5 floors · 74,074 sq ft · built 1910 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 74,074 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1440). Agency page | Dec 31, 2030 in 1526 days | Next due 2030 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-17 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 22, 2026 | Construction CLASS - 2 REISSUE:35692021R FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.6TH FLOOR GYM FLOOR IS BUCKING AND CREATING A TRIPPING MATERIAL.REM:COMPLY WITH CODE. #35731852R | Jun 15, 2026 POP/IN-VIO | $0 |
| May 22, 2026 | Construction CLASS - 2 REISSUE:35692024M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.6TH FLOOR PARAPET WALL HAS NO PROTECTIVE RAILINGS A EXP#1,#2 AND EXP#4.REM:COMPLY WITH CODE. #35731851P | Jun 15, 2026 POP/IN-VIO | $0 |
| Apr 23, 2025 | Construction CLASS - 2 REISSUE#35674691R FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THE 6 FLOOR GYMNASIUM FLOOR IS BUCKLING AT VARIOUS LOCATION,WHICH IS CREATING A TRIPPING HAVARD.REM:REPAIR AND/OR REPLACE. #35692021R | Jul 2, 2025 POP/IN-VIO | $0 |
| Apr 23, 2025 | Construction CLASS - 2 REISSUE#35677572H FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT ROOF LEVEL TOP OF THE 6 FLOOR THE PARAPET HAS NO PROTECTIVERAILINGS AT EXPOSURE 1 & 2 AND 4.REM:PROVIDE PROTECTION AT PARAPET WAL #35692024M | Jul 2, 2025 POP/IN-VIO | $0 |
| May 13, 2024 | Construction CLASS - 2 REISSUE #35674691R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF MY INSPECTION I OBSERVED AT THE 6TH FLOOR GYMWOOD FLOOR IS BUCKLING AT VARIOUS AREAS CREATING A TRIPPING HAZARD, NEED TO MAK #35677571X | Aug 21, 2024 POP/IN-VIO | $0 |
| May 13, 2024 | Construction CLASS - 2 REISSUE #35674686M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF MY INSPECTION I OBSERVED AT THE 6TH FLOOR ROOF MISSINGPROTECTIVE RAILING APPROXIMATELY 200" IN LENGTH AT EXPOSURE #1 FL AND #35677572H | Aug 21, 2024 POP/IN-VIO | $0 |
| Apr 7, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 6TH FL GYM WOOD FLS BUCKLING AT VARIOUS AREAS CREATING TRIPPING HAZARD.REMEDY:MAKE NECESSARY REPAIRS #35674691R | Jul 5, 2023 POP/IN-VIO | $0 |
| Apr 7, 2023 | Construction CLASS - 2 28-301.1 REISSUE #35636343N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT TOP OF 6TH FL ROOF MISSING PROTECTIVE RAILING APROX 200 LNFT AT EXP #1 #2 #4 CREATING FALL HAZARDS CONDITION.REMEDY:PRO #35674686M | Jul 5, 2023 POP/IN-VIO | $0 |
| Apr 21, 2022 | Construction CLASS - 2 28-301.1 REISSUE35560846R NOTED:@ROOF LEVEL:THERE ARE 3AREAS OF ROOF THAT DONT HAVE GUARDRAILS CREATING HAZARDOUS CONDITION.REPAIR &OR REPLACE #35636343N | Sep 21, 2022 POP/IN-VIO | $0 |
| Apr 28, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER NOTED:@ROOFTOP PARAPET WALL W/MISSING/OPEN SECS NO GUARDRAILS/UNGUARDED.REPAIR &/OR REPLACE. #35560846R | Sep 29, 2021 POP/IN-VIO | $0 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 10:20 AM ET. BBL 3014400056.