Manhattan · Block 904 · Lot 10 · 10010

215 East 23 Street

22 floors · 69,706 sq ft · built 2001 · class H8 · owner of record: Ocean Drive Realty Associates,

8open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
42dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 42 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $65,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 94 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 69,706 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 163 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 163 days
Annual filing
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 904). Agency page

Dec 31, 2034
in 2964 days
Next due 2034
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-27 (Pre-filing). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $1,250 owed
IssuedViolationHearingBalance
Sep 16, 2026Construction CLASS - 2
DURING INSPECTION OF 22 STORY ALTERATION, OBSERVED ACTIVE INSTALLATION OF SUSPENDED SCAFFOLDS, UPON CHECKING DOCUMENTS NO WORKERS ORIENTATION AND QSP DESIGNATION LETTER WAS PRESENTED. FAILURE TO MAINTAIN/DISPLA
#39559223H
Dec 3, 2026
PENDING
$1,250
DOB (2)
IssuedViolationStatus
Dec 13, 2011ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
#00836
DOB VIOLATION - ACTIVE
Oct 19, 1989CONSTRUCTION

#B1EP01
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Dec 13, 2011Elevators EVCAT1
Active
Dec 13, 2011Elevators EVCAT1
Active
Dec 13, 2011Elevators EVCAT1
Active
Dec 13, 2011Elevators EVCAT1
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 16, 2026ECBConstruction: DURING INSPECTION OF 22 STORY ALTERATION, OBSERVED ACTIVE INSTALLATION OF SUSPENDED SCAFFOLDS, UPON CHECKING DOCUMENTS NO WORKERS ORIENTATION AND QSP DESIGNATION LETTER WAS PRESENTED. FAILURE TO MAINTAIN/DISPLAOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 5:44 AM ET. BBL 1009040010.