12 floors · 49 apartments · 51,933 sq ft · built 2018 · class D1 · owner of record: Grand Apts Housing Development Fund Corp Oration
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-01-23 (Accepted). Agency page | Dec 31, 2026 in 64 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 51,933 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 847 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3181). Agency page | Dec 31, 2031 in 1890 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 21, 2026 | Boilers CLASS - 2 FOUND RBI GAS BOILER MODEL# CB-1500 REQUIRES SERVICING, ALSO FOUND COMBUSTION AIR FAN NOT OPERABLE. DRAFT UNIT ON ROOF ALSO NOT OPERABLE, REPAIR OR REPLACE UNIT. #39204809M | Dec 4, 2026 PENDING | $1,250 |
| May 12, 2026 | Elevators CLASS - 2 MISALINGED BASEMENT HOISTWAY DOOR ACCESS HOLE (8..7.2.11.4). REPLACE WORN GIBS WHERE NEEDED (2.11.11.5.7). INOPERATIVE CAR PHONE (2.27.1.1.3.) #39188186H | May 3, 2027 | $625 |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2024 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2400796 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2024 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 14, 2026 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL | Oct 10, 2026 |
| Sep 14, 2026 | B | Apt 102 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH AND WEST WALLS IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 19, 2026 |
| Sep 14, 2026 | B | Apt 102 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 19, 2026 |
| Sep 14, 2026 | B | Apt 102 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 19, 2026 |
| Sep 14, 2026 | C | Apt 102 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 20, 2026 |
| Aug 13, 2026 | C | Apt 002 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LIFTING CONCRETE SLAB CREATING TRIP HAZARD AT REAR YARD TO UNIT LOCATED AT CELLAR APT 002, 1st CELLAR APT FROM SOUTH AT WEST | Aug 19, 2026 |
| Aug 12, 2026 | C | Apt 102 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER EXCEEDING 130 DEGREES F AT ALL WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 18, 2026 |
| Aug 12, 2026 | B | Apt 102 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 16, 2026 |
| Aug 12, 2026 | B | Apt 102 · § 27-2005 HMC: REFIT CABINETS DOORS AT EAST WALL IN THE KITCHEN LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 16, 2026 |
| Aug 12, 2026 | B | Apt 102 · § 27-2005 HMC: REFIT CLOSET DOOR AT SOUTH WALL IN THE FOYER LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 16, 2026 |
| Mar 5, 2026 | C | Apt 1203 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1203, 12th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 11, 2026 |
| Feb 27, 2026 | C | Apt 1203 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1203, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 25, 2026 |
| Feb 2, 2026 | B | Apt 102 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 9, 2026 |
| Jul 8, 2025 | B | Apt 1203 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1203, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 12, 2025 |
| Apr 23, 2025 | C | Apt 1203 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1203, 12th STORY | Apr 29, 2025 |
| Apr 18, 2025 | A | Apt 1203 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE CLOSET IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1203, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 22, 2025 |
| Feb 24, 2025 | B | Apt 1203 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 1203, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 31, 2025 |
| Jan 21, 2025 | B | Apt 1203 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1203, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 25, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 21, 2026 | ECB | Boilers: FOUND RBI GAS BOILER MODEL# CB-1500 REQUIRES SERVICING, ALSO FOUND COMBUSTION AIR FAN NOT OPERABLE. DRAFT UNIT ON ROOF ALSO NOT OPERABLE, REPAIR OR REPLACE UNIT. | Open |
| Sep 14, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL | Open |
| Sep 14, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH AND WEST WALLS IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 14, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 14, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 14, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 14, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LIFTING VINYL FLOOR TILES (IN FRONT OF WEST ELEVATOR) AT CELLAR AT PUBLIC HALL | Closed |
| Sep 14, 2026 | HPD A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Closed |
| Aug 13, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LIFTING CONCRETE SLAB CREATING TRIP HAZARD AT REAR YARD TO UNIT LOCATED AT CELLAR APT 002, 1st CELLAR APT FROM SOUTH AT WEST | Open |
| Aug 12, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER EXCEEDING 130 DEGREES F AT ALL WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 12, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 12, 2026 | HPD B | § 27-2005 HMC: REFIT CABINETS DOORS AT EAST WALL IN THE KITCHEN LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 12, 2026 | HPD B | § 27-2005 HMC: REFIT CLOSET DOOR AT SOUTH WALL IN THE FOYER LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 12, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LIFTED VINYL FLOORING ( IN FRONT OF WEST ELEVATOR ) AT CELLAR AT PUBLIC HALL | Closed |
| Aug 12, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT LAUNDRY ROOM DOOR AT CELLAR AT PUBLIC HALL | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 12:07 PM ET. BBL 2031810034.