22 floors · 40 apartments · 64,660 sq ft · built 1985 · class R4 · owner of record: The Morgan Court Condominium
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $2,654,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 113 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 64,660 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 865). Agency page | Dec 31, 2035 in 3348 days | Next due 2035 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A AND 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #902497. AGG1: PRIOR NOV 37026111Z UNDER #37036466R | Jul 16, 2026 DEFAULT | $10,000 |
| Oct 28, 2025 | Unknown CLASS - 1 NOTE: AT TIME OF INSPECTION, I OBSERVED MULTIPLE PARAPET CLAMPS INSTALLED ALONG THE PARAPET, UPON REQUEST FOR THE REGISTERED DESIGN PROFESSIONAL INSPECTION/EVALUATION TO CONFIRM THAT THE PARAPET CAN SUPPORT THE #39546434P | Jan 8, 2026 IN VIOLATION | $5,000 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #802497. AGG1: PRIOR NOV 37022113Y UNDER 28-302 #37026111Z | May 16, 2024 IN VIOLATION | $3,125 |
| Dec 4, 2021 | Construction CLASS - 1 UNLAWFUL ACTS.FAILURE TO COMPLY WITH COMMISSIONER'S ORDERS.RECORDS INDICATE NO APP WAS MADE TO CORRECT OR CERTIFY ECB#'S 35634217N & 35228980N.REM:COMPLY WITH COMMISSIONER'S ORDERS. #35634428N | Sep 22, 2022 IN VIOLATION | $2,500 |
| Oct 14, 2021 | Construction CLASS - 1 UNLAWFUL ACTS.FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER.FAILURETO CORRECT & CERTIFY SUMMONS ECB #35228980N & ECB#35227245M.UNAPPROVEDUNSAFE,UNSUITABLE ELECTRICAL EQUIPMENT,APPARATUS,MATERIALS,DEVICES,APP #35634217N | Sep 22, 2022 IN VIOLATION | $2,500 |
| Oct 8, 2021 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REQUIRED BY 28-302.5 FOR CONTROL#802497. REMEDY: FILE ACCEPTABLE REPORT. #37022113Y | Aug 11, 2022 IN VIOLATION | $0 |
| Mar 22, 2017 | Unknown CLASS - 1 UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT APPARATUS & MATERIALS,DEVICES,APPLIANCES OR WIRING IN USE. AT THE TIME OF MY INSPECTION I OBSERVED OPEN & EXPOSED ENERGIZED PANELS. ENERGIZED & LAYING EXPOSED O #35228980N | May 11, 2017 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00247 | DOB VIOLATION - ACTIVE |
| Feb 2, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00075 | DOB VIOLATION - ACTIVE |
| Nov 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00105 | DOB VIOLATION - ACTIVE |
| Aug 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00196 | DOB VIOLATION - ACTIVE |
| May 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00196 | DOB VIOLATION - ACTIVE |
| Feb 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00116 | DOB VIOLATION - ACTIVE |
| Nov 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00155 | DOB VIOLATION - ACTIVE |
| Aug 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00218 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00422 | DOB VIOLATION - ACTIVE |
| Oct 23, 2017 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER UNDER APPLICATIO N # 122816612 (EW-OT) DUE TO WITHDRAWAL OF APPLICANT OF CONSTRUCTION UNABLE TO DETERMINE % OF WORK COMPLETED. STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION TO BOROUGH COMMI SSIONER IMMEDIATELY #0604SK | DOB VIOLATION - ACTIVE |
| Sep 27, 2017 | PLUMBING THE DEPARTMENT OF BUILDINGS INTENDS TO REVOKE ALL PLUMBING APPROVALS & PERMITS UNDER APPLICATION #122020801.DUE TO CONTRACTOR WITHDRAWL.STOP ALL PLUMBING WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE #PL0601OH | DOB VIOLATION - ACTIVE |
| Feb 13, 2017 | FACADE SAFETY PROGRAM #HAZ86511 | DOB VIOLATION - ACTIVE |
| Feb 15, 2012 | CONSTRUCTION #0301MT | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 2, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Aug 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 13, 2017 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 7:05 PM ET. BBL 1008657501.