2 floors · 3 apartments · 2,472 sq ft · built 1899 · class C0 · owner of record: 217 Arlington Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1154 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 10, 2025 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON SITE-EXPIRED PERMIT: AT THE TIME OF INSPECTION, OBSERVED PROPERTY ENCLOSED WITH CONSTRUCTION FENCE ISSUED UNDER PERMIT #B00200319-I1-FN. PERMIT HAS BEEN EXPIR #39166537N | Jan 21, 2026 IN VIOLATION | $1,250 |
| Nov 10, 2025 | Construction CLASS - 2 JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION: AT THE TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE ENCLOSING SEALED PROPERTY NOT MAINTAINED. PLEXIGLASS MISSING AT ALL 5 VIEWING PANELS, P #39166536L | Jan 21, 2026 IN VIOLATION | $1,000 |
| Sep 18, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED; AT TIME OF INSPECTION BUILDING HAS BEEN OBSERVED WITH PORTIONS OF THE CORNICE BEING COMPLETELY MISSING AT EXPOSURES #1 AND #2 DUE TO DETERIORATION A #39160833K | Sep 10, 2026 IN VIOLATION | $1,250 |
| Mar 22, 2022 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED STRUCTURAL WORK PERFORMED WITH OUT PERMIT. NEW STEEL STREPS INSTALLED FROM BASEMENT TO 2ND FLOOR AND NEW METAL FLOOR JOIST AND CEILING JOIST INSTALLED THAT'S NOT INDICATED ON PLAN #39058592H | Nov 18, 2022 IN VIOLATION | $0 |
| Jan 11, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35434114Y ISSUED ON 06-05-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO OBEY A VACATE O #35515270K | Feb 28, 2022 IN VIOLATION | $1,250 |
| Dec 9, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35333705N ISSUED ON 07/11/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT IN CELLAR ILLEGALLY INSTALLED 3PCS BATHROOM & #35512841L | Oct 29, 2020 DEFAULT | $12,500 |
| Dec 2, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35434114Y ISSUED ON 6/5/19 AND TO FILE A CERTIFICATE OR CORRECTION PURSUANT TO 28-201.1 AND 1 RCNY 102-01.FAILURE TO OBEY A VACATE #35512642Z | Sep 24, 2020 DEFAULT | $5,000 |
| Oct 10, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35434114Y ISSUED ON 06-05-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER PER 28-207 #35429741R | Feb 12, 2020 DEFAULT | $3,125 |
| Jul 16, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35333705N ISSUED ON 07/11/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35401327R | Nov 18, 2019 DEFAULT | $12,500 |
| Jun 5, 2019 | Signs CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER NOTED:FOR VACATE ORDER #B338/18 ISSUED POSTED 7/11/18 AT TIME OF INSPECTION I OBSERVED VACATE POSTIGN REMOVED/NONE I REPOSTED VACATE ORDER.REM:COMPLY WITH CODE #35434115X | Sep 23, 2019 DEFAULT | $25,000 |
| Jun 5, 2019 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER PER 28-207.4 NOTED: FOR VACATE ORDER #B338/18 ISSED 7/11/18 AT TIME OF INSPECTION I OBSERVED PREMISES FULLY RE OCCUPIED WITH APPROX 13 PPL.REM:COMPLY WITH VA #35434114Y | Sep 23, 2019 DEFAULT | $12,000 |
| Apr 26, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35333705N ISSUED ON 07/11/2018 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMIS #35398446P | Aug 5, 2019 DEFAULT | $12,500 |
| Feb 15, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35333705N ISSUED ON 7/11/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. WORK W/O A PERMIT. REMEDY: #35394336X | May 20, 2019 DEFAULT | $6,250 |
| Dec 27, 2018 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35333705N ISSUED ON 07/11/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O PERMIT. NOTE: AT CELLAR LEVEL INSTALLED FULL HEIGHT #35393677J | Apr 1, 2019 DEFAULT | $12,500 |
| Nov 10, 2018 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35389071N ISSUED ON 09/29/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT AT CELLAR LEVEL. REMEDY: COMPLY W/COMM'S ORDE #35390118J | Feb 11, 2019 DEFAULT | $12,500 |
| Sep 29, 2018 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35333705N ISSUED ON 07/11/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT. NOTED: AT CELLAR LEVEL INSTALLED A 3PC BATHR #35389071N | Dec 24, 2018 DEFAULT | $6,250 |
| Aug 19, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35333706P ISSUED ON 07-11-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR ILLEGAL OCCUPANCY IN THE CELLAR. REMEDY: COMPLY W/COMM'S OR #35387613J | Nov 5, 2018 DEFAULT | $3,125 |
| Jul 11, 2018 | Quality of Life CLASS - 1 DWELLING CONVERTED, MAINTAINED OR OCCUPIED WITH 3 OR MORE ADDITIONAL DWELLING UNITS THAN LEGALLY AUTHORIZED REF TO DOB/HPD #184717 INDICATES 2 STORIES/2 DWELLINGS; HOWEVER, OBSERVED IN CELLAR LEVEL ONE MAN & 2 #35333706P | Sep 17, 2018 DEFAULT | $70,000 |
| Jul 11, 2018 | Construction CLASS - 1 WORK WITHOUT A PERMIT. OBSERVED IN CELLAR LEVEL ILLEGALLY INSTALLED 3 PC BATHROOM AND FULL KITCHEN W/ELECTRIC STOVE, FULL HEIGHT PARTITION CREATED BEDROOM AND THAT INCLUDED UNSAFE ELECTRICAL WORKS AND UNAPPROVE #35333705N | Sep 17, 2018 DEFAULT | $8,000 |
| Jul 2, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED:ON THE 2ND FLOOR ROOM #6, THERE HOLES IN THE CEILING APPROXIMATELY 8'IN LENGTH AND 3'IN WIDTH, ALSO ON THE SECOND FLOOR HALLWAY THE WALL IS DAMAGED. #35336382L | Sep 10, 2018 DEFAULT | $6,250 |
| Jul 2, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8 27-371(J) NOTED: OBSERVED ON TWO DOORS ON THE SECOND FLOOR KEY LOCKING DEVICE INSTALLED ON DOORS. #35336383N | Sep 10, 2018 DEFAULT | $3,125 |
| Oct 31, 2017 | Construction CLASS - 3 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: ON 2ND FL ROOM#6 THERE ARE HOLES IN THE CEILING,& WALL. ALSO ON THE 2ND FL HALLWAYTHE WALL IS DAMAGE. ON THE 1ST FL ROOM#4 THERE ARE HOLES ON THE WALL & #35294454Z | Dec 18, 2017 WRITTEN OFF | $0 |
| Apr 12, 2016 | Construction CLASS - 1 OCCUPANCY CONTRAST TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS.NOTE: AS PER DEPT RECORDS ONLY 2 UNITS AT PREMISES TIME OF INSPECTION CELLAR LEVEL BEEN USE AS 3 SLEEPING UNITS W/BLOCK SECONDARY MEANS OF #35177735M | Jun 27, 2016 WRITTEN OFF | $0 |
| Dec 9, 2013 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O & DEPT OF BLDGS RECORDS 1STY CLASS"A" APT CONVERTED INTO(4)B ROOMS ALSO 2STY CLASS"A"APT CONVERTED INTO(5)B ROOMS ALL(9)ROOMS HAVE LOCKABLE DOORS & OCCUPIED BY SEPER #35072509N | May 11, 2015 WRITTEN OFF | $0 |
| Nov 12, 2013 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O & DOB RECORDS.1 STORY CLASS 'A' APT.& 2ND STORY CLASS 'A' APT.CONVERTED INTO B-ROOMS THROUGHOUT BLDG.PARTITIONS ERECTED SUBDIVIDING ALL ROOMS & ALL ROOMS HAVE LOCKAB #35072505X | May 18, 2015 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 13, 2019 | CONSTRUCTION BUILDING IN VIOLATION OF A FULL VACATE ORDER OCCUPIED ALL FLOORS WITH SROS THROUGH. #19-00552 | DOB VIOLATION - ACTIVE |
| Jul 13, 2019 | CONSTRUCTION FIRE CAUSED EXTENSIVE FIRE, WATER, AND SMOKE DAMAGE THROUGHOUT WITH OPEN WINDOWS, DOORS, AND ROOF LEAVING STRUCTURE OPEN TO ELEMENTS. #19-00553 | DOB VIOLATION - ACTIVE |
| Oct 3, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00275 | DOB VIOLATION - ACTIVE |
| Jul 13, 2016 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00347 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Oct 3, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 13, 2016 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 16, 2018 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE EXTERIOR GLASS PANE AT BASEMENT WINDOW , BUILDING FRONT | Aug 20, 2018 |
| Oct 27, 2017 | A | § 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE REAR YARD | Jan 30, 2018 |
| Apr 15, 2016 | B | Apt 1 · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | May 20, 2016 |
| Apr 15, 2016 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDED CEILING AT PUBLIC HALL, 1st STORY | May 20, 2016 |
| Apr 15, 2016 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY | Jul 19, 2016 |
| Apr 15, 2016 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ERODED MORTAR JOINT AND BRICK WORK AT CHIMNEY ON THE ROOF | May 20, 2016 |
| Apr 15, 2016 | B | Apt 2 · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2, 2nd STORY | May 20, 2016 |
| Apr 15, 2016 | B | Apt 2 · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY | May 20, 2016 |
| Apr 15, 2016 | B | Apt 1 · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | May 20, 2016 |
| Apr 15, 2016 | B | SECTION 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE REAR YARD | May 20, 2016 |
| Apr 15, 2016 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF SHEETROCK INSTALLED AT SKYLIGHT OBSTUCTING NATURAL LIGHT AND VENTILATION FOR PUBLIC HALL | May 20, 2016 |
| Apr 15, 2016 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDED CEILING AND EAST WALL AT PUBLIC HALL, 2nd STORY | May 20, 2016 |
| Apr 15, 2016 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND EAST WALL AT PUBLIC HALL, 2nd STORY | Jul 19, 2016 |
| Jun 25, 2014 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 2nd STORY | Jul 30, 2014 |
| Jun 25, 2014 | A | Apt 2FL · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2FL, 2nd STORY | Sep 28, 2014 |
| Dec 12, 2013 | B | Apt 1 · § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY | Jan 16, 2014 |
| Dec 12, 2013 | B | Apt 2 · § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT ... IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Jan 16, 2014 |
| Nov 19, 2013 | B | Apt 2 · § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Dec 24, 2013 |
| Nov 19, 2013 | B | Apt 1 · § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY | Dec 24, 2013 |
| Nov 18, 2013 | A | Apt 2 · SECTION 27-2005 ADMIN. CODE: REFIT WINDOW LOWER SASH IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY | Feb 21, 2014 |
| Nov 18, 2013 | B | Apt 2 · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Dec 23, 2013 |
| Nov 18, 2013 | B | Apt 9 · § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 9, 2nd STORY | Dec 23, 2013 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 8:17 PM ET. BBL 3039240063.