4 floors · 70,800 sq ft · built 1949 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 70,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 432 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1755). Agency page | Dec 31, 2035 in 3354 days | Next due 2035 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-08 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: AT EVERY FLOOR OF (1ST TO 3RD) FLOORS THRU INSTALLED/USED KICK/SCREW BOLT DOOR ST #35736121X | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT ALL FLOORS FROM (1ST FL THRU 3RD FL) SMOKE/HALLWAYS DOORS WITHOUT PROVIDED DOOR HANDLES MISSING/NONE. REMEDY: REPAIR AND/OR REPLACE. #35736122H | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (1ST FL)GYM, EXIT 6 DOORS IN DISREPAIR/RACKED WHEN TESTED. REMEDY: REPAIR AND/OR REPLACE. #35736120Y | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 REISSUE ECB #35725236M. EXIT DOOR NOT SELF-CLOSING. NOTED: AT (1ST FL)EXITS 1, 5 DOORS RE IN DISREPAIR/NOT CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOOR. #35736119R | Aug 14, 2026 POP/IN-VIO | $0 |
| Sep 8, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: AT(1ST FL) MAIN ENTRANCE, EXITS 2, 3, 5 ALL DOORS ARE IN DISREPAIR NOT CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOORS. #35725236M | Oct 3, 2025 POP/IN-VIO | $0 |
| Apr 22, 2023 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION. I WALKED THE PERIMETER AND OBSERVED THAT THERE WAS NO PERMITS POSTED FOR THE JOBSITE. THE PERMITS ALLOW THE PUBLIC TO KNOW WHATS GOIN ON ONSITE AND HAS GC AND JOB NUMBER INFORMATIO #39515718P | Jun 29, 2023 ADMIT/IN-VIO | $0 |
| Apr 22, 2023 | Construction CLASS - 2 AT THE OF MY INSPECTION I OBSERVED A SIDEWALK SHED AROUND THE PERIMETER.OF THE JOBSITE. THIS SHED WAS AT EXPOSURES 1 2 3 & 4. THE SHED CONTAINED PROHIBITED ADVERTISEMENT ON THE PARAPET. THIS ADVERTISEMENT WAS #39515717N | Jun 29, 2023 ADMIT/IN-VIO | $0 |
| Apr 22, 2023 | Construction CLASS - 2 AT THE OF MY INSPECTION I OBSERVED A SIDEWALK SHED AROUND THE PERIMETER.OF THE JOBSITE. THIS SHED WAS AT EXPOSURES 1 2 3 AND 4. THE SHED DID NOT HAVE THE REQUIRED PARAPET INFORMATION SIGN AS REQUIRED. THIS SIG #39515716L | Jun 29, 2023 ADMIT/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 24, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: AT EVERY FLOOR OF (1ST TO 3RD) FLOORS THRU INSTALLED/USED KICK/SCREW BOLT DOOR ST | Open |
| Jul 24, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT ALL FLOORS FROM (1ST FL THRU 3RD FL) SMOKE/HALLWAYS DOORS WITHOUT PROVIDED DOOR HANDLES MISSING/NONE. REMEDY: REPAIR AND/OR REPLACE. | Open |
| Jul 24, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (1ST FL)GYM, EXIT 6 DOORS IN DISREPAIR/RACKED WHEN TESTED. REMEDY: REPAIR AND/OR REPLACE. | Open |
| Jul 24, 2026 | ECB | Construction: REISSUE ECB #35725236M. EXIT DOOR NOT SELF-CLOSING. NOTED: AT (1ST FL)EXITS 1, 5 DOORS RE IN DISREPAIR/NOT CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOOR. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 8:32 AM ET. BBL 1017550001.