6 floors · 54 apartments · 60,775 sq ft · built 1927 · class D1 · owner of record: 211 Bedford Park Blvd Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3306). Agency page | Dec 31, 2026 in 61 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 60,775 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-06 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 8, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. DOB FTC-VIO #120325PI20703ZT, DOB FTC-CONTROL #350385, DATED 12/03/25. NO COMPLIANCE ON FILE FOR A CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S #35718850R | Jun 10, 2027 DEFAULT | $12,500 |
| Jan 7, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES.-NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #2 NORTH(1) CRACKED/SPALLING BRICK MULTI LOC. AT WINDOW SPANDRELS (2)DEFECTIVE/SPALLING WINDOW SILLS MULTI #35726317Z | Mar 20, 2026 DEFAULT | $25,000 |
| Nov 10, 2025 | Elevators CLASS - 1 RESPONDING TO A 311 ELEVATOR COMPLAINT. UPON INSPECTION OF COMPLAINT, CEASE USE VIOLATION WAS ISSUED FOR, ROPE GRIPPER NOT WORKING. AND OVER HEAD CAR SHEAVE BEARING WORN. REMEDY. REPAIR THEN CONTACT NYCDOB FOR #39168485J | Feb 20, 2026 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Dec 3, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER#347963 VIO#102725PI20701TC DATED 10/27/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 11/26/25 & START BLDG REOAIRS UNDER PERMIT BY 12/26/25&COMPL/SIGNED OFF BY 1/20/26 AS OF 12/03/25 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER#347963 VIO #PI20703ZT | DOB VIOLATION - ACTIVE |
| Oct 27, 2025 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD VERT CRACK IN MORTAR @ EXP1/4 CORNER. OBSVD CRACKED & SPALLING MASONRY @ EXP2 NEAR 2/3 CORNER OBSVD DETERIORATED WINDOW LINTEL @ EXP3. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG AND TO SUBMIT A CORRECTIVE ACTION PLAN BY 11/26/2025. BLDG TO BE REP #PI20701TC | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 9, 2026 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Oct 12, 2026 |
| Jul 9, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Oct 12, 2026 |
| Jul 9, 2026 | A | § 27-2022 ADM CODE POST A SIGN INDICATING HOURS OF COLLECTION AND METHOD OF COLLECTION OF WASTE MATERIAL WHERE DUMBWAITER SERVICE IS NOT PROVIDED. AT PUBLIC HALL, 1st STORY | Oct 12, 2026 |
| Jul 9, 2026 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX MISSING AT PUBLIC HALL, 1st STORY | Oct 12, 2026 |
| Jul 9, 2026 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Oct 12, 2026 |
| Jun 25, 2026 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Sep 28, 2026 |
| Aug 6, 2025 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL COMPONENTS AT 1ST AND 2ND FIRE ESCAPE FROM WEST AT SOUTH EXTERIOR WALL AT FIRE ESCAPE | Nov 9, 2025 |
| Jul 16, 2025 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Oct 19, 2025 |
| Mar 31, 2025 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING | Jul 4, 2025 |
| Sep 20, 2024 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Dec 24, 2024 |
| Sep 20, 2024 | C | Apt 5E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Oct 16, 2024 |
| Sep 20, 2024 | B | § 67 M/D LAW POST A PRINTED SCALE FLOOR PLAN SHOWING MEANS OF EGRESS, AT BY ELEVATOR AT 4TH STORY | Oct 25, 2024 |
| Sep 20, 2024 | B | § 67 M/D LAW POST A PRINTED SCALE FLOOR PLAN SHOWING MEANS OF EGRESS, AT BY ELEVATOR AT 3RD STORY | Oct 25, 2024 |
| Sep 20, 2024 | B | § 67 M/D LAW POST A PRINTED SCALE FLOOR PLAN SHOWING MEANS OF EGRESS, AT BY ELEVATOR AT 2ND STORY | Oct 25, 2024 |
| Sep 20, 2024 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING SIGN | Dec 24, 2024 |
| Sep 20, 2024 | C | Apt 5E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Oct 16, 2024 |
| Sep 20, 2024 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT AT 1ST FIRE ESCAPE FROM WEST [ BUILDING FRONT ] | Dec 24, 2024 |
| Sep 20, 2024 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT AT 2ND FIRE ESCAPE FROM WEST [ BUILDING FRONT ] | Dec 24, 2024 |
| Sep 20, 2024 | B | § 67 M/D LAW POST A PRINTED SCALE FLOOR PLAN SHOWING MEANS OF EGRESS, AT BY ELEVATOR AT 5TH STORY | Oct 25, 2024 |
| Sep 16, 2024 | C | Apt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT UPPER FRAME NORTH WALL IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 22, 2024 |
| Sep 10, 2024 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL COMPONENTS ALL BALCONIES ALL STYS AT 1ST FIRE ESCAPE AND 2ND FIRE ESCAPE FROM WEST AT SOUTH EXTERIOR WALL (BULIDING FRONT) | Dec 14, 2024 |
| Aug 29, 2024 | C | Apt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT UPPER WINDOW FRAME IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 4, 2024 |
| Aug 29, 2024 | A | Apt 5E · § 27-2005 HMC: REFIT CABINET DOORS IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 2, 2024 |
| Aug 29, 2024 | B | Apt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT CENTER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 3, 2024 |
| Aug 29, 2024 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Dec 2, 2024 |
| Aug 29, 2024 | C | Apt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT UPPER WINDOW FRAME IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 4, 2024 |
| Aug 29, 2024 | A | Apt 5E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT UPPER WINDOW FRAME IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 2, 2024 |
| Apr 9, 2024 | A | Apt 2E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTH AT EAST | Jul 13, 2024 |
| Aug 28, 2023 | C | Apt 1G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 23, 2023 |
| Aug 28, 2023 | C | Apt 1G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 23, 2023 |
| Apr 25, 2023 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT BULKHEAD , SECTION AT NORTH | Jul 29, 2023 |
| Apr 25, 2023 | B | Apt 5C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF VERMIN FLIES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH | May 30, 2023 |
| Apr 25, 2023 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING AT BULKHEAD , SECTION AT NORTH | May 30, 2023 |
| Mar 2, 2023 | B | Apt 5C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''MMM'' | Apr 6, 2023 |
| Sep 7, 2021 | C | Apt 5C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH | Oct 3, 2021 |
| Sep 7, 2021 | C | Apt 5C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH | Oct 3, 2021 |
| Aug 30, 2021 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL BALCONIES, ALL STACKS, ALL STYS AT FIRE ESCAPE | Dec 3, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 9, 2026 | HPD A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Open |
| Jul 9, 2026 | HPD A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Open |
| Jul 9, 2026 | HPD A | § 27-2022 ADM CODE POST A SIGN INDICATING HOURS OF COLLECTION AND METHOD OF COLLECTION OF WASTE MATERIAL WHERE DUMBWAITER SERVICE IS NOT PROVIDED. AT PUBLIC HALL, 1st STORY | Open |
| Jul 9, 2026 | HPD A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX MISSING AT PUBLIC HALL, 1st STORY | Open |
| Jul 9, 2026 | HPD A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 11:55 AM ET. BBL 2033060053.