4 floors · 6,346 sq ft · built 1894 · class W3 · owner of record: 22 West Associates, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 49 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1145 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-23 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 19, 2008 | A | D26-31.09 ADM CODE PROVIDE AT LEAST ONE WATER CLOSET ON THE SAME FLOOR FOR THE ROOMS USED FOR CLASS B OCCUPANCY. WORK MUST BE COMPLETED UNDER PERMIT AT 2ND STY. | Sep 22, 2008 |
| Jun 19, 2008 | A | D26-31.09 ADM CODE PROVIDE UNDER COMPLETED PERMIT SANITARY FACILITIES FOR EACH 6 PERSONS OR REMAINDER THEREOF FOR CLASS B ROOMS BY INSTALLING AN ADDITIONAL BATHTUB & OR SHOWER. | Sep 22, 2008 |
| Jun 19, 2008 | A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CLGS 3 & 4 STYS PUB HALL BATHROOMS. | Sep 22, 2008 |
| Jun 19, 2008 | A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CLGS PUB HALL ALL STYS. | Sep 22, 2008 |
| Jun 19, 2008 | B | D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEILING AT EAST BOILER ROOM CELLAR. | Jul 24, 2008 |
| Jun 19, 2008 | B | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 3 STY PUB HALL BATHROOM. | Jul 24, 2008 |
| Jun 19, 2008 | B | Apt 1 · D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE BASEMENT STY FRONT APT 1. , SECTION '' '' | Jul 24, 2008 |
| Jun 19, 2008 | A | Apt 1 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING OVER BATHTUB BASEMENT STY FRONT APT 1 BATHROOM. , SECTION '' '' | Sep 22, 2008 |
| Jun 19, 2008 | B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS 5 STY PUBLIC HALL. | Jul 24, 2008 |
| May 13, 2002 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR 3 STY PUBLIC HALL BATHROOM. | Jun 22, 2002 |
| May 13, 2002 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE WEST WALL 3 STY PUBLIC HALL BATHROOM. | Jun 22, 2002 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 12, 2026, 3:39 AM ET. BBL 1012020041.