Brooklyn · Block 5120 · Lot 51 · 11226

217 East 16 Street

4 floors · 16 apartments · 16,400 sq ft · built 1915 · class C1 · owner of record: 217 E 16 St Llc

31open violations
$0ECB/OATH penalties owed
8HPD class C (immediately hazardous)
45dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 45 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 45 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 61 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 289 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 410 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-08 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (5)
IssuedViolationStatus
Mar 16, 1999LOCAL LAW 62/91 - BOILERS

#21538
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#36316
DOB VIOLATION - ACTIVE
Jun 1, 1994LOCAL LAW 62/91 - BOILERS

#24425
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#35938
DOB VIOLATION - ACTIVE
Jun 1, 1993LOCAL LAW 62/91 - BOILERS

#24424
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Mar 16, 1999Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Jun 1, 1994Boiler LL6291
Active
Jun 1, 1993Boiler LL6291
Active
HPD (22) · C 8 · B 9 · A 5
IssuedClassViolationCorrect by
Apr 30, 2024CApt D · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AJun 7, 2024
Apr 29, 2024AApt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTAug 2, 2024
Mar 8, 2024C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT UPPER WINDOW SASH (1ST FROM EAST AT SOUTH) AT PUBLIC HALL, 1st STORYMar 14, 2024
Mar 4, 2024CApt D · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE STAIRS LEADING TO FIRE PASSAGE WAY AT EAST LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTMar 10, 2024
Feb 29, 2024CApt I · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET . IN THE BATHROOM LOCATED AT APT I, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHMar 6, 2024
Feb 5, 2024BApt C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM NORTH AT EASTMar 11, 2024
Feb 5, 2024BApt H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT H, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 11, 2024
Feb 5, 2024BApt M · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT M, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTMar 11, 2024
Feb 5, 2024BApt I · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT I, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 11, 2024
Feb 5, 2024BApt J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT J, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTMar 11, 2024
Jan 26, 2024CApt D · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Jan 30, 2024
Jan 26, 2024CApt D · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Jan 30, 2024
Dec 4, 2023AApt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILES AT SUSPENDED CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTMar 8, 2024
Dec 4, 2023AApt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILES AT SUSPENDED CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTMar 8, 2024
Sep 26, 2023AApt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTDec 30, 2023
Sep 26, 2023AApt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTDec 30, 2023
Apr 12, 2021CApt L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH SURFACE AT THE BATHTUB BY METHOD OF REGLAZING IN THE BATHROOM LOCATED AT APT L, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHApr 18, 2021
Apr 12, 2021CApt L · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 4 SQ.FT. AT CEILING, 3 SQ.FT. AT NORTH WALL, 20 SQ.FT. AT SOUTH WALL AND 3 SQ.FT. AT WEST WALL IN THE BATHROOM LOCATED AT APT L, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMay 8, 2021
May 26, 2015BApt K · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT K, 4th STORY, 1st APARTMENT FROM NORTH AT EASTJun 30, 2015
May 26, 2015BApt K · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE 5th ROOM FROM EAST LOCATED AT APT K, 4th STORY, 1st APARTMENT FROM NORTH AT EASTJun 30, 2015
Mar 18, 2015BApt K · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT K, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 22, 2015
Mar 18, 2015BApt K · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT K, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 22, 2015

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 16, 2026, 6:55 AM ET. BBL 3051200051.

Look up another building