Manhattan · Block 1876 · Lot 22 · 10025

215 West 104 Street

2 floors · 21,030 sq ft · built 1977 · class Z3 · owner of record: Usps

4open violations
$16,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1140dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029

Open violations

ECB / OATH (2) · $16,250 owed
IssuedViolationHearingBalance
Jun 2, 2021Construction CLASS - 2
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION. AT TIME OF INSPECTION ON A 2 STY BLDG OBSERVED SWS ERECTED AT EXP#1 MISSING CAPS FROM THE BOLTS CREATE HAZARDOUS CONDITION FOR PEDESTRIAN INJURY FROM SHAR
#35558870Y
Aug 19, 2021
DEFAULT
$10,000
Jul 20, 2020Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONST. DOCS. AND/OR APPROVED AMENDMENTS. OBSERVED SIDEWALK SHED INSTALLED UNDER APP. #M00348349-I1-SH WITH PERMIT VALID THRU 03/28/2021, PARAPET INSTALLED ON-SITE IS 8' TALL CO
#39025655P
Sep 3, 2020
DEFAULT
$6,250
DOB (1)
IssuedViolationStatus
Feb 20, 2024CONSTRUCTION
WORK WITHOUT A PERMIT. NOTED AT ROOFTOP OF UNITED STATES POSTAL OFFICE (3) NEW AIR HANDLER UNITS INSTALLED ON STRUCTURAL STEEL DUNNAGE WITH APPROX 200LF OF ASSOCIATED DUCT WORK EXTENDING FROM UNITS ACROSS ROOFTOP AND INTO BUILDING. OBSERVED NO PERMITS ON FILE FOR MECHANICAL WORK, STRUCTURAL, ELECTRI
#24-00396
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 7)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 6:52 AM ET. BBL 1018760022.