Brooklyn · Block 2497 · Lot 23 · 11222

220 Dupont Street

2 floors · 29,365 sq ft · built 1931 · class J6 · owner of record: Mba Brooklyn Llc

10open violations
$16,280ECB/OATH penalties owed
0HPD class C (immediately hazardous)
165dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 29,365 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 775 days
Next cycle year 2028

Open violations

ECB / OATH (5) · $16,280 owed
IssuedViolationHearingBalance
Sep 3, 2026Construction CLASS - 2
GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039556396M-ISSUED 7.09.2026...
#39558715J
Nov 18, 2026
PENDING
$1,250
Jul 9, 2026Unknown CLASS - 2
SITE SAFETY PLAN--BC3301.13.1-AT THE TIME OF MY INSPECTION OF ACTIVE JOB SITE UPON REQUEST PERSON IN CHARGE/WORKERS -FOR SITE SAFETY PLAN NONE WAS PROVIDED/AVAILABLE ON SITE AT THE TIME OF MY INSPECTION-STOP AL
#39556394Z
Nov 18, 2026
PENDING
$2,500
Jul 9, 2026Construction CLASS - 1
//AT THE TIME OF MY INSPECTION I OBSERVED EXCAVATION APPROX. 10-12 FEET DEEP WITH NO GUARDRAIL SYSTEM PROVIDED AS REQUIRED BY CODE(BC3304.4.4)-STOP ALL WORK 10 FEET FROM LEADING EDGE OF EXCAVATION -ALL EXPOSURE
#39556395K
Nov 18, 2026
PENDING
$5,000
Jul 9, 2026Construction CLASS - 1
AT THE TIME OF MY INSPECTION I OBSERVED EXCAVATION WORK APPROX. 10-12 FEET DEEP FOR STORAGE TANK PIT-UPON RESEARCH OF DOB RECORDS(BIS, DOB NOW, CRM)-NO EARTHWORK NOTIFICATION PROVIDED PRIOR TO START OF WORK AS
#39556396M
Nov 18, 2026
PENDING
$2,500
Jul 9, 2026Unknown CLASS - 2
AT THE TIME OF MY INSPECTION OF ACTIVE SITE UPON ASKING FOR COMPETENT PERSON-NOBODY ON SITE WITH VALID 62 HOURS SST CARD(WORKER EZEQUIEL JORGE CHAN- STATING HE'S CP -DID NOT POSES VALID 62H SST CARD-CARD SHOWN
#39556387K
Aug 3, 2027
DEFAULT
$5,030
DOB (2)
IssuedViolationStatus
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#21482
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#21483
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Sep 23, 2026Parking Structures FTF-PS-INITL
Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Open
Sep 3, 2026ECBConstruction: GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039556396M-ISSUED 7.09.2026...Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 4:24 PM ET. BBL 3024970023.

Look up another building