12 floors · 109,490 sq ft · built 1912 · class RI · owner of record: Aradco Ltd
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $64,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 99 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 109,490 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 775). Agency page | Dec 31, 2035 in 3334 days | Next due 2035 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-05 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 19, 2019 | Construction CLASS - 2 REMOVAEL OF SAFETY MEASURES .SIDEWLAK SHED AND OTHER SAFETY MEASURES IWTHOUT DEPARTMENT APPROVAL NOTE:AT THE TIM EOF INSPECTION THE AMENDED TECHNICAL REPORT FILED BY TEH PE/RA ON 12-17-2019 HAS NOT BEEN ACCEPTE #35365890K | Feb 27, 2020 IN VIOLATION | $1,250 |
| Jan 11, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35372684P ISSUED ON 11/28/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. NO C OF C ON FILE. REMEDY #35393433N | Jun 27, 2019 IN VIOLATION | $1,250 |
| Nov 28, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.NOTED:PARTY WALL AT RIGHT SIDE EXTERIOR WALL IS IN A DISREPAIR CONDITION WITH LOOSE BRICKS MISSNG MORTAR FROM JOINTS WITH MORTAR AND BRICKS PIECES FELL ON TER #35372684P | Jun 27, 2019 IN VIOLATION | $6,250 |
| Sep 6, 2018 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35344003M ISSUED 07/31/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FAILURE TO COMPLY WITH TH #35388275K | Oct 25, 2018 DEFAULT | $3,125 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
None open.