3 floors · 2 apartments · 2,420 sq ft · built 1899 · class S2 · owner of record: Liang, Guo Qin
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 787 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 30, 2026 | Unknown CLASS - 1 FAILURE TO PROVIDE PROTECTION FOR TENANTS DURING DEMOLITION OR CONSTRUCTION ACTIVITY IN AN OCCUPIED BUILDING. OBSERVED THE TPP FAILS TO IDENTIFY THE MEANS AND METHODS FOR THE REMOVAL OF EXISTING FIREPROOFING MA #39210150Y | Jan 13, 2027 PENDING | $10,000 |
| Oct 30, 2026 | Construction CLASS - 1 FTM BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSVD AT 1ST FL COMMERCIAL SPACE, FIREPROOFING HAS BEEN REMOVED FROM ENTIRE CEILING WHILE 2ND FL #39210149R | Jan 13, 2027 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Oct 30, 2026 | CONSTRUCTION FTM BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSVD AT 1ST FL COMMERCIAL SPACE, FIREPROOFING HAS BEEN REMOVED FROM ENTIRE CEILING WHILE 2ND FL IS OCCUPIED. THIS CREATES AN IMMEDIATE HAZARD FOR TENANT OCCUPYING 2ND FLOOR RESIDENTIAL U #26-02494 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 30, 2026 | DOB | CONSTRUCTION: FTM BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSVD AT 1ST FL COMMERCIAL SPACE, FIREPROOFING HAS BEEN REMOVED FROM ENTIRE CEILING WHILE 2ND FL IS OCCUPIED. THIS CREATES AN IMMEDIATE HAZARD FOR TENANT OCCUPYING 2ND FLOOR RESIDENTIAL U | Open |
| Oct 30, 2026 | ECB | Unknown: FAILURE TO PROVIDE PROTECTION FOR TENANTS DURING DEMOLITION OR CONSTRUCTION ACTIVITY IN AN OCCUPIED BUILDING. OBSERVED THE TPP FAILS TO IDENTIFY THE MEANS AND METHODS FOR THE REMOVAL OF EXISTING FIREPROOFING MA | Open |
| Oct 30, 2026 | ECB | Construction: FTM BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSVD AT 1ST FL COMMERCIAL SPACE, FIREPROOFING HAS BEEN REMOVED FROM ENTIRE CEILING WHILE 2ND FL | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 3:42 PM ET. BBL 3023350026.