Manhattan · Block 407 · Lot 6 · 10009

220 Avenue A

5 floors · 16 apartments · 14,976 sq ft · built 1900 · class C4 · owner of record: 220 Ave A Partners, A Limited Liability Company

8open violations
$6,554ECB/OATH penalties owed
5HPD class C (immediately hazardous)
63dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 794 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $6,554 owed
IssuedViolationHearingBalance
Jan 28, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35344588R ISSUED ON 10-29-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR ILLEGAL OCCUPANCY. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE
#35390723H
May 2, 2019
IN VIOLATION
$1,250
Dec 5, 2018Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35344588R ISSUED 10/29/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REM: COMPLY WITH COMMISSI
#35396120X
Jan 31, 2019
IN VIOLATION
$1,737
Oct 29, 2018Construction CLASS - 2
WORK WITHOUT A PERMIT.NOTED: OBSERVED @ TIME OF INSPECTION IN THE CELLAR LEVEL UNDER APT# 1D OF THE EASTWING BUILDING CONSTRUCTED FULL HEIGHT PARTITION WITH DOOR FOR CREATING 2 BEDROOMS & ONE 2-PIECES BATHROOM
#35344589Z
Apr 18, 2019
IN VIOLATION
$93
Oct 29, 2018Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPARTMENT RECORDS.NOTED:OBSERVED @ TIME OF INSPECTION APT#1D @ THE 1ST FL OF THE EAST WING BUILDING CONVERTED TO DUPLEX APT ON CO
#35344588R
Jan 31, 2019
IN VIOLATION
$3,474
DOB (1)
IssuedViolationStatus
Oct 29, 2018CONSTRUCTION

#VAC123/2018
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (7) · C 5 · B 1 · A 1
IssuedClassViolationCorrect by
May 7, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 10, 2026
Feb 10, 2026CApt 1A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 10, 2026
Feb 10, 2026CApt 1A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 1A UPPER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 24, 2026
May 15, 2025CApt 1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTHJun 10, 2025
Jul 30, 2024CApt 1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTHAug 25, 2024
Jun 28, 2024CApt 1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''Jul 24, 2024
Oct 18, 2018BApt 1D · § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING PURPOSES CONSISTING OF RECREATION ROOMS USED FOR SLEEPING PURPOSES WITH NO NATURAL LIGHT OR VENTILATION AT CELLAR LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST ''Nov 22, 2018

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 10:52 AM ET. BBL 1004070006.

Look up another building