4 floors · 45 apartments · 46,000 sq ft · built 1926 · class C7 · owner of record: Shpelrub Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 46,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 409 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-18 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2022 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2201519 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2102863 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #30187 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2022 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 11, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Dec 15, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Oct 16, 2026 |
| Sep 11, 2026 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Oct 16, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSE HOLD ITEMS AT STAIRS TO BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Oct 16, 2026 |
| Sep 11, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Dec 15, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS ON STAIRS TO BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Dec 15, 2026 |
| Sep 11, 2026 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CLOTHING LINE TIED ACROSS 2ND STORY BALCONY AT NORTH BUILDING FRONT AT FIRE ESCAPE | Sep 17, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Oct 16, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Oct 16, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY | Oct 16, 2026 |
| Sep 11, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Dec 15, 2026 |
| Sep 11, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY | Dec 15, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Oct 16, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Oct 16, 2026 |
| Sep 10, 2026 | B | Apt 412 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Oct 15, 2026 |
| Sep 10, 2026 | B | Apt 412 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Oct 15, 2026 |
| Sep 10, 2026 | B | Apt 412 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE FOYER LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Oct 15, 2026 |
| Sep 10, 2026 | B | Apt 412 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Oct 15, 2026 |
| Sep 10, 2026 | B | Apt 412 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECT | Oct 15, 2026 |
| Sep 10, 2026 | A | Apt 412 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Dec 14, 2026 |
| Sep 10, 2026 | B | Apt 412 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SE | Oct 15, 2026 |
| Dec 2, 2025 | B | Apt 214 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 214, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ' | Jan 6, 2026 |
| Dec 2, 2025 | B | Apt 312 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 312, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 6, 2026 |
| Dec 2, 2025 | B | Apt 314 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 314, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ' | Jan 6, 2026 |
| Dec 2, 2025 | B | Apt 410 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 410, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 6, 2026 |
| Dec 2, 2025 | B | Apt 401 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 401, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jan 6, 2026 |
| Dec 2, 2025 | B | Apt 403 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 403, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jan 6, 2026 |
| Dec 2, 2025 | B | Apt 205 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 205, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 6, 2026 |
| Dec 2, 2025 | B | Apt 303 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 303, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jan 6, 2026 |
| Dec 2, 2025 | B | Apt 305 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 305, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 6, 2026 |
| Nov 25, 2025 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Nov 29, 2025 |
| Nov 25, 2025 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Nov 29, 2025 |
| Oct 31, 2023 | C | Apt 303 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 1; IN THE ENTIRE APARTMENT LOCATED AT APT 303, 3rd STORY, 2nd AP | Nov 26, 2023 |
| Oct 31, 2023 | B | Apt 303 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 303, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTH | Dec 5, 2023 |
| Oct 31, 2023 | B | Apt 303 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 303, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTH | Dec 5, 2023 |
| Oct 31, 2023 | C | Apt 303 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 303, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTH | Nov 26, 2023 |
| Oct 31, 2023 | A | Apt 303 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST LOCATED AT APT 303, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTH | Feb 3, 2024 |
| Oct 31, 2023 | B | Apt 303 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 303, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTH | Dec 5, 2023 |
| Oct 31, 2023 | B | Apt 303 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL, CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 303, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTH | Dec 5, 2023 |
| Jul 18, 2023 | B | Apt 402 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 402, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION A | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 204 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 204, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION A | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 301 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 301, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION A | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 303 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 303, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION A | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 403 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 403, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION A | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 214 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 214, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ' | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 210 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 210, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION A | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 205 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 205, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION A | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 102 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION A | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 106 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 106, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ' | Aug 22, 2023 |
| Jul 18, 2023 | B | Apt 410 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 410, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ' | Aug 22, 2023 |
| Jul 6, 2023 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jul 10, 2023 |
| Jul 6, 2023 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jul 10, 2023 |
| Mar 27, 2023 | B | Apt 404 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR COVERING AT WALKING AREA IN THE KITCHEN LOCATED AT APT 404, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | May 1, 2023 |
| Mar 27, 2023 | B | Apt 404 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CRACKED INNER GLASS AT UPPER SASH WINDOW IN THE KITCHEN LOCATED AT APT 404, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | May 1, 2023 |
| Mar 27, 2023 | B | Apt 404 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 404, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | May 1, 2023 |
| Mar 1, 2023 | A | Apt 306 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT THE STEAM RISER IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 306, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Jun 4, 2023 |
Showing 60 of 115. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 11, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Open |
| Sep 11, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSE HOLD ITEMS AT STAIRS TO BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Open |
| Sep 11, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS ON STAIRS TO BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Open |
| Sep 11, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Open |
| Sep 11, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CLOTHING LINE TIED ACROSS 2ND STORY BALCONY AT NORTH BUILDING FRONT AT FIRE ESCAPE | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 4th STORY, SECTION AT NORTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY | Open |
| Sep 11, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Open |
| Sep 11, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE FOYER LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Open |
| Sep 10, 2026 | HPD B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECT | Open |
| Sep 10, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Open |
| Sep 10, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 412, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 7:52 PM ET. BBL 3073540001.