5 floors · 11 apartments · 6,319 sq ft · built 1900 · class C7 · owner of record: 219 Ave A Nyc Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 25, 2026 | Unknown CLASS - 1 ATOI OBSERVED INSTALLATION OF TEMPORARY ELECTRICAL PANEL EQUIPPED WITH MULTIPLE ELECTRICAL OUTLETS TO PROVIDE POWER FOR CONSTRUCTION TOOLS, WITH CONDUIT RUNNING FROM PANEL TO POWER SOURCE. NO ELECTRICAL PERMIT #39201910N | Nov 5, 2026 PENDING | $2,500 |
| Aug 24, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING EXTERIOR. AT TIME OF INSPECTION, OBSERVED AT EXPOSURE 3 DAMAGE TO THE FIRE ESCAPE EXTENDING FROM THE 5TH STORY TO THE ROOF BULKHEAD. A SECTION OF THE FIRE ESCAPE LANDING HAS BEEN RE #39201598H | Oct 29, 2026 PENDING | $2,500 |
| Aug 24, 2026 | Construction CLASS - 1 WORK WITHOUT PERMIT. AT TIME OF INSPECTION, OBSERVED AT ROOF LEVEL THE INSTALLATION OF A TEMPORARY FABRICATED STEEL PLATFORM SERVING AS A FIRE ESCAPE LANDING. NO PERMITS WERE FILED WITH THE DEPARTMENT AT THE TI #39201597X | Oct 29, 2026 PENDING | $2,500 |
| Jul 30, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED AT ROOF OF 5 STORY MIXED USE BUILDING A 10'-0" SECTION OF SHEET-METAL DUCT HAS DETACHED FROM STACK SUPPORT AND COLLAPSED TO ROOF., REPAIR AND/OR REPL #39120279X | Apr 24, 2025 IN VIOLATION | $625 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462487P ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584689Z | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462484J ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584692J | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462494N ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584683H | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35443983K ISSUED 9/9/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35554413K | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462488R ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584688R | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438427N ISSUED 8/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35554418J | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462496R ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584681Y | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION #35406095J ISSUED 04/06/2019.REMEDY:FILE CERTIFICATE OF CORRECT #35580694P | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION #35373796Y ISSUED ON 02/02/2018 PURSUANT TO 28-201.2;28-204.4;R #35580699Y | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438372P ISSUED 8/1/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580681X | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438367K ISSUED 8/1/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580680Y | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION #35373798H ISSUED 02/02/2018 PURSUANT TO 28-201.2;28-204.4;RCNY #35580697K | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462486N ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584690X | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35437919P ISSUED 5/18/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580683J | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462483H ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584693L | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35443980PISSUED 9/9/19 PURSUANT TO28-201.2;2 8-204.4;1RCNY102.01 FILE C/C #35554416X | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438437R ISSUED 4/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580688Z | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION #35374000Y ISSUED ON 02/02/2018.REMEDY:FILE CERTIFICATE OF CORR #35580695R | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462480M ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584696R | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35406093X ISSUED 4/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580691J | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462481Y ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584695P | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462482Y ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584694N | Feb 3, 2022 DEFAULT | $6,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462491H ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35554411R | Jun 16, 2023 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438438Z ISSUED 4/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580687R | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462447L ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584699M | Feb 3, 2022 DEFAULT | $6,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35437917L ISSUED 5/15/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580685N | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462492L ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584685L | Feb 3, 2022 DEFAULT | $6,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438420I ISSUED 8/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35554420Z | Sep 23, 2021 DEFAULT | $6,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35443982Z ISSUED 9/9/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35554414M | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462551K ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584676J | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35455541L ISSUED 1/16/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584675H | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462550Z ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584677L | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35437918N ISSUED 5/15/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580684L | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438428L ISSUED 8/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35554419L | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462498K ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584679P | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35406091M ISSUED 4/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580692L | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION #35373799J ISSUED 02/02/2018.REMEDY:FILE CERTIFICATE OF CORRECT #35580696Z | Feb 3, 2022 DEFAULT | $6,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462485L ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584691H | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438439K ISSUED 4/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580686P | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462490X ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584686N | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35437920M ISSUED 5/18/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580682H | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VOLATION #35406090K ISSUED ON 04/06/2019 PURSUANT TO 28-201.2;28-204.4;RC #35580693N | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462489Z ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584687P | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V38438369Y ISSUED 8/1/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35554421K | Sep 23, 2021 DEFAULT | $6,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462499M ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584678N | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438436P ISSUED 4/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580689K | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462479P ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584697Z | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35438368M ISSUED 8/1/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580679R | Sep 23, 2021 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462497Z ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584680M | Jun 16, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462478N ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584698K | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION.RESPONDENT FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION #35373795M ISSUED 02/02/2018.REMEDY:FILE A CERTIFICATE OF CORR #35554422M | Sep 23, 2021 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462493L ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35584684J | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35443981R ISSUED 9/9/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35554415Y | Jul 18, 2024 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35462476J ISSUED 1/2/20 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35554412Z | Jun 16, 2023 IN VIOLATION | $1,250 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C W/DOB FOR VIOLATING CONDITIONS CITED IN V35406094H ISSUED 4/6/19 PURSUANT TO28-201.2;28-204.4;1RCNY102.01 FILE C/C #35580690H | Feb 3, 2022 DEFAULT | $3,125 |
| Jul 6, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION #35375797Y ISSUED ON 02/02/2018 PURSUANT TO 28-201.2;28-204.4;R #35580698M | Feb 3, 2022 DEFAULT | $3,125 |
Showing 60 of 112. Full list on the agency site.
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.THE REAR SECOND MEANS OF ERGRESS IS COMPROMISED THE ROOF FIRE BASKET & GOOSIE NECK MISSING.IMMED RESTORE/REPAIR FIRE ESCAPE@REAR,EVAL ALL FIRE ESCAPES&CONNECTNS TO THE BLDG&RPAIR.ALL WRK TO BE PERFRMD UNDR DRCT&CONT SUPERVISION OF PE #FEU10301XC | DOB VIOLATION - ACTIVE |
| Aug 24, 2026 | CONSTRUCTION REQUESTING A STRUCTURAL STABILITY REPORT DUE TO DAMAGE TO THE FIRE ESCAPE AT EXPOSURE 3 EXTENDING FROM THE 5TH STORY TO THE ROOF BULKHEAD. A SECTION OF THE FIRE ESCAPE LANDING HAS BEEN REMOVED DUE TO DAMAGE. ADDITIONALLY, SECTIONS OF THE PARAPET WALL BRICK ASSEMBLY ARE DAMAGED AND IN DISREPAIR. #26-02094 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #44639 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #23655 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #25598 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #44757 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #02904 | DOB VIOLATION - ACTIVE |
| Dec 11, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00046 | DOB VIOLATION - ACTIVE |
| Dec 11, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00048 | DOB VIOLATION - ACTIVE |
| Dec 11, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00047 | DOB VIOLATION - ACTIVE |
| Dec 11, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00045 | DOB VIOLATION - ACTIVE |
| Nov 13, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00018 | DOB VIOLATION - ACTIVE |
| Nov 13, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00017 | DOB VIOLATION - ACTIVE |
| Nov 13, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00019 | DOB VIOLATION - ACTIVE |
| Nov 13, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00020 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00022 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00012 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00021 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00020 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00018 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00017 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00016 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00015 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00014 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00013 | DOB VIOLATION - ACTIVE |
| Apr 17, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00021 | DOB VIOLATION - ACTIVE |
| May 2, 2002 | CONSTRUCTION #ZSTF08YC | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| May 2, 2002 | CONSTRUCTION #STF07YC | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Dec 11, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 11, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 11, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 11, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 13, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 13, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 13, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 13, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 17, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 31, 2024 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| Oct 22, 2026 | C | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 28, 2026 |
| Oct 22, 2026 | C | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 28, 2026 |
| Oct 22, 2026 | C | Apt 5R · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 21, 2026 |
| Oct 22, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR | Oct 28, 2026 |
| Oct 22, 2026 | C | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CONSTRUCTION MATERIALS APPROX 20 CUBIC YARDS YARD | Oct 28, 2026 |
| Oct 16, 2026 | B | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2026 |
| Oct 16, 2026 | B | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2026 |
| Oct 2, 2026 | B | Apt 5R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 6, 2026 |
| Oct 2, 2026 | B | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 6, 2026 |
| Oct 2, 2026 | C | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 8, 2026 |
| Oct 2, 2026 | C | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 8, 2026 |
| Oct 2, 2026 | C | Apt 5R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 8, 2026 |
| Oct 2, 2026 | C | Apt 5R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 8, 2026 |
| Oct 2, 2026 | B | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 6, 2026 |
| Oct 2, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ROOF COVERING THROUGHOUT THE ENTIRE ROOF. | Oct 8, 2026 |
| Sep 30, 2026 | C | Apt 5F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 6, 2026 |
| Sep 30, 2026 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 4, 2026 |
| Sep 24, 2026 | C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AT PUBLIC HALL, 5th STORY | Sep 30, 2026 |
| Sep 24, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 5th STORY | Oct 29, 2026 |
| Sep 24, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 4th STORY | Oct 29, 2026 |
| Sep 22, 2026 | B | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 27, 2026 |
| Sep 22, 2026 | B | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 27, 2026 |
| Sep 22, 2026 | C | Apt 5R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 28, 2026 |
| Sep 22, 2026 | C | Apt 5R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 28, 2026 |
| Aug 20, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 5th STORY | Sep 24, 2026 |
| Aug 20, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 4th STORY | Sep 24, 2026 |
| Aug 4, 2026 | C | Apt 5R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASH AT THE 1ST WINDOW FROM SOUTH AT THE WEST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 10, 2026 |
| Aug 4, 2026 | C | Apt 5R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 10, 2026 |
| Aug 4, 2026 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 30, 2026 |
| Aug 4, 2026 | B | Apt 2R · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 8, 2026 |
| Aug 4, 2026 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 8, 2026 |
| Aug 4, 2026 | B | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN CABINET BASE DOOR IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 8, 2026 |
| Aug 4, 2026 | B | Apt 2R · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 8, 2026 |
| Aug 4, 2026 | B | Apt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 8, 2026 |
| May 18, 2026 | C | Apt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH BALANCE AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | May 24, 2026 |
| Nov 17, 2025 | C | Apt 5R · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 15, 2025 |
| Nov 17, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Nov 23, 2025 |
| Oct 29, 2025 | C | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. PROPERLY SECURE TOP RETURN RAIL AT ROOF OPENING AT FIRE ESCAPE, SECTION ''REAR'' | Nov 4, 2025 |
| Oct 29, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT, 1st STORY | Nov 4, 2025 |
| Oct 29, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EIGHT VENT STACKS AT ROOF | Nov 4, 2025 |
| Jan 7, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE METAL CORNICE AT ROOF | Apr 12, 2025 |
| Jan 7, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CORNICE AT ROOF | Feb 11, 2025 |
| Dec 24, 2024 | C | Apt 5R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER AND LOWER WINDOW SASH IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY | Dec 30, 2024 |
| Nov 21, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF GARBAGE CAN AT PUBLIC HALL, 1st STORY | Dec 26, 2024 |
| Nov 21, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF GARBAGE CANS AT PUBLIC HALL, 2nd STORY | Dec 26, 2024 |
| Nov 6, 2024 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF GARBAGE DISPOSAL BINS STORED AT THE PUBLIC HALL AT PUBLIC HALL, 1st STORY | Dec 11, 2024 |
| Nov 6, 2024 | C | Apt 5R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE IMPROPERLY COUNTER BALANCED UPPER AND LOWER WINDOW SASHES AT THE EGRESS WINDOW IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 12, 2024 |
| Nov 6, 2024 | C | Apt 5R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE IMPROPERLY COUNTER BALANCED UPPER AND LOWER WINDOW SASHES AT THE EGRESS WINDOW IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 12, 2024 |
| Oct 22, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD FURNITURE,CONSTRUCTION MATERIAL AND OTHER PERSONALITEMS STORED AT PUBLIC HALL, 5th STORY | Nov 26, 2024 |
| Sep 3, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 5th STORY | Oct 8, 2024 |
| Sep 3, 2024 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HANDRAIL AT PUBLIC HALL, 2nd STORY | Oct 8, 2024 |
| Aug 19, 2024 | C | Apt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 14, 2024 |
| Aug 19, 2024 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZED BATHTUB SURFACE IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 23, 2024 |
| Aug 19, 2024 | C | Apt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 14, 2024 |
| Aug 6, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT THE REAR YARD | Aug 12, 2024 |
| Aug 6, 2024 | C | Apt 3R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 1, 2024 |
| Aug 6, 2024 | B | Apt 3R · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN PIPE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 10, 2024 |
| Aug 6, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ERODED MORTAR JOINTS FROM THE PARAPET TO THE BASEMENT AT THE REAR EXTERIOR WALL OF THE BUILDING | Aug 12, 2024 |
| Aug 6, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT THE CEILING AT BASEMENT | Aug 12, 2024 |
Showing 60 of 127. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 22, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 22, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 22, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 22, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR | Open |
| Oct 22, 2026 | HPD C | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CONSTRUCTION MATERIALS APPROX 20 CUBIC YARDS YARD | Open |
| Oct 16, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 16, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 2, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 2, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 2, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 2, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 2, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 2, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 2, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 2, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ROOF COVERING THROUGHOUT THE ENTIRE ROOF. | Open |
| Sep 30, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 30, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 24, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AT PUBLIC HALL, 5th STORY | Open |
| Sep 24, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 5th STORY | Open |
| Sep 24, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 4th STORY | Open |
| Sep 22, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 22, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 22, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 22, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 29, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER.THE REAR SECOND MEANS OF ERGRESS IS COMPROMISED THE ROOF FIRE BASKET & GOOSIE NECK MISSING.IMMED RESTORE/REPAIR FIRE ESCAPE@REAR,EVAL ALL FIRE ESCAPES&CONNECTNS TO THE BLDG&RPAIR.ALL WRK TO BE PERFRMD UNDR DRCT&CONT SUPERVISION OF PE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 6:05 AM ET. BBL 1004410032.