5 floors · 7 apartments · 11,078 sq ft · built 2025 · class D3 · owner of record: 22 Frost St Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 20, 2024 | Unknown CLASS - 2 BC 3307.4.7 OBSERVED INADEQUATE WORK AND STORAGE ZONE. MISSING 4FT SOLID BARRIER WITH MESH ON TOP ALONGSIDE THE PEDESTRIAN PROTECTION. TO PREVENT THE PEDESTRIAN FROM GETTING ACCESS TO WORK AND STORAGE ZONE.STOP #39535291N | Jan 21, 2027 DEFAULT | $5,000 |
| Dec 20, 2024 | Unknown CLASS - 1 BC 3309.1 NB OPERATION IN STRUCTURAL PHASE , AT 2 LEVEL . OBSERVED AT EXP#2 #3 BUILDING HEIGHT IS ABOVE THE ADJACENT BUILDINGS REAR YARD WITH NO OHP / CAZ IN PLACE . STOP ALL WORK 10 FT BACK FROM LEADING EDG #39535290L | Jan 21, 2027 DEFAULT | $12,500 |
| Dec 20, 2024 | Construction CLASS - 2 OBSERVED PLYWOOD INSTALLED AT SECOND FLOOR DECK AT EXP# 2 AND 3 AS OVER HEAD PROTECTION FOR ADJACENT PROPERTY WITH NO DESIGN DRAWINGS. STOP ALL WORK 10 FT BACK AT EXP#2 AND 3 PROVIDE DESIGN DRAWINGS. PROVIDED #39535289Y | Jan 21, 2027 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #18841 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 2:01 PM ET. BBL 3027360014.