1 floors · 15,735 sq ft · built 1952 · class K1 · owner of record: Parsh Realty Co, Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-16 (Accepted). Agency page | Dec 31, 2026 in 61 days | 3 of 4 without an accepted 2026 report yet |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 426 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 24, 2021 | Boilers CLASS - 2 FOUND WEIL MCLAIN BOILER MODEL # CGA-6 PIDN SERIAL# CP7931903 UNREGISTERED OBTAIN THE NECCESARY PERMIT AND REGISTER THE BOILER. #39051834J | Feb 15, 2022 IN VIOLATION | $0 |
| Jun 3, 2009 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER NOTED UNDERMINNING OF 2INCH CONCRETE (UNREINFORCED) CELLAR FL 2-3FT BEYOND SUMP PUMP WELL AT A DEPTH OF APPROX 5FT REMEDY: SUPPORT CONCRETE SLAB OBTAIN AND SU #34780447H | Jun 1, 2010 IN VIOLATION | $0 |
| Jun 3, 2009 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER NO FIRESTOPPING AS PER BC1014.2 NOTED MISSING APPROX 80SQ FT OF CEILING IN CELLAR EXPOSING WOOD FL AND JOIST OF 1ST FL REMEDY: PROVIDE MAINTAIN FIRESTOPPING #34780448J | Jan 5, 2010 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00983 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #14758 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #17909 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #19849 | DOB VIOLATION - ACTIVE |
| Nov 18, 2010 | CONSTRUCTION #CN1101MB | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #267724 | DOB VIOLATION - ACTIVE |
| Jun 17, 1992 | BOILER #H105341-01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 7:31 PM ET. BBL 4076380001.