2 floors · 26,696 sq ft · built 1965 · class H4 · owner of record: 215 Northern Property Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 49 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-18 (Accepted). Agency page | Dec 31, 2026 in 49 days | 5 of 5 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 26,696 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 170 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 170 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 414 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 19, 2026 | Elevators CLASS - 2 CLASS 2: ELEVATOR DEVICE HAS NOT UNDERGONE THE REQUIRED CATEGORY 5 FULL LOAD SAFETY TEST SINCE 09/18/2019, IN VIOLATION OF PERIODIC INSPECTION AND TESTING REQUIREMENTS. REMEDY: PERFORM A CATEGORY 5 FULL LOAD SA #39177749Z | Apr 28, 2026 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 10, 2021 | ELEVATOR #9027/709109 | DOB VIOLATION - ACTIVE |
| Aug 22, 2020 | ELEVATOR #9027/686318 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 2, 2026 | C | Apt 239 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE BATHROOM LOCATED AT B-ROOM 239, 2nd STORY, 2nd B-ROOM FROM SOUTH AT WEST | Oct 31, 2026 |
| Nov 2, 2026 | C | Apt 108 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 108, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 1, 2026 |
| Nov 2, 2026 | C | Apt 246 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE BATHROOM LOCATED AT B-ROOM 246, 3rd STORY, 5th B-ROOM FROM EAST AT SOUTH | Oct 31, 2026 |
| Mar 16, 2026 | C | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE INSTALLED AT BUILDING NORTH ENTRANCE , 1st STORY | Mar 30, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 2, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE BATHROOM LOCATED AT B-ROOM 239, 2nd STORY, 2nd B-ROOM FROM SOUTH AT WEST | Open |
| Nov 2, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 108, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Nov 2, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE BATHROOM LOCATED AT B-ROOM 246, 3rd STORY, 5th B-ROOM FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 12, 2026, 1:44 AM ET. BBL 4073350001.