Bronx · Block 5776 · Lot 619 · 10471

216 West 242 Street

1 floors · 4,590 sq ft · built 1920 · class K1 · owner of record: 216-222 West 242 St Llc

3open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 46 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)

Open violations

ECB / OATH (3) · $1,250 owed
IssuedViolationHearingBalance
Sep 23, 2026Construction CLASS - 2
WORK WITHOUT PERMIT : NOTED : THE REMOVAL OF 4 OLD LED SPOTLIGHT FIXTURES AND THE INSTALLATION OF 3 NEW LINEAR STROBE LIGHT FIXTURES AT EXPOSURE #1 APPROX. 3FT IN LENGTH EACH. NO JOB FILINGS OR PERMITS IN THE D
#39205273H
Dec 4, 2026
PENDING
$1,250
Aug 26, 2014Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONST DOC & OR APPROVED AMEND FOR ALT 2 JOB #220385483 FOR WHICH PERMIT IS ACTIVE TILL 9/27/14.NON-CONFORMING WORK NOTED:@ 1ST FLOOR FOUND BAR CONSTRUCTED ON EAST SIDE OF BLDGS
#34882719J
Oct 17, 2014
DEFAULT
$0
Apr 15, 2006Construction Non-Hazardous
EXIT SIGN DEFECTIVE-EXIT SIGN AT BASEMENT MEETING ROOM-CENTER AT FRONTNOT WORKING AT TIME OF INSEPCTION. REMEDY: REPAIR OR REPLACE SIGN FORTHWITH
#34501911H
Oct 20, 2006
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 23, 2026ECBConstruction: WORK WITHOUT PERMIT : NOTED : THE REMOVAL OF 4 OLD LED SPOTLIGHT FIXTURES AND THE INSTALLATION OF 3 NEW LINEAR STROBE LIGHT FIXTURES AT EXPOSURE #1 APPROX. 3FT IN LENGTH EACH. NO JOB FILINGS OR PERMITS IN THE DOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 7:55 AM ET. BBL 2057760619.

Look up another building