5 floors · 48 apartments · 40,075 sq ft · built 1922 · class C7 · owner of record: Mbd West Apartments Housing Development Fund Co.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-05-23 (Accepted). Agency page | Dec 31, 2026 in 61 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 40,075 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 23, 2026 | Unknown CLASS - 1 FAILURE TO NOTIFY THE DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY/INJURY. AT TIME OF INSPECTION UPON REVIEW OF DEPT RECORDS IT REVEALED THAT THERE WAS NO FILLING ELECTRONICALLY OF AN INCIDENT WITHIN 3 BUSIN #39560949P | Jan 15, 2027 PENDING | $10,000 |
| Oct 15, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION, SCAFFOLD LOGS INDICATED THE SCAFFOLD WAS PROPERLY MAINTAINED; HOWEVER, UNSAFE SCAFFOLD CONDITIONS WERE OBSERVED AT THE 5-STORY BUILDING, INCLUDING BROKEN PLANKING AND INADEQUATE MAINTENAN #39560641Z | Jan 15, 2027 PENDING | $10,000 |
| Oct 15, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, MISSING OR INADEQUATE TOE-BOARDS WERE OBSERVED ON SCAFFOLDS THROUGHOUT THE 5-STORY BUILDING DURING BRICK FACADE WORK. THE CONDITION CREATED A RISK OF TOOLS AND MATERIALS FALLING AND INJUR #39560642K | Jan 15, 2027 PENDING | $5,000 |
| Oct 15, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION, MISSING GUARDRAILS WERE OBSERVED ON SCAFFOLDS THROUGHOUT THE 5-STORY BUILDING DURING BRICK FACADE WORK. THE CONDITION EXPOSED WORKERS TO FALL HAZARDS.. INSTALL AND MAINTAIN REQUIRED GUARD #39560644Y | Jan 15, 2027 PENDING | $5,000 |
| Oct 15, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, A WORKER FELL FROM THE ROOF TO THE 2ND FLOOR DURING BRICK FACADE WORK AT A 5-STORY BUILDING, SUSTAINED INJURIES, AND WAS TRANSPORTED TO THE HOSPITAL. THE SCAFFOLD WORK AREA AT ROOF LEVEL #39560640R | Jan 15, 2027 PENDING | $10,000 |
| Oct 15, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, MISSING AND INADEQUATE GUARDRAILS WERE OBSERVED AT PARAPET EDGES AND WINDOW OPENINGS THROUGHOUT THE 5-STORY BUILDING DURING BRICK FACADE WORK. THE CONDITIONS EXPOSED WORKERS TO FALL HAZAR #39560643M | Jan 15, 2027 PENDING | $5,000 |
| Oct 15, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION, THE SITE PRE-SHIFT SAFETY MEETING RECORDS LACKED DETAILS ABOUT THE WORK BEING PERFORMED AND THE HAZARDS PRESENT AT THE 5-STORY BUILDING DURING BRICK FACADE WORK. . CONDUCT AND DOCUMENT PR #39560645X | Jan 15, 2027 PENDING | $2,500 |
| Jul 2, 2026 | Unknown CLASS - 2 6 STORY ALT2 ACTIVE SITE. OBSERVED TEMPORARY CONSTRUCTION EQUIPMENT IN PLACE/DEBRIS CHUTE ABOVE ROOF TO COURTYARD APPROXIMATELY 55 FT IN HEIGHT ATTACHED TO SUPPORTED SCAFFOLD EXP#1. UPON REQUEST TO CONTRACTOR F #39556134M | Sep 18, 2026 DEFAULT | $1,280 |
| Jul 2, 2026 | Construction CLASS - 1 6 STORY BUILDING ALT2 ACTIVE SITE.TEMPORARY PLATFORM WITH SHORING UNDERNEATH/CRASH DECK ON BSMT/1 FLOOR INSTALLED CONTRARY TO APPROVED PLANS PERMIT#X01393202.MISSING MULTIPLE CONNECTIONS FROM U BOLT TO I BEAMS #39556133K | Sep 18, 2026 ADMIT/IN-VIO | $0 |
| Jul 2, 2026 | Unknown CLASS - 2 6 STORY ALT FULL RENOVATION ACTIVE JOBSITE. OBSERVED MULTIPLE UNSAFE CONDITIONS ONSITE AS PER ECB#39556133K/34M/35Y/36X. INADEQUATE GUARDRAILS ON ROOF, DEBRIS CHUTE WITHOUT A PERMIT/PLANS.CRASH DECK ON 1 ST FL #39556180N | Sep 18, 2026 ADMIT/IN-VIO | $0 |
| Jul 2, 2026 | Construction CLASS - 2 6 STORY ALT2 ACTIVE SITE. OBSERVED SHORING ON 5 FL ATTACHED TO CEILING & MULTIPLE LOCATIONS ONSITE WITH MAKESHIFT TIMBER SHORING HOLDING UP LOAD BEARING MASONRY WALLS & WINDOW OPENINGS. UPON REQUEST TO CONTRACT #39556135Y | Sep 18, 2026 ADMIT/IN-VIO | $0 |
| Feb 13, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OF A 5 STORY DEMO,OBSERVED GENERAL CONTRACTOR CREW ENGAGING IN DEMOLITION OPERATIONS WITHOUT REQUIRED DEMOLITION ENDORSEMENT OR AUTHORIZATION TO PERFORM SUCH WORK. CONTRARY TO 28-401.4, PE #39550349M | Oct 9, 2026 DEFAULT | $5,030 |
| Nov 25, 1991 | Zoning Non-Hazardous ILLEGAL USE IN A RESIDENTIAL DISTRICT. OPERATING A GROCERY STORE IN A R-8 ZONING DISTRICT WHICH IS CONTRARY TO THE ZONING RESOLUTION. REMEDYDISCONTINUE ILLEGAL USE #34064265J | Feb 14, 1992 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06523 | DOB VIOLATION - ACTIVE |
| May 2, 2024 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00552 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00164 | DOB VIOLATION - ACTIVE |
| Nov 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00197 | DOB VIOLATION - ACTIVE |
| Aug 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00273 | DOB VIOLATION - ACTIVE |
| May 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00566 | DOB VIOLATION - ACTIVE |
| Aug 9, 2009 | CONSTRUCTION WORK W/OUT PERMIT #ERWB01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Nov 25, 1991 | ZONING #7J67 | VIOLATION UNSERVED ECB-ACTIVE |
| Mar 13, 1991 | ZONING #J1 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 5, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| May 2, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 22, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 8, 2023 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS COPY OF VACATE ORDER {#231508} POSTED ON ENTANCE DOOR TO 1ST STORY APT 3B AND ON ENTRANCE DOOR TO BUILDING | — |
| Jun 8, 2023 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS COPY OF VACATE ORDER {#231508} POSTED ON ENTANCE DOOR TO 3RD STORY APT 33B AND ON ENTRANCE DOOR TO BUILDING | — |
| Jun 8, 2023 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS COPY OF VACATE ORDER {#231508} POSTED ON ENTANCE DOOR TO 5TH STORY APT 53B AND ON ENTRANCE DOOR TO BUILDING | — |
| Jan 31, 2024 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| Jun 8, 2023 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS COPY OF VACATE ORDER {#231508} POSTED ON ENTANCE DOOR TO 4TH STORY APT 43B AND ON ENTRANCE DOOR TO BUILDING | — |
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Nov 22, 2024 | B | Apt 52B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WINDOW SASH BALANCE IN THE BATHROOM LOCATED AT APT 52B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 27, 2024 |
| Nov 22, 2024 | B | Apt 52B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASH BALANCE IN THE 5th ROOM FROM EAST LOCATED AT APT 52B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 27, 2024 |
| Nov 22, 2024 | B | Apt 52B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH BALANCE IN THE KITCHEN LOCATED AT APT 52B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 27, 2024 |
| Nov 22, 2024 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT 1st PUBLIC HALL BULKHEAD FROM EAST AT NORTH | Feb 25, 2025 |
| Nov 22, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT 1st PUBLIC HALL BULKHEAD FROM EAST AT NORTH | Dec 27, 2024 |
| Nov 22, 2024 | B | Apt 52B · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRING AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 52B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 27, 2024 |
| Nov 12, 2024 | B | Apt 32B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 32B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 32B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, SOUTH WALL IN THE KITCHEN LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | C | Apt 32B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQUARE FT AT ALL WALLS AND THE CEILING IN THE BATHROOM LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 8, 2024 |
| Nov 12, 2024 | C | Apt 32B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, EAST WALL IN THE KITCHEN LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM | Dec 6, 2024 |
| Nov 12, 2024 | C | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE 7TH MARBLE TREAD FROM INTERMEDIATE LANDING TO UP AT PUBLIC HALL STAIRS, 4th STORY, SECTION AT SOUTH | Nov 18, 2024 |
| Nov 12, 2024 | C | Apt 32B · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 26, 2024 |
| Nov 12, 2024 | C | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE 7TH MARBLE TREAD FROM BOTTOM TO UP AT PUBLIC HALL STAIRS, 5th STORY, SECTION AT NORTH | Nov 18, 2024 |
| Nov 12, 2024 | B | Apt 32B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | C | Apt 32B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 8, 2024 |
| Nov 12, 2024 | C | Apt 32B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS RATS IN THE ENTIRE APARTMENT LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 8, 2024 |
| Nov 12, 2024 | B | Apt 32B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 32B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 32B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS AT WEST AND EAST WALLS IN THE KITCHEN LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 32B · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE BATHTUB IN THE BATHROOM LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Nov 12, 2024 | B | Apt 32B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 32B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 17, 2024 |
| Sep 3, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BUILDING ENTRANCE , 1st STORY | Sep 17, 2024 |
| Aug 29, 2024 | C | Apt 22B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 22B, 2nd STORY, SECTION ''NORTH'' | Sep 24, 2024 |
| Aug 29, 2024 | B | Apt 22B · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSSING IN THE ENTIRE APARTMENT LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'' | Oct 3, 2024 |
| Aug 29, 2024 | B | Apt 22B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR VINYL TILE IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Oct 3, 2024 |
| Aug 29, 2024 | C | Apt 22B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUBFLOOR IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Sep 4, 2024 |
| Aug 29, 2024 | C | Apt 22B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Sep 24, 2024 |
| Aug 29, 2024 | B | Apt 22B · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT THE CEILING IN THE FOYER LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'', 2nd FROM EAST AT SOUTH | Oct 3, 2024 |
| Aug 29, 2024 | B | Apt 22B · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'' | Oct 3, 2024 |
| Aug 29, 2024 | C | Apt 22B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BROKEN GLASS AT WEST WINDOW AND UPPER SASH ON NORTH WINDOW IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Sep 4, 2024 |
| Aug 12, 2024 | B | Apt 22B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELETRICAL OUTLET AT SOUTH WALL IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 16, 2024 |
| Aug 12, 2024 | B | Apt 22B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 16, 2024 |
| Aug 12, 2024 | B | Apt 22B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE FOYER LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 16, 2024 |
| Aug 12, 2024 | B | Apt 22B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 16, 2024 |
| Aug 12, 2024 | C | Apt 22B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 7, 2024 |
| Aug 12, 2024 | C | Apt 22B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 7, 2024 |
| Aug 12, 2024 | B | Apt 22B · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 16, 2024 |
| Aug 12, 2024 | B | Apt 22B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE FOYER LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 16, 2024 |
| Aug 12, 2024 | C | Apt 22B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE KITCHEN LOCATED AT APT 22B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 18, 2024 |
| Aug 6, 2024 | C | Apt 54B · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT STOVE RANGE IN THE KITCHEN LOCATED AT APT 54B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 12, 2024 |
| Aug 6, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Aug 12, 2024 |
| Aug 5, 2024 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CABLE WIRES AT THE ROOF | Aug 11, 2024 |
| Aug 2, 2024 | C | Apt 42A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 42A, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 8, 2024 |
| Aug 2, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BULKHEAD DOOR AT PUBLIC HALL, 5th STORY, SECTION ''NORTH'' | Aug 16, 2024 |
| Aug 2, 2024 | C | Apt 42A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 42A, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 8, 2024 |
| Aug 2, 2024 | A | Apt 42A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 42A, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 5, 2024 |
| Aug 2, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ERODED BRICKS AND MORTAR JOINTS AT BUILDING EXTERIOR FACADE AT ALL STORIES AT SOUTH YARD | Aug 8, 2024 |
| Aug 2, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ERODED BRICKS AND MORTAR JOINTS AT BUILDING EXTERIOR FACADE AT ALL STORIES AT NORTH YARD | Aug 8, 2024 |
| Aug 2, 2024 | C | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT APT BELOW | Aug 8, 2024 |
| Aug 2, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ERODED BRICKS AND MORTAR JOINTS AT BUILDING EXTERIOR FACADE AT ALL STORIES AT WEST YARD | Aug 8, 2024 |
| Aug 2, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ERODED BRICKS AND MORTAR JOINTS AT BUILDING EXTERIOR FACADE AT ALL STORIES AT EAST YARD | Aug 8, 2024 |
| Aug 2, 2024 | C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AT BULKHEAD AT PUBLIC HALL STAIRS, 5th STORY, SECTION ''SOUTH'' | Aug 8, 2024 |
| Aug 1, 2024 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI GLASS AT BULIDING ENTRANCE DOOR FROM COURT TO VESTIBULE AT NORTH SECTION | Sep 5, 2024 |
Showing 60 of 400. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 23, 2026 | ECB | Unknown: FAILURE TO NOTIFY THE DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY/INJURY. AT TIME OF INSPECTION UPON REVIEW OF DEPT RECORDS IT REVEALED THAT THERE WAS NO FILLING ELECTRONICALLY OF AN INCIDENT WITHIN 3 BUSIN | Open |
| Oct 15, 2026 | ECB | Unknown: AT TIME OF INSPECTION, SCAFFOLD LOGS INDICATED THE SCAFFOLD WAS PROPERLY MAINTAINED; HOWEVER, UNSAFE SCAFFOLD CONDITIONS WERE OBSERVED AT THE 5-STORY BUILDING, INCLUDING BROKEN PLANKING AND INADEQUATE MAINTENAN | Open |
| Oct 15, 2026 | ECB | Construction: AT TIME OF INSPECTION, MISSING OR INADEQUATE TOE-BOARDS WERE OBSERVED ON SCAFFOLDS THROUGHOUT THE 5-STORY BUILDING DURING BRICK FACADE WORK. THE CONDITION CREATED A RISK OF TOOLS AND MATERIALS FALLING AND INJUR | Open |
| Oct 15, 2026 | ECB | Unknown: AT TIME OF INSPECTION, MISSING GUARDRAILS WERE OBSERVED ON SCAFFOLDS THROUGHOUT THE 5-STORY BUILDING DURING BRICK FACADE WORK. THE CONDITION EXPOSED WORKERS TO FALL HAZARDS.. INSTALL AND MAINTAIN REQUIRED GUARD | Open |
| Oct 15, 2026 | ECB | Construction: AT TIME OF INSPECTION, A WORKER FELL FROM THE ROOF TO THE 2ND FLOOR DURING BRICK FACADE WORK AT A 5-STORY BUILDING, SUSTAINED INJURIES, AND WAS TRANSPORTED TO THE HOSPITAL. THE SCAFFOLD WORK AREA AT ROOF LEVEL | Open |
| Oct 15, 2026 | ECB | Construction: AT TIME OF INSPECTION, MISSING AND INADEQUATE GUARDRAILS WERE OBSERVED AT PARAPET EDGES AND WINDOW OPENINGS THROUGHOUT THE 5-STORY BUILDING DURING BRICK FACADE WORK. THE CONDITIONS EXPOSED WORKERS TO FALL HAZAR | Open |
| Oct 15, 2026 | ECB | Unknown: AT TIME OF INSPECTION, THE SITE PRE-SHIFT SAFETY MEETING RECORDS LACKED DETAILS ABOUT THE WORK BEING PERFORMED AND THE HAZARDS PRESENT AT THE 5-STORY BUILDING DURING BRICK FACADE WORK. . CONDUCT AND DOCUMENT PR | Open |
| Aug 5, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 6:38 AM ET. BBL 2031800009.