20 floors · 161 apartments · 124,060 sq ft · built 1970 · class D4 · owner of record: 220 East 57 Owners
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 124,060 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $258,400 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 461 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1330). Agency page | Dec 31, 2030 in 1505 days | Next due 2030 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01482 | DOB VIOLATION - ACTIVE |
| Dec 2, 2021 | CONSTRUCTION PREMISES RENDERED NON COMPLAINT SIDEWALK SHED , MOVING TWO I BEAMS UNDER DECKING , WITH TWO COLUMNS RAISED ABOVE SIDEWALK APPROXIMATELY 6 'X12"S #CER01DM | DOB VIOLATION - ACTIVE |
| Feb 26, 2021 | CONSTRUCTION #E0601ML | DOB VIOLATION - ACTIVE |
| Feb 19, 2019 | FACADE SAFETY PROGRAM #HAZ89004 | DOB VIOLATION - ACTIVE |
| Feb 28, 2012 | LL11/98-LOCAL LAW 11/98 - FACADE #NRF46975 | DOB VIOLATION - ACTIVE |
| Sep 17, 1990 | CONSTRUCTION #B2LE01 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 19, 2019 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 24, 2026 | B | Apt 3H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH | Sep 28, 2026 |
| Aug 24, 2026 | B | Apt 3H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT WEST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH | Sep 28, 2026 |
| Jun 8, 2026 | B | Apt 3H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE MECHANICAL VENTILATION SYSTEM AT WEST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM WEST AT NORTH | Jul 13, 2026 |
| Jun 20, 2025 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Sep 23, 2025 |
| Jul 19, 2012 | B | Apt 18E · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE HEAT AND A/C CONVECTOR UNIT IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 18E, 17th STORY, 3rd APARTMENT FROM WEST AT NORTH | Aug 23, 2012 |
| May 13, 2009 | A | Apt 18E · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 18E, 16th STORY, 3rd APARTMENT FROM WEST AT NORTH | Aug 16, 2009 |
| Jul 7, 1998 | B | SECTION 67 M/D LAW POST A PRINTED SCALE FLOOR PLAN SHOWING MEANS OF EGRESS, AT MISSING 1 STY PUBLIC HALL | Aug 24, 1998 |
| Oct 15, 1996 | B | Apt 18E · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF MOISTURE PENETRATING CEILING 18 STY NORTHEAST APT 18E 2 ROOM FROM EAST. , SECTION '' '' | Dec 2, 1996 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 24, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH | Open |
| Aug 24, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT WEST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 10:55 PM ET. BBL 1013300038.