4 floors · 16 apartments · 16,400 sq ft · built 1915 · class C1 · owner of record: 217 E 16 St Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 410 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-08 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #21538 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #36316 | DOB VIOLATION - ACTIVE |
| Jun 1, 1994 | LOCAL LAW 62/91 - BOILERS #24425 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #35938 | DOB VIOLATION - ACTIVE |
| Jun 1, 1993 | LOCAL LAW 62/91 - BOILERS #24424 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 16, 1999 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jun 1, 1994 | Boiler LL6291 | Active |
| Jun 1, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 30, 2024 | C | Apt D · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jun 7, 2024 |
| Apr 29, 2024 | A | Apt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 2, 2024 |
| Mar 8, 2024 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT UPPER WINDOW SASH (1ST FROM EAST AT SOUTH) AT PUBLIC HALL, 1st STORY | Mar 14, 2024 |
| Mar 4, 2024 | C | Apt D · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE STAIRS LEADING TO FIRE PASSAGE WAY AT EAST LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Mar 10, 2024 |
| Feb 29, 2024 | C | Apt I · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET . IN THE BATHROOM LOCATED AT APT I, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 6, 2024 |
| Feb 5, 2024 | B | Apt C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 11, 2024 |
| Feb 5, 2024 | B | Apt H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT H, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Mar 11, 2024 |
| Feb 5, 2024 | B | Apt M · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 11, 2024 |
| Feb 5, 2024 | B | Apt I · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT I, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 11, 2024 |
| Feb 5, 2024 | B | Apt J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT J, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 11, 2024 |
| Jan 26, 2024 | C | Apt D · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jan 30, 2024 |
| Jan 26, 2024 | C | Apt D · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jan 30, 2024 |
| Dec 4, 2023 | A | Apt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILES AT SUSPENDED CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Mar 8, 2024 |
| Dec 4, 2023 | A | Apt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILES AT SUSPENDED CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Mar 8, 2024 |
| Sep 26, 2023 | A | Apt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 30, 2023 |
| Sep 26, 2023 | A | Apt D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 30, 2023 |
| Apr 12, 2021 | C | Apt L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH SURFACE AT THE BATHTUB BY METHOD OF REGLAZING IN THE BATHROOM LOCATED AT APT L, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 18, 2021 |
| Apr 12, 2021 | C | Apt L · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 4 SQ.FT. AT CEILING, 3 SQ.FT. AT NORTH WALL, 20 SQ.FT. AT SOUTH WALL AND 3 SQ.FT. AT WEST WALL IN THE BATHROOM LOCATED AT APT L, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | May 8, 2021 |
| May 26, 2015 | B | Apt K · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2015 |
| May 26, 2015 | B | Apt K · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE 5th ROOM FROM EAST LOCATED AT APT K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2015 |
| Mar 18, 2015 | B | Apt K · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 22, 2015 |
| Mar 18, 2015 | B | Apt K · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 22, 2015 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 6:55 AM ET. BBL 3051200051.