21 floors · 1 apartments · 150,888 sq ft · built 1912 · class O4 · owner of record: Croisic Fee Owner Ii, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 150,888 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Required only if the owner doesn't live there |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $187,200 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 484 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 828). Agency page | Dec 31, 2028 in 798 days | Next due 2028 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-28 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 24, 2022 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ONSITE-EXPIRED PERMIT.AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBSITE I OBSERVED SUPPORTED SCAFFOLD SYSTEM INSTALLED TO THE ROOF TOP LEVEL AT EXPOS#1,2 AND #4 ONSITE.UPON FURT #35641904K | Aug 18, 2022 IN VIOLATION | $625 |
| Nov 3, 2021 | Construction CLASS - 1 WORK DOESNT CONFORM TO APPROVED CONST DOCS &/OR APPROVED AMENDMENTS ATOI ON ACTIVE JOBSITE,OBSERVED PIPE SCF APRX200' IN HT,ERECTED ON TOP OF SWS@EXP1&2,ABOVE NEEDLE BEAMS@EXP4&ABOVE EXISTING FIRE ESCAPE EXP4.N #35504106P | Jun 9, 2022 IN VIOLATION | $625 |
| Jul 16, 2021 | Construction CLASS - 1 WORK CONTRARY TO DESIGN DRAWINGS ATOI OBSERVED SWS CONST CONTRARY TO DESIGN DRAWINGS.SWS INSTALLED@EXP1 W/INUSE SUPPORTED SCF MISSING CROSS BRACES&MISSING DIAGONAL BRACING.SWS@EXP2-DD SHOWS 1CROSS BRACE PER BAY #35587707R | Sep 30, 2021 DEFAULT | $6,250 |
| Aug 29, 2018 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSONS AND PROEPRTY AFFECTED BY CONSTRUCTIONOPERATION.NOTED:PREMISES 20 STORY COMMERCIAL BUILDING A GYM CONSTRUCTION IN PROGRESS UNDER PERMIT #122665188 AT 1ST FLOOR AND BASEMENT LEVEL #35355136J | Oct 18, 2018 IN VIOLATION | $10,000 |
| Issued | Violation | Status |
|---|---|---|
| Nov 25, 2019 | CONSTRUCTION #CC05PS09 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
None open.