTRL ENGNEER TO IMMED EVAL ENT BLDG&DSGN R #FEU10301BS | DOB VIOLATION - ACTIVE |
| Apr 19, 2023 | CONSTRUCTION THE OCCUPIED PARKING STRUCTURE WITH CONC FRAMING OBSERVED TO BE IN THE STATE OF DISREPAIR. CRACKS, CONC SPALLING & EXPOSED STEEL REINF. OBSERVED ON COLUMNS/BEAMS/SLABS @ VARIOUS LVLS/LOCATIONS. CRUSHED COLUMN BASE OBSERVED AT SEVERAL LOCATIONS IN CELLAR LVL. VERT CRACKS OBSERVED INSIDE ELEVATOR SHAF #23-01141 | DOB VIOLATION - ACTIVE |
| Jul 22, 2021 | ELEVATOR #9027/706224 | DOB VIOLATION - ACTIVE |
| Feb 17, 2000 | ELEVATOR 1F1632 CEASE USE #9013/118479 | DOB VIOLATION - ACTIVE |
| Feb 17, 2000 | ELEVATOR 1F1632 #9444/118479 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 5:50 AM ET. BBL 1004640020.