Bronx · Block 3206 · Lot 59 · 10453

2121 Grand Avenue

3 floors · 2 apartments · 3,564 sq ft · built 1920 · class B9 · owner of record: Kg 2121 Grand Ave Llc

26open violations
$12,500ECB/OATH penalties owed
1HPD class C (immediately hazardous)
302dto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 302 days
Registered through 2027-09-01

Open violations

ECB / OATH (1) · $12,500 owed
IssuedViolationHearingBalance
Jul 28, 2023Construction CLASS - 1
OCCUPANCY IN CONTRARY TO THOSE ALLOWED BY C/O AND/OR DEPARTMENT OF BUILDING RECORD.ILLEGALLY CREATED CLASS A APARTMENT WITH FULL BATHROOM AND KITCHEN AT 1ST STY REAR WITH NO SEEMED MEANS OF EGRESS.VACATE RECOMM
#35486411P
Mar 11, 2025
DEFAULT
$12,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (25) · C 1 · B 13 · A 9
IssuedClassViolationCorrect by
Aug 7, 2023I§ 27-2142 ADM CODE - THE PREMISES OR APTS. HAVE BEEN VACATED BY THE DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR 1ST STORY EAST 1 ILLEGAL CLASS ( A ) APARTMENT CREATED UNDER VACATE ORDER # 235786—
Sep 21, 2010I§ 27-2142 ADM CODE - THE PREMISES OR APTS. HAVE BEEN VACATED BY THE DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APT. 1B ILLEGAL CLASS A APT. CREATED LOCATED AT APT, 1st STORY, 1st APARTMENT FROM NORTH AT EAST—
Nov 28, 2023BApt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQFT AT THE CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear'' ORIGINAL VIOLATION 16125137 ISSUED 27-JUL-23 HAS BEEN UPGRADED TO CLASS B PER AJan 2, 2024
Nov 28, 2023BApt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 8 SQFT AT THE WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear'' ORIGINAL VIOLATION 16125136 ISSUED 27-JUL-23 HAS BEEN UPGRADED TO CLASS B PERJan 2, 2024
Nov 28, 2023BApt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 8 SQFT AT THE CEILING IN THE FOYER LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear'' ORIGINAL VIOLATION 16125133 ISSUED 27-JUL-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVEJan 2, 2024
Nov 28, 2023BApt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 8 SQFT AT THE WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear'' ORIGINAL VIOLATION 16125129 ISSUED 27-JUL-23 HAS BEEN UPGRADED TO CLJan 2, 2024
Aug 3, 2023BApt .1 · § 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE GAS RANGE IN THE KITCHENETTE LOCATED AT APT .1, 1st STORY, 1st APARTMENT FROM NORTH AT EASTSep 7, 2023
Aug 3, 2023BApt .1 · § 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS IN THE BATHROOM AND KITCHENETTE LOCATED AT APT .1, 1st STORY, 1st APARTMENT FROM NORTH AT EASTSep 7, 2023
Aug 3, 2023B§ 9, 56, 193, 300, 302 M.D. LAW- ABOVE FRAME BUILDING HAS BEEN CONVERTED FROM A PRIVATE DWELLING TO A MULTIPLE DWELLING AND IS NOW OCCUPIED AND MAINTAINED AS SUCH CONTRARY TO LAW.RESTORE PREMISES TO LAWFUL OCCUPANCY, 1st STORYSep 7, 2023
Jul 31, 2023BApt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE THE CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Sep 4, 2023
Jul 31, 2023AApt 1 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT NORTH WALL IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Nov 3, 2023
Jul 31, 2023AApt 1 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Nov 3, 2023
Jul 31, 2023AApt 1 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Nov 3, 2023
Jul 31, 2023AApt 1 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Nov 3, 2023
Jul 31, 2023AApt 1 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CERAMIC TILES AT THE EAST WALL, WEST WALL AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Nov 3, 2023
Jul 31, 2023AApt 1 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Nov 3, 2023
Jul 31, 2023AApt 1 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Nov 3, 2023
Jul 31, 2023AApt 1 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Nov 3, 2023
Jul 31, 2023AApt 1 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Nov 3, 2023
Jul 31, 2023BApt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''rear''Sep 4, 2023
Sep 9, 2010B§ 9, 56, 193, 300, 302 M.D. LAW- ABOVE FRAME BUILDING HAS BEEN CONVERTED FROM A PRIVATE DWELLING TO A MULTIPLE DWELLING AND IS NOW OCCUPIED AND MAINTAINED AS SUCH CONTRARY TO LAW.RESTORE PREMISES TO LAWFUL OCCUPANCYOct 14, 2010
Sep 9, 2010B§ 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF AN ENCLOSED WOOD STRUCTURE ERECTED AT THE BUILDING REAROct 14, 2010
Sep 9, 2010B§ 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE ( GAS RANGE INSTALLED AT 1ST STORY REAR APARTMENT #1B )Oct 14, 2010
Sep 9, 2010B§ 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF AN ILLEGAL CLASS ''A'' APARTMENT ARRANGED & OCCUPIED AT THE 1ST STORY / BUILDING REAROct 14, 2010
Sep 7, 2010C§ 27-2018 ADMIN. CODE: ABATE THE NUISNACE CONSISTING OF RODENTS ( CONSISTING OF RATS ) AT THE REAR YARDSep 13, 2010

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 12:07 PM ET. BBL 2032060059.

Look up another building