Queens · Block 6245 · Lot 1 · 11361

215-28 38 Avenue

2 floors · 5,940 sq ft · built 1931 · class M4 · owner of record: Asez, Husam

8open violations
$53,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-02-27 (Accepted). Agency page

Dec 31, 2026
in 47 days
2 of 2 without an accepted 2026 report yet
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 412 days
Next cycle year 2027

Open violations

ECB / OATH (4) · $53,750 owed
IssuedViolationHearingBalance
Oct 1, 2025Construction CLASS - 1
OBSERVED IN THE DRIVEWAY CONSTRUCTION DEBRIS PILED UP CONTAINING WOOD PALLETS, SHEET ROCKS PLASTIC BUCKETS, WOOD STUDS ACCESSIBLE TO THE PUBLIC., REPAIR AND/REPLACE
#39162155J
Feb 22, 2027
DEFAULT
$12,500
Oct 1, 2025Construction CLASS - 1
FULL STOP WORK ORDER EXISTING AND ACTIVE. FULL STOP WORK ORDER STICKER WAS POSTED ON 09/04/2025 BY BADGE NUMBER 2647 AT FRONT ENTRY DOOR. HOWEVER, OBSERVED AT THE TIME OF INSPECTION STOP WORK ORDER STICKER HAS
#39162156L
Feb 22, 2027
DEFAULT
$25,000
Sep 4, 2025Construction CLASS - 2
OBSERVED ACTIVE CONSTRUCTION SITE UNDER PERMIT NUMBER Q 01236781-GC ISSUED 6/12/2025 AND EXPIRES: 09/03/2025. ACCESS DENIED FOR INSPECTION BY A CONSTRUCTION WORKER AT THE ENTRY DOOR., PROVIDE ACCESS AND/OR EXPO
#39159181X
Dec 30, 2025
DEFAULT
$10,000
Sep 4, 2025Construction CLASS - 2
CONSTRUCTION PERMIT NUMBER Q 01236781-GC ISSUED 6/12/2025 AND EXPIRES: 09/03/2025. OBSERVED 2 CONSTRUCTION WORKERS BUSY PUTTING UP THE NEW SHEET ROCKS ALONG WITH THE SEALING COMPOUNDS. NO NEW PERMIT/ OTHER CONS
#39159180Y
Dec 30, 2025
DEFAULT
$6,250
DOB (0)

None open.

DOB NOW Safety (4)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 4:39 AM ET. BBL 4062450001.

Look up another building