5 floors · 8 apartments · 13,638 sq ft · built 1906 · class C7 · owner of record: New York Equity Fund 2004 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 52 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 52 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 68 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 296 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 417 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 1, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT APARTMENT 5B MULTIPLE WINDOWS FOUND TO BE INOPERABLE INCLUDING FIRE ESCAPE ACCESS WINDOW UNABLE TO OPEN. CITED ABOVE AFFE #39057141Y | Aug 18, 2022 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 28, 2026 | A | Apt 24A · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE GFCI ELECTRICAL OUTLET AT NORTH WALL IN THE BATHROOM LOCATED AT APT 24A LOWER LEVEL, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 31, 2027 |
| Oct 28, 2026 | B | Apt 24A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GFCI ELECTRICAL OUTLET AT NORTH WALL THAT IS IN [ OPEN NEUTRAL POLARITY ] IN THE BATHROOM LOCATED AT APT 24A LOWER LEVEL, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 2, 2026 |
| Oct 28, 2026 | B | Apt 24A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 24A, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 2, 2026 |
| Oct 28, 2026 | A | Apt 24A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 24A UPPER LEVEL, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 31, 2027 |
| Oct 28, 2026 | B | Apt 24A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED CONCRETE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 24A UPPER LEVEL, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 2, 2026 |
| Oct 26, 2026 | B | § 27-2005 ADM CODE PROVIDE AN UNLOCKABLE SLIDE BOLT OR HOOK ON ROOF DOOR THAT ALLOW RE-ENTRY FROM ROOF TO PUBLIC HALLWAY AT PUBLIC HALL, 5th STORY | Nov 30, 2026 |
| Oct 26, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD CEILING AND WALLS AT PUBLIC HALL, 5th STORY | Jan 29, 2027 |
| Oct 26, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Jan 29, 2027 |
| Oct 26, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE BULKHEAD CEILING AT PUBLIC HALL, 5th STORY | Nov 30, 2026 |
| Oct 26, 2026 | B | Apt 3B · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WATER SUPPLY LINE UNDER WASH BASIN IN THE 1st BATHROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 30, 2026 |
| Oct 26, 2026 | B | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW [ CREATING A GUILLOTINE EFFECT ] IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 30, 2026 |
| Oct 26, 2026 | B | Apt 4A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GLASS AT UPPER SASH WINDOW PANEL AT [ 2ND WINDOW FROM WEST ] IN THE 3rd ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 30, 2026 |
| Oct 26, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Nov 30, 2026 |
| Oct 26, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT BULKHEAD CEILING AND ALL WALLS AT PUBLIC HALL, 5th STORY | Nov 30, 2026 |
| Oct 26, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCHING SET AT BULKHEAD DOOR ROOF AT PUBLIC HALL, 5th STORY | Nov 9, 2026 |
| Jun 24, 2026 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 20, 2026 |
| Jun 24, 2026 | C | Apt 2B · 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Jul 20, 2026 |
| Jun 24, 2026 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SINK BASE CABINET DOORS AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 29, 2026 |
| Jun 24, 2026 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER AND UPPER WOOD CABINET DOORS AT WEST WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 29, 2026 |
| Jun 24, 2026 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WOOD CABINET DOORS AT EAST WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 29, 2026 |
| Jun 24, 2026 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARDWOOD FLOOR IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 29, 2026 |
| Jun 24, 2026 | B | Apt 2B · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS , MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 29, 2026 |
| Jun 24, 2026 | B | Apt 2B · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 29, 2026 |
| Jul 29, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT ROOF BULKHEAD DOOR 5TH STORY | Aug 12, 2024 |
| Jul 16, 2024 | A | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DRAWER AT WOOD BASE CABINET SOUTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 19, 2024 |
| Jul 16, 2024 | A | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE SOUTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 19, 2024 |
| Jul 16, 2024 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT CEILING IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 20, 2024 |
| Jul 16, 2024 | A | Apt 2B · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 19, 2024 |
| Jul 16, 2024 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE SADDLE IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 20, 2024 |
| Jul 16, 2024 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 11, 2024 |
| Jul 16, 2024 | A | Apt 2B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 19, 2024 |
| Jul 16, 2024 | A | Apt 2B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st BATHROOM FROM EAST, THE 1st PRIVATE HALLWAY FROM EAST, THE 2nd BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 19, 2024 |
| Jul 16, 2024 | A | Apt 2B · § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 19, 2024 |
| Jul 16, 2024 | A | Apt 2B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 19, 2024 |
| Nov 13, 2023 | C | Apt 5A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 11, 2023 |
| Aug 21, 2023 | B | Apt 3B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASE CABINET AT WASH BASIN ROTTEN IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 25, 2023 |
| Aug 21, 2023 | B | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT EAST WALL WINDOW IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 25, 2023 |
| Aug 21, 2023 | A | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT WINDOW IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 24, 2023 |
| Aug 21, 2023 | A | Apt 3B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 24, 2023 |
| Aug 21, 2023 | B | Apt 3B · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WATER CLOSET IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 25, 2023 |
| Dec 19, 2022 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Dec 25, 2022 |
| Dec 19, 2022 | C | Apt 2A · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 2nd ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 19, 2022 |
| Dec 19, 2022 | C | Apt 2A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 2nd ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 19, 2022 |
| Dec 13, 2021 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT | Dec 19, 2021 |
| Jun 8, 2021 | A | Apt 3A · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 11, 2021 |
| Jun 8, 2021 | B | Apt 3A · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH IN THE 5th ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 13, 2021 |
| Jun 8, 2021 | A | Apt 3A · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 11, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 28, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE GFCI ELECTRICAL OUTLET AT NORTH WALL IN THE BATHROOM LOCATED AT APT 24A LOWER LEVEL, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 28, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GFCI ELECTRICAL OUTLET AT NORTH WALL THAT IS IN [ OPEN NEUTRAL POLARITY ] IN THE BATHROOM LOCATED AT APT 24A LOWER LEVEL, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 28, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 24A, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 28, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 24A UPPER LEVEL, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 28, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED CONCRETE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 24A UPPER LEVEL, 24th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 26, 2026 | HPD B | § 27-2005 ADM CODE PROVIDE AN UNLOCKABLE SLIDE BOLT OR HOOK ON ROOF DOOR THAT ALLOW RE-ENTRY FROM ROOF TO PUBLIC HALLWAY AT PUBLIC HALL, 5th STORY | Open |
| Oct 26, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD CEILING AND WALLS AT PUBLIC HALL, 5th STORY | Open |
| Oct 26, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Open |
| Oct 26, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE BULKHEAD CEILING AT PUBLIC HALL, 5th STORY | Open |
| Oct 26, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WATER SUPPLY LINE UNDER WASH BASIN IN THE 1st BATHROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 26, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW [ CREATING A GUILLOTINE EFFECT ] IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 26, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GLASS AT UPPER SASH WINDOW PANEL AT [ 2ND WINDOW FROM WEST ] IN THE 3rd ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 26, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Open |
| Oct 26, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT BULKHEAD CEILING AND ALL WALLS AT PUBLIC HALL, 5th STORY | Open |
| Oct 26, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCHING SET AT BULKHEAD DOOR ROOF AT PUBLIC HALL, 5th STORY | Open |
| Aug 7, 2026 | ECB | Construction: FAILURE TO SUBMIT A CERTIFICATE OF CORRECTION OF VIOLATION #39057141Y ISSUED ON 03-01-2022 FOR FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER., FILE A CERTIFICATE OF CORRECTION | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 9, 2026, 3:12 PM ET. BBL 1021110008.