3 floors · 6 apartments · 6,318 sq ft · built 1906 · class C2 · owner of record: Brooklyn Park Terrace Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 432 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-01 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #11539 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 21, 2026 | B | Apt 1E · 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AN | Nov 25, 2026 |
| Oct 21, 2026 | B | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 25, 2026 |
| Oct 21, 2026 | A | Apt 1B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 24, 2027 |
| Oct 21, 2026 | B | Apt 1E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 6th ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 25, 2026 |
| Nov 13, 2024 | B | Apt 1B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17120282 ISSUED 09-JUL-24 HAS BEEN UPGRADED TO CLASS B PER ADMINIS | Dec 18, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 21, 2026 | HPD B | 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AN | Open |
| Oct 21, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 21, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 21, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 6th ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 12:46 PM ET. BBL 3051250048.