7 floors · 218 apartments · 231,422 sq ft · built 2023 · class D6 · owner of record: Toe Front Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 121 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 231,422 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 55). Agency page | Dec 31, 2035 in 3356 days | Next due 2035 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 28, 2022 | CONSTRUCTION DEMOLITION WORK WITHOUT A REQUIRED DEMO PERMIT #E02MA03 | VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 19, 2026 | B | Apt 603 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 603 LOWER LEVEL, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Nov 23, 2026 |
| Oct 19, 2026 | B | Apt 603 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 603 LOWER LEVEL, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Nov 23, 2026 |
| Oct 19, 2026 | B | Apt 603 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 603 LOWER LEVEL, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Nov 23, 2026 |
| Oct 19, 2026 | B | Apt 603 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 603 LOWER LEVEL, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Nov 23, 2026 |
| May 13, 2026 | B | § 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE HEAVY DUTY LOCK AND LATCH SET AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY, SECTION ''SOUTH'' | Jun 17, 2026 |
| May 13, 2026 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY, SECTION ''SOUTH'' | May 19, 2026 |
| Apr 6, 2026 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT LOBBY, 1st STORY | Apr 12, 2026 |
| Apr 6, 2026 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELCTROMAGNETIC LOCKING DEVICE INSTALLED AT VESTIBULE DOOR AT LOBBY, 1st STORY | Apr 12, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 603 LOWER LEVEL, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Open |
| Oct 19, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 603 LOWER LEVEL, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Open |
| Oct 19, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 603 LOWER LEVEL, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Open |
| Oct 19, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 603 LOWER LEVEL, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 3:33 AM ET. BBL 3000550020.