5 floors · 51,500 sq ft · built 1905 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 51,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 409 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1752). Agency page | Dec 31, 2032 in 2236 days | Next due 2032 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 23, 2026 | Construction CLASS - 2 REISSUED ECB#35725231N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED MISSING MECH GLASS PANELS AT STAIR DIVIDER BETWEEN STAIRWAY A AND B THROUGHOUT VARIOUS FLOORS.REM:REPAIR AND/OR REPLACE. #35734947N | Aug 20, 2026 POP/IN-VIO | $0 |
| Sep 8, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT EVERY/ALL FLOORS OF STAIRWAYS OF A AND B MISSING MESH GLASS PANELS THROUGHOUT VARIOUS AREAS. REMEDY: REPAIR AND/OR REPLACE. #35725231N | Oct 3, 2025 POP/IN-VIO | $0 |
| Sep 8, 2025 | Construction CLASS - 2 REISSUE ECB #35682906P. EXIT DOOR NOT SELF-CLOSING. NOTED: AT(2ND FL) STAIR A(1ST FL) EXIT 3, 4, 9 DOORS ARE IN DISREPAIR/NOT CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOORS. #35725230L | Oct 3, 2025 POP/IN-VIO | $0 |
| Aug 15, 2024 | Construction CLASS - 2 REISSUE#35674923R EXIT DOOR NOT SELF-CLOSING.EXIT 4 DOOR FENCE RUSTED DOES NOT CLOSE,AND EXIT 3 AND 9 DON'T CLOSE.REM:REPAIR AND REPLACE DOOR. #35682906P | Oct 24, 2024 POP/IN-VIO | $0 |
| Jul 11, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT STAIRWELL A BETWEEN 2ND AND 4TH FLOORS, AND STAIR B BETWEEN 1ST AND 2ND FLOORS, BOTH HAVE MISSING GLASS PANELS IN VARIOUS AREAS. REMEDY: REPAIR A #35674924Z | Sep 27, 2023 POP/IN-VIO | $0 |
| Jul 11, 2023 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: THE EXTERIOR DOORS AT EXIT 3,4, AND 9 ARE NOT WORKING PROPERLY. REMEDY: REPAIR/REPLACE DOOR #35674923R | Sep 27, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #39913 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #02396 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 23, 2026 | ECB | Construction: REISSUED ECB#35725231N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED MISSING MECH GLASS PANELS AT STAIR DIVIDER BETWEEN STAIRWAY A AND B THROUGHOUT VARIOUS FLOORS.REM:REPAIR AND/OR REPLACE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 4:15 AM ET. BBL 1017520059.