3 floors · 41,907 sq ft · built 1939 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-17 (Accepted). Agency page | Dec 31, 2026 in 59 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 41,907 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 180 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 180 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 424 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 13, 2026 | Construction CLASS - 2 REISSUE: 35717277Z DATE OF ISSUE: 06/16/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT EXIT-8 AND MAIN ENTRANCE 4 BROKEN WINDOWS ABOVE DOORS. REMEDY #35732897P | Jun 18, 2026 POP/IN-VIO | $0 |
| May 13, 2026 | Construction CLASS - 2 REISSUE: 35717276R DATE OF ISSUE: 06/16/2025. FAILURE TO MAITNAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGESAND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION #35732898R | Jun 18, 2026 POP/IN-VIO | $0 |
| May 13, 2026 | Construction CLASS - 2 REISSUE: 35717278K DATE OF ISSUE: 06/16/2026. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT BULKHEADS STAIR B AND C, WATER PENETRATION SPALLING AT CEILIN #35732896N | Jun 18, 2026 POP/IN-VIO | $0 |
| Jun 16, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT EXIT 8AND MAIN ENTRANCE 4 BROKEN WINDOWS ABOVE DOORS. REMEDY: REPAIR AND/OR REPLACE WINDOWS. #35717277Z | Aug 27, 2025 POP/IN-VIO | $0 |
| Jun 16, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED AT 4 FLOOR BOX #25, 26 3FL. #23, 2FL. #18, 19, 1FL. #6 AND AUDITO #35717276R | Aug 27, 2025 POP/IN-VIO | $0 |
| Jun 16, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT BULKHEADS STAIR B AND C WATER PENETRATION, SPALLING AT CEILINGS AND WALLS. REMEDY: REPAIR AND/OR REPLACE. #35717278K | Aug 27, 2025 POP/IN-VIO | $0 |
| Oct 19, 2021 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS-SIDEWALK SHED NOT MAINTAINED AS REQUIRED.NOTE AT THE TIME OF MY INSPECTION,OBSERVED SIDEWALK SHED INSTALLED ON PEDESTRIAN WALKWAY AT EXP1 AND 3 ARE NOT MA #35505975L | Aug 1, 2022 IN VIOLATION | $0 |
| Aug 12, 2021 | Site Safety CLASS - 1 SUPERINTENDENT FAILED TO PERFORM DUTIES. NOTE: AT THE TIME OF MY INSPECTION OF A 3 STY BLDG W/ACTIVE WORK IN PROGRESS; I REQUESTED TO SEE THE SUPERINTENDENT LOG BOOK,PRESHIFT SAFETY MEETING & ORIENTATION,& NONE #35582830J | Nov 9, 2021 DEFAULT | $25,000 |
| Aug 10, 2019 | Construction CLASS - 2 JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. NOTED: AT TIME OF INSPECTION I OBSERVED SITE FOR WHICH A CS IS REQUIR ED WITH THE CONSTRUCTION FENCE NOT SOLID PLYWOOD, THE FENCE IS CONST #35441282Z | Oct 15, 2019 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 3:46 AM ET. BBL 4073160018.