Queens · Block 7338 · Lot 10 · 11361

218-10 Northern Boulevard

2 floors · 20,000 sq ft · built 1985 · class O2 · owner of record: The Solomon Group, Llc

17open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
416dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 416 days
Next cycle year 2027

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
May 20, 2008Elevators Non-Hazardous
10H11.17H11.38L11.39B09.24M07.47Y13.39Z13. 10 REAR CAR DOOR GIBS WORN 38 CAR TOP LIGHT BULB DEFECTIVE 39 REMOVE NON ELEV. RELATED MATERIALFROM MACHINE RM 24 DOWN INDICATOR MISSING PROVIDE 39 WATER MACHINE RM
#38185109Y
Jul 15, 2008
WRITTEN OFF
$0
DOB (7)
IssuedViolationStatus
Aug 23, 2025CONSTRUCTION
FILED CERTIFICATE,FORM, APPLICATION. CONTAINING MATERIAL FALSE STATEMENT. REIVEW FILING FOR DOB JOB#B01025469 REVEALED DRAWINGS SIGNED & SEALED BY P.E. LIC#098295. APPROVED DRAWING SHOWING RETAINING WALL WITH FOOTING BENEATH GROUND. ALSO STABILITY REPORT IN ACCORDANCE WITH DRAWINGS. REMEDY: DEMOLISH
#35409028N
DOB VIOLATION - ACTIVE
Sep 2, 2021ELEVATOR

#9027/707638
DOB VIOLATION - ACTIVE
Sep 9, 2020ELEVATOR

#9027/690156
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#10479
DOB VIOLATION - ACTIVE
Aug 28, 2019ELEVATOR

#9027/659863
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#06044
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#03964
DOB VIOLATION - ACTIVE
DOB NOW Safety (9)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Sep 6, 2019Elevators ACC1
Active
Sep 15, 2017Elevators EVCAT1
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 6:16 AM ET. BBL 4073380010.

Look up another building