Brooklyn · Block 2335 · Lot 26 · 11249

212 Bedford Avenue

3 floors · 2 apartments · 2,420 sq ft · built 1899 · class S2 · owner of record: Liang, Guo Qin

3open violations
$12,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
787dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 56 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 300 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 787 days
Next cycle year 2028

Open violations

ECB / OATH (2) · $12,500 owed
IssuedViolationHearingBalance
Oct 30, 2026Unknown CLASS - 1
FAILURE TO PROVIDE PROTECTION FOR TENANTS DURING DEMOLITION OR CONSTRUCTION ACTIVITY IN AN OCCUPIED BUILDING. OBSERVED THE TPP FAILS TO IDENTIFY THE MEANS AND METHODS FOR THE REMOVAL OF EXISTING FIREPROOFING MA
#39210150Y
Jan 13, 2027
PENDING
$10,000
Oct 30, 2026Construction CLASS - 1
FTM BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSVD AT 1ST FL COMMERCIAL SPACE, FIREPROOFING HAS BEEN REMOVED FROM ENTIRE CEILING WHILE 2ND FL
#39210149R
Jan 13, 2027
PENDING
$2,500
DOB (1)
IssuedViolationStatus
Oct 30, 2026CONSTRUCTION
FTM BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSVD AT 1ST FL COMMERCIAL SPACE, FIREPROOFING HAS BEEN REMOVED FROM ENTIRE CEILING WHILE 2ND FL IS OCCUPIED. THIS CREATES AN IMMEDIATE HAZARD FOR TENANT OCCUPYING 2ND FLOOR RESIDENTIAL U
#26-02494
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 30, 2026DOBCONSTRUCTION: FTM BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSVD AT 1ST FL COMMERCIAL SPACE, FIREPROOFING HAS BEEN REMOVED FROM ENTIRE CEILING WHILE 2ND FL IS OCCUPIED. THIS CREATES AN IMMEDIATE HAZARD FOR TENANT OCCUPYING 2ND FLOOR RESIDENTIAL UOpen
Oct 30, 2026ECBUnknown: FAILURE TO PROVIDE PROTECTION FOR TENANTS DURING DEMOLITION OR CONSTRUCTION ACTIVITY IN AN OCCUPIED BUILDING. OBSERVED THE TPP FAILS TO IDENTIFY THE MEANS AND METHODS FOR THE REMOVAL OF EXISTING FIREPROOFING MAOpen
Oct 30, 2026ECBConstruction: FTM BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSVD AT 1ST FL COMMERCIAL SPACE, FIREPROOFING HAS BEEN REMOVED FROM ENTIRE CEILING WHILE 2ND FLOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 5, 2026, 3:42 PM ET. BBL 3023350026.

Look up another building